20.03.2014 Views

Technical Rider Megalopolis - Key Performance

Technical Rider Megalopolis - Key Performance

Technical Rider Megalopolis - Key Performance

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Constanza Macras / DORKY PARK - “MEGALOPOLIS” PAGE1of11<br />

TECHNICAL REQUIREMENTS<br />

The following technical requirement represents the ideal conditions<br />

under which the company wishes to operate. Any modifications must<br />

be negotiated between the presenter and Dorky Park.<br />

Closer to the date of the performance we will provide<br />

adapted lighting plans, stage layout plans, confirmed schedule.<br />

In order to prepare those plans in advance the presenter is asked to send all relevant<br />

plans and inventory lists as soon as possible. Ground plan and section view should show<br />

audience seating and rake and should not be of a scale less than 1 : 50, and also CAD<br />

plans if possible.<br />

March 2nd, 2010


Constanza Macras / DORKY PARK - “MEGALOPOLIS” PAGE2of11<br />

TECHNICAL REQUIREMENTS<br />

General description of the set<br />

The set consists of a black glossy dance floor with a layer of soft floor underlay. On the floor are<br />

two houses 2,17cm high, one left 3m wide , one right 6m wide with roofs to walk on. The space<br />

between the houses makes a corridor which should be at least 2m wide. A 2m deep and 6m long<br />

bridge (Zarge) is fixed on the houses and over the corridor between them, connecting the two roofs<br />

. Roof tops and bridge (Zarge) are also covered with dance floor and there is a railing surrounding<br />

the roof tops on the sides and the back edges. The third house is a „high rise“ with maximum 8,5m<br />

height. The height is adjustable to a smaller room to a minimum of 5m height. Behind the houses<br />

at the very back of the scene is a painted backdrop which is fixed to a traverse frame. There are<br />

two video screens, one left 4,65m wide, one right 3m wide on triangle steel frames placed in the<br />

front of the houses , as well as a billboard of 2,5m width placed on the roof top of the right house.<br />

The band is placed under the left side screen where there is a big pile of rubble consisting of<br />

mainly carton boxes , pillows, cloth and clothes and plastic bags. Under the right side screen is a<br />

wooden „telephone corner „ counter with plastic stools to it.<br />

We bring:<br />

• The set, the props, the costumes.<br />

We require:<br />

STAGE<br />

• Dimensions:<br />

- 20m wide x 15m deep dancing area. As the wings are visible, the whole stage<br />

must be empty and clean.<br />

• Floor:<br />

- A clean and even floor, covered with blue dance mat, 20m x 12m, side to side (we<br />

bring).<br />

- 20 x 12m soft material to lay under the dance floor, 2-3mm thick - parquet<br />

insulating underlay (extruded polystyrene heavy foam around 2.2 mm thick for<br />

floating installation of laminate floors and prefabricated parquet), cork, foam rubber<br />

or similar.<br />

• Masking:<br />

- 20 x 9m black back drop, flat, no pleats and piped for a straight edge.<br />

• Goods:<br />

- A truss frame to support the back drop must be lifted with help of motors of fly<br />

battens and fixed .<br />

- The structure of the 3 rd house (8,5m high) must be lift with help of motors or fly<br />

battens.<br />

- Material to lift the structures (ropes, slings, shackles, safety chains, hooks,<br />

carabiner, pulley system, etc)<br />

- A safety device to prevent falling (the company brings), used by a dancer to climb<br />

the 3 rd house, must be fixed directly to the grid.<br />

- Basic theatre tools, battery drill, saw, etc.<br />

- A forklift is necessary to load in and out.


