March 2009<br />

Layout Plans for Distribution Points<br />

Figures 2 through 8 are examples of plans for different sizes<br />

of distribution points and the resources required for<br />

operations.<br />

Note: It is required to calculate ice loss when it is<br />

stacked out in 80 - 100 degree heat for the day.<br />

Dumpsters<br />

W I M T<br />

CARS<br />

LOADING POINT<br />

Loading Point-<br />

3 Per Lane<br />

W I M T W I M T<br />

Stockpiles<br />

W I M T 3 Persons Per Loading Point<br />

- 1 for Water<br />

- 1 for Ice<br />

- 1 for MRE’s and Tarps<br />

Figure 2<br />

Water<br />

Ice<br />

MRE<br />

Tarp<br />

INITIAL RESPONSE Appendix F-8 RESOURCES