NVC in Block Laying and Concreting - NBTE
NVC in Block Laying and Concreting - NBTE
NVC in Block Laying and Concreting - NBTE
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>NVC</strong> <strong>in</strong> <strong>Block</strong> Lay<strong>in</strong>g <strong>and</strong> Concret<strong>in</strong>g (Draft)<br />
PROGRAMME: NATIONAL VOCATIONAL CERTIFICATE IN BLOCK LAYING AND CONCRETING<br />
COURSE: INTRODUCTION TO BUILDING CONSTRUCTION-2 COURSE CODE: VBC 202 CONTACT HOURS: 2-6-8<br />
COURSE SPECIFICATION: Theoretical Contents:<br />
Practical Contents:<br />
General Objective: 1.0: Underst<strong>and</strong> the Basic Pr<strong>in</strong>ciples of<br />
Construct<strong>in</strong>g Foundations.<br />
General Objective: 6.0 Design <strong>and</strong> Construct Simple Foundations for<br />
Domestic Build<strong>in</strong>gs.<br />
WEEK Specific Learn<strong>in</strong>g Objective Teachers Activities Resources Specific Learn<strong>in</strong>g Objective Teachers Activities Resources<br />
1.1 Def<strong>in</strong>e <strong>and</strong> expla<strong>in</strong> the • Show pictures of • Chalkboard<br />
.Show basic • Cement<br />
functions of foundation. excavat<strong>in</strong>g mach<strong>in</strong>es etc.<br />
* Organize <strong>and</strong> lay strip methods of • Mortar<br />
1.2 Describe the different types • Expla<strong>in</strong> the<br />
foundation under the construct<strong>in</strong>g • Aggregates<br />
of foundations <strong>in</strong>dicat<strong>in</strong>g functions of the • Films, clips, supervision by the foundation • Equipment<br />
their suitability.<br />
equipment.<br />
pictures, teacher.<br />
<strong>and</strong> tools<br />
1.3 State the problems that may<br />
sketches etc.<br />
be encountered dur<strong>in</strong>g the<br />
• Concrete<br />
1-5 construction work <strong>in</strong> the<br />
follow<strong>in</strong>g situations:-<br />
a. water logged site<br />
b. pit/alluvial soil<br />
c. congested one plot side<br />
d. site requir<strong>in</strong>g demolition<br />
of exist<strong>in</strong>g structures.<br />
1.4 Describe equipment <strong>and</strong><br />
methods used <strong>in</strong> excavat<strong>in</strong>g<br />
foundation trenches.<br />
1.5 Sketch <strong>and</strong> describe<br />
temporary supports to the<br />
sides of deep trenches <strong>in</strong><br />
various soils.<br />
12