Constanza Macras / DORKY PARK - “MEGALOPOLIS” PAGE3of11<br />

TECHNICAL REQUIREMENTS<br />

LIGHTING<br />

All changes to adjust the lighting design to your theatre have to be discussed in advance.<br />

Contact: Sergio Pessanha, sergiopessanha@t-online.de<br />

The lighting requires a separate voltage supply (230V, 50 Hz, 16A), power distributor and<br />

cables. The lighting direction needs direct view onto the stage. If necessary, adapters for<br />

the European SCHUKO system are needed.<br />

ON STAGE<br />

04 X FRESNEL or PC - 1 kw - with barn<br />

38 X FRESNEL or PC - 2 kw - with barn doors<br />

01 X FRESNEL 5kw – with barn-doors<br />

06 X PAR 64 – 1kw – CP 60<br />

20 X PAR 64 – 1kw – CP 62<br />

02 X PAR 36<br />

10 X PROFILES 12º/30º - 1 kw<br />

04 X PROFILES 15º/40º - 1kw<br />

04 X FLOOD asymmetric – 2kw – for cyclorama<br />

05 X FLOOD symmetric - 500w<br />

12 X FLUORESCENT TUBES – daylight 40 w – dimmable<br />

FOH<br />

09 X PROFILE 15º/40º - 2KW<br />

LIGHT CONSOLE AND DIMMERS<br />

Light console: full programmable computer desk able to control 120 dimmers.<br />

Possibility of in and out times, links, loops, delay and wait times.<br />

Dimmers: 120 x 2,5kw and 1 x 5kw<br />

OTHERS<br />

01 x Smoke machine<br />

Cables as needed.<br />

4 X floor stands – for PAR 64.<br />

06 X booms 2m high.


Constanza Macras / DORKY PARK - “MEGALOPOLIS” PAGE4of11<br />

TECHNICAL REQUIREMENTS<br />

Colour filters:<br />

Lee # 117 - Steel Blue - 01 5kw Fresnel<br />

Lee #200 - Double C.T. Blue - 01 1kw PC<br />

Lee # 201 - Full C.T. Blue - 07 2kw Fresnel or PC, 3 1kw PC and 07 PAR 64<br />

Lee # 179 - Chome Orange - 02 2kw Profile<br />

Lee #126 - Mauve - 06 1kw PAR 64<br />

Lee #142 - Pale Violet - 04 1kw PAR 64<br />

Lee #228 - Brushed Silk - 04 1kw PAR 64<br />

Rosco #114 - Hamburg Frost - 1kw and 2kw PCs (all of them, if in use).<br />

Note:<br />

Equipment must be in good condition with working shutters, irises and barn doors where needed.<br />

The presenter will also provide gel frames, hooks, and sufficient amount of cables and gels<br />

according to the lighting plot.<br />

There’s use of fire and smoke on stage for about 4 minutes each.


Constanza Macras / DORKY PARK - “MEGALOPOLIS” PAGE5of11<br />

TECHNICAL REQUIREMENTS<br />

SOUND<br />

All changes to adjust the sound design to your theatre have to be discussed in advance.<br />

Contact: Stephan Wöhrmann<br />

stephanwoehrmann@web.de<br />

The sound requires a separate voltage supply (230V, 50 Hz, 16A), power distributor and<br />

cables. The sound direction needs direct view onto the stage and clean power supply.<br />

Sound booth should be in the same acoustical space as the audience – not in a control<br />

room or under balconies.<br />

Equipment to be provided by the venue<br />

Mixing desk:<br />

40/8/8/2 , 8 auxiliaries pre/post, VCA groups<br />

Midas XL 3/4/ Heritage/ Legend or<br />

Yamaha PM 3500 or 4000 ... or equivalent<br />

Periphery:<br />

1 x CD player<br />

4 x compressor: dbx, BSS ...<br />

1 x digital reverb, Lexicon PCM 91 (o.e.)<br />

1 x digital delay (time correction), BSS TCS 804 (o.e.)<br />

Mikrophones:<br />

4 x Shure SM 58<br />

1 x Shure Beta 91: Bassdrum<br />

2 x: Shure SM 57: Snaredrum 1+2<br />

2 x Condensermic: OH for drums.( AKG C 451, MKH 40 ...)<br />

1 x Sennheiser MD 421: Big Drum<br />

2 x Condensermic: Piano ( Neumann KM 140, AKG C 451,...)<br />

1 x shotgunmic: to be hung above stage (Neumann KMR 81, Sennheiser MKH 60 ...)<br />

