04.04.2014 Views

NVC in Block Laying and Concreting - NBTE

NVC in Block Laying and Concreting - NBTE

NVC in Block Laying and Concreting - NBTE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>NVC</strong> <strong>in</strong> <strong>Block</strong> Lay<strong>in</strong>g <strong>and</strong> Concret<strong>in</strong>g (Draft)<br />

General Objective 2.0: Know the pr<strong>in</strong>ciples <strong>and</strong> methods of<br />

h<strong>and</strong>l<strong>in</strong>g, plac<strong>in</strong>g <strong>and</strong> cur<strong>in</strong>g of concrete.<br />

General Objective 2.0: carryout h<strong>and</strong>l<strong>in</strong>g, plac<strong>in</strong>g <strong>and</strong> cur<strong>in</strong>g<br />

of concrete.<br />

Week Specific Objectives Teachers’ Activities Resources Specific Objectives Teachers’ Activities Resources<br />

8-12 2.1 Expla<strong>in</strong> the use of the<br />

follow<strong>in</strong>g equipment <strong>in</strong> wet<br />

concrete transport<strong>in</strong>g <strong>and</strong><br />

plac<strong>in</strong>g operations – head<br />

pan, steel concrete barrow,<br />

power barrow, tower crane<br />

skip, mobile truck mixer<br />

conveyor belt, pipe l<strong>in</strong>e.<br />

The teacher<br />

demonstrates with the<br />

students the use of<br />

the equipment <strong>in</strong> wet<br />

concrete transport<strong>in</strong>g<br />

<strong>and</strong> plac<strong>in</strong>g<br />

operations.<br />

The teacher practices<br />

• Head pan steel<br />

concrete barrow<br />

charts.<br />

•<br />

Rammer/tamper<br />

• Sketches <strong>and</strong><br />

charts of raft,<br />

pad, strip<br />

2.1Carry out concrete<br />

transportation plac<strong>in</strong>g<br />

<strong>and</strong> cur<strong>in</strong>g operations.<br />

Student should<br />

transport the already<br />

mixed concrete by any<br />

specified mode, place<br />

<strong>and</strong> cure the concrete<br />

Guide tra<strong>in</strong>ee <strong>in</strong><br />

plac<strong>in</strong>g <strong>and</strong> cur<strong>in</strong>g<br />

coconcrete<br />

• Concrete<br />

mix<br />

•<br />

Transportatio<br />

n equipment<br />

• Cur<strong>in</strong>g<br />

materials or<br />

equipment<br />

12-13<br />

2.2 State the precautions<br />

(operational <strong>and</strong> safety) to be<br />

taken when us<strong>in</strong>g the<br />

equipment <strong>in</strong> 8.1.<br />

2.3 Expla<strong>in</strong> the use of<br />

pumped <strong>and</strong> ready-mixed<br />

concrete tak<strong>in</strong>g <strong>in</strong>to account<br />

their relative advantages <strong>and</strong><br />

precautions to be taken<br />

dur<strong>in</strong>g application.<br />

with the students the<br />

use of pumped <strong>and</strong><br />

ready-mixed<br />

concrete.<br />

• The teacher<br />

demonstrates the use<br />

of common tools for<br />

compact<strong>in</strong>g wet<br />

concrete.<br />

foundations.<br />

• L<strong>in</strong>tel, bean &<br />

Column.<br />

• Floor slab,<br />

walls etc.<br />

• Cube mould.<br />

us<strong>in</strong>g appropriate<br />

materials/equipment as<br />

specified<br />

50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!