Modules

jaif.or.jp

Modules

Tracking No. 00.00.2010

33

Site Development and Site-Specific

Scope

• Site-specific Buildings and Structures

– Mechanical Draft Cooling Towers w/ basins (6 ea) or

– Natural Draft Cooling Towers w/ basins (2 ea)

– Cooling Tower discharge Flume/mixing structures (2 ea)

– Circ Water Pumphouse (2 ea)

– Load Center Buildings (6 ea)

– River Water Intake Structure

– Waste Water Treatment Basins (2 ea)

– Clarifier – Mech/Elec Bldg and 2 tanks

– Hydrogen Storage Tanks (2 ea)

– Switchyard Control Building

– Waste Water Blowdown Sump

More magazines by this user
Similar magazines