2 x condensermic: installed in the „call centre“ (Neumann KM 140, Sennheiser MKH 40 ...)<br />

1 x boundary mic hypercardio (Crown PCC 160)<br />

1 x boundary mic omnidirectional<br />

1x wireless mic, handheld, UHF: Shure or Sennheiser SKM 5000<br />

4 x pockettransmitter UHF: Shure or Sennheiser<br />

+ 3 x microphonecapsule, omnidirectional (MKE 2)<br />

+ 2 x headset, (no Sennheiser!!!)<br />

+ 1 x clip<br />

1 x Adaptor jack - transmitter (Jack - Lemo for Sennheiser).<br />

4 x suitable receiver UHF with amplification<br />

8 x DI Box, active<br />

11 x micstand ( 3 x small, 8 x large)


PA system:<br />

Constanza Macras / DORKY PARK - “MEGALOPOLIS” PAGE6of11<br />

TECHNICAL REQUIREMENTS<br />

High Quality, powrful PA system, appropriate to the accoustic conditions of the space.<br />

Separate subwoofers, center cluster, delay line (If necessary).<br />

Preferred brands are: d&b, L-acoustics, Meyer, Nexo,<br />

Monitoring:<br />

- 3 x monitor for musicians ( wedges)<br />

- 1 x monitor on the floor, stage right (d&b C 6)<br />

- 1 x monitor on a stand or hung, stage left (d&b C 6)<br />

- 1 x small speaker on the rooftop (d&b E 3, not bigger in size!!!)<br />

all necessary cables / adaptors / patches to connect the system<br />

Intercom: 3 x beltpack/ headset on one circuit<br />

VIDEO<br />

The video requires a separate voltage supply (230V, 50 Hz, 16A), power distributor and<br />

cable. The video direction needs direct view onto the stage and clean power supply.<br />

Flexible hanging structure and stand for the beamer is requested. If necessary, adapters<br />

for the European ‘Schuko’ system are needed.<br />

-2 x Video beamer, 6.000 Ansilumen, able to support 16:9 format. with lens to project<br />

images one 4,65m wide, other 3m wide. - distance from the screen: variable, minimum<br />

12m; height aprox. 8m. THE SCREEN SIZE IS NOT VARIABLE as it part of the set.<br />

- 2 x VGA Connection 1280x720px<br />

The company brings:<br />

-Matrox VGA Splitter<br />

-Apple MacBook Pro<br />

COMUNICATION SYSTEM (INTERCOMS)<br />

• 4 x belt pack/ headset on one circuit.<br />

• All cabling/ patches/adapters to connect the system.


Constanza Macras / DORKY PARK - “MEGALOPOLIS” PAGE7of11<br />

TECHNICAL REQUIREMENTS<br />

WARDROBE<br />

ALL COSTUME CHANGES ARE TAKING PLACE ON THE STAGE DURING THE SHOW.<br />

ONE POSITION OF MAKE-UP ON THE STAGE INCLUNDING MIRROR AND LIGHT.<br />

1. STAFF<br />

- 01 Staff Member, 5 hours daily, in the evening after the show and in the morning for<br />

washing, drying, ironing and repairing.<br />

- 01 Staff Member, 10 hours daily, the same for costume, to help in the back stage during<br />

run through and each performance.<br />

2. WASHING; DRYING AND REPAIRING<br />

- 02 Washing Machines<br />

- 02 Dryers<br />

- 01 Spin Dryer<br />

- 01 Place with steam iron and sewing machine<br />

- Chemical Cleaning Facility close to the venue<br />

- Possibly Shoe Repairing close to the venue<br />

- 12 Standard Towels (about 0,40m x 0,80m) for each run through and each performance<br />

