NVC in Block Laying and Concreting - NBTE
NVC in Block Laying and Concreting - NBTE
NVC in Block Laying and Concreting - NBTE
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>NVC</strong> <strong>in</strong> <strong>Block</strong> Lay<strong>in</strong>g <strong>and</strong> Concret<strong>in</strong>g (Draft)<br />
12-15<br />
2.5 Outl<strong>in</strong>e the operational<br />
<strong>and</strong> safety precautions to be<br />
observed when fix<strong>in</strong>g<br />
cladd<strong>in</strong>gs.<br />
2.6 specify mortar for fix<strong>in</strong>g<br />
stone, concrete <strong>and</strong> granite<br />
cladd<strong>in</strong>gs<br />
2.7 Expla<strong>in</strong> the need for<br />
protection after fix<strong>in</strong>g<br />
cladd<strong>in</strong>gs<br />
2.8 Describe methods of<br />
stor<strong>in</strong>g <strong>and</strong> h<strong>and</strong>l<strong>in</strong>g<br />
cladd<strong>in</strong>gs on site.<br />
• Organize <strong>and</strong> execute<br />
under supervision the<br />
various operations <strong>in</strong><br />
fix<strong>in</strong>g cladd<strong>in</strong>g<br />
• Emphasis safety<br />
habits <strong>in</strong> h<strong>and</strong><strong>in</strong>g<br />
cladd<strong>in</strong>gs.<br />
• Illustrate the various<br />
methods of fix<strong>in</strong>g<br />
cladd<strong>in</strong>g<br />
• Specify <strong>and</strong> prepare<br />
mortar for fix<strong>in</strong>g the<br />
various cladd<strong>in</strong>gs.<br />
General Objective 3.0: Underst<strong>and</strong> the pr<strong>in</strong>ciples of pre -mixed General Objective 3.0: Apply textured render<strong>in</strong>g<br />
render<strong>in</strong>gs<br />
Week Specific Objective: Teachers Activities: Resources: Specific Objective: Teachers Activities Resources<br />
3.1 Describe the composition<br />
of tyrolean <strong>and</strong> state the<br />
properties of the base<br />
• Present samples of<br />
tyrolean <strong>and</strong> s<strong>and</strong>tex to<br />
the students<br />
• Tyrolean<br />
• S<strong>and</strong>tex,<br />
Water<br />
3.1 Apply santexttrowel<br />
<strong>and</strong> santex-matt<br />
accord<strong>in</strong>g to the<br />
*Guide tra<strong>in</strong>ee <strong>in</strong> the<br />
application of<br />
s<strong>and</strong>text <strong>and</strong><br />
• Tyrolean<br />
mach<strong>in</strong>e<br />
• cement,<br />
15-19<br />
suitable for its application.<br />
marker’s <strong>in</strong>struction tyrolean coat<strong>in</strong>g<br />
3.2 describe te method of • Estimate the quantity<br />
S<strong>and</strong>,<br />
application <strong>and</strong> cunn<strong>in</strong>g<br />
tyrolean<br />
3.3 Estimate the quantity of<br />
tyrolean required for a<br />
specified job<br />
of tyrolean required for<br />
a specified job.<br />
3.2 Execute the<br />
follow<strong>in</strong>g operations <strong>in</strong><br />
the application of<br />
tyrolean;<br />
s<strong>and</strong>text<br />
material<br />
Water<br />
•<br />
77