- 12 Shower Towels (about 0,60m x 1,40m) for each run through and each performance<br />

*The Towels have to be provided by the Organizer<br />

3. BEHIND SET<br />

- 15 Chairs behind Set<br />

- 02 Costumes Stands on wheels behind the set (ca. 1,50m to 2,00m)<br />

- 02 Laundry Baskets behind the set<br />

4. DRESSING ROOMS<br />

06 Dancers (female)<br />

04 Dancers (male)<br />

02 Musician (female)<br />

01 Musicians (male)<br />

05 Technicians<br />

01 Tour Manager


Constanza Macras / DORKY PARK - “MEGALOPOLIS” PAGE8of11<br />

TECHNICAL REQUIREMENTS<br />

MAKE UP<br />

1. STAFF<br />

- 01 Staff Member 05 hours daily for Make-Up, 2 hours before the Show starts and during<br />

each <strong>Performance</strong><br />

2. BEHIND THE SET<br />

- 01 Make-up table with light behind the set.<br />

- 01 Box of tissues each performance.<br />

DRESSING ROOMS<br />

- Completely equipped separate dressing rooms with full height mirrors for 10 Dancers (6<br />

female and 4 male) and 03 Musicians (02 female and 01 male).<br />

- One separate room for 6 Technicians.<br />

- One separate room for 1 Production/Tour Manager.<br />

- Temperature in the dressing rooms should be 22°C.<br />

- Lounges in the dancers dressing rooms.<br />

- Enough space for make-up in the dressing rooms.<br />

- Toilette und shower facilities (no public lavatory) with hot and cold water and showers.<br />

- Sufficient drinking water (without gas) in bottles: 30 Litters (in 0,5l to 1,5l bottles) for<br />

rehearsals and for each show.<br />

- Fruits and sandwiches.<br />

PROPS<br />

- The company brings the props.


Constanza Macras / DORKY PARK - “MEGALOPOLIS” PAGE9of11<br />

TECHNICAL REQUIREMENTS<br />

TECHNICAL STAFF<br />

Any change to this schedule has to be discussed immediately with the company<br />

This schedule assumes that on our arrival:<br />

- the floor is levelled<br />

- all required lighting and sound equipment is in the theatre<br />

- soft goods and hanging hardware are available<br />

- in warehouses (etc.) the platform and a grid is already build<br />

- a local experienced crew is available<br />

As a crew for the load in and initial construction of the set we will need:<br />

- 1 head technician/facility manager at space to check lists, discuss production schedule,<br />

rentals. He should be present all the times the company is in the theatre.<br />

- 8 carpenters/riggers/fly men/props<br />

- 6 electricians<br />

- 3 sound technicians<br />

- 1 video technician<br />

- 1 wardrobe person<br />

- 1 make up artist<br />

As a running crew<br />

- 2 electrician familiar with the local lighting desk<br />

- 1 stage technician.<br />

- 2 sound tech. stand by<br />

- 1 video tech. stand by<br />

- 1 wardrobe person<br />

- 1 make up artist<br />

To Strike and load out:<br />

- 8 stage technicians<br />

- 2 lighting technicians<br />

- 2 sound technicians<br />

N.B.:<br />

• During load in and out, a forklift is necessary.<br />

• Before and after each rehearsal and show it’s necessary to clean the stage.


Constanza Macras / DORKY PARK - “MEGALOPOLIS” PAGE10of11<br />

TECHNICAL REQUIREMENTS<br />

SET UP SCHEDULE<br />

DORKY PARK<br />

Constanza Macras<br />

Sérgio Pessanha<br />

<strong>Technical</strong> Coordinator<br />

MEGALOPOLIS<br />

Personnel Theatre<br />

tel : +49(0)40 866 244 17<br />

fax : +49(0)40 866 244 21<br />

e mail : sergiopessanha@t-online.de<br />

NB : * 1 manager included.<br />

Stage *<br />

Lights *<br />

Sound *<br />

Video<br />

Wardrobe<br />

Make up<br />

preparations<br />

all stage, lighting, sound and video equipment<br />

should be at the theatre<br />

1st day<br />

8h00 12h00 unload and set up stage, lighting, sound, video 8 6 3 1 1<br />

record lighting memories<br />

12h00 14h00 lunch break (sound - line check)<br />

14h00 19h00 set up stage, lighting, sound, video 8 6 3 1 1<br />

16h00 17h00 video check, lighting soft patch 8 6 3 1 1<br />

17h00 19h00 focus 3 4 3 1 1<br />

19h00 20h00 dinner break<br />

20h00 24h00 focus 3 4<br />

2nd day<br />

9h00 12h00 set up band and sound check 3<br />

10h30 11h00 lighitng cue check 2 2 3 1<br />

11h00 12h00 video check - clean stage 2 2 3 1<br />

12h00 14h00 lunch break (dancers warming up on stage)<br />

14h00 15h00 sound check - spacing 2 2 2 1<br />

15h00 19h00 rehearsal 2 2 2 1 1<br />

19h00 20h00 dinner break - prepare costumes 1<br />

20h00 20h30 clean stage<br />

20h30 23h00 Run Through (with costumes) 2 2 2 1 1<br />

3rd day<br />

9h00 12h00 corrections (if necessary) 1 2 1 1 1<br />

12h00 14h00 lunch break<br />

13h00 14h00 dancers warming up on stage<br />

14h00 17h00 <strong>Technical</strong> Rehearsal 1 2 2 1 1<br />

17h00 18h00 clear stage - prepare costumes 1<br />

18h00 19h00 dinner break - make up 1 1<br />

19h00 19h30 stage for dancers - circle - cleaning stage 1 2 2 1 1 1<br />

20h00 22h00 20h00 : 1st. SHOW 1 2 2 1 1<br />

4th day<br />

17h00 18h00 clear stage - prepare costumes 1 2 1 1 1 1<br />

18h00 19h00 dinner break - 18h30 public talk - make up 1 1<br />

19h00 19h30 stage for dancers - circle - cleaning stage 1 2 2 1 1 1<br />

20h00 22h00 20h00 : 2nd. SHOW 1 2 2 1 1<br />

22h00 02h00 strike set and load truck 8 2 2 1


Constanza Macras / DORKY PARK - “MEGALOPOLIS” PAGE11of11<br />

TECHNICAL REQUIREMENTS<br />

SEATS<br />

some places for sound, video and lighting controls are to be cancelled. The sound tech or<br />

manager who knows the acoustic circumstances of the house should suggest the best<br />

position for the sound.<br />

Miscellaneous<br />

• Coffee, tea, non-sparkling mineral water, fruits and sanwiches for dancers and crew<br />

during set up period, rehearsals and performances.<br />

• Costumes must be washed and dried after each show.<br />

• The stage must be cleaned before and after each run through and performance.<br />

*Details and small changes on this tech rider may be discussed directly with the<br />

person responsible for each department.<br />

Stage: Boris Helmdach b.helmdach@gmx.de<br />

Lighting: Sergio Pessanha sergiopessanha@t-online.de<br />

Sound: Stephan Wöhrmann stephanwoehrmann@web.de<br />

Video: Tobias Götz toby@pfadfinderei.com<br />

Costumes: Marcus Cardoso marcusbc@web.de<br />

Tourmanagement:<br />

tourmanagement@dorkypark.org<br />

Rene Dombrowaki production@dorkypark.org<br />

Lisa Gobmeier office@dorkypark.org<br />

CONSTANZA MACRAS DORKYPARK GmbH<br />

Wolliner Strasse 08<br />

10 435 Berlin / Germany<br />

phone: (+49)30-280 42 420<br />

fax: (+49)30-280 47 674<br />

office@dorkypark.org<br />

www.dorkypark.org

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!