04.04.2014 Views

NVC in Block Laying and Concreting - NBTE

NVC in Block Laying and Concreting - NBTE

NVC in Block Laying and Concreting - NBTE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NVC</strong> <strong>in</strong> <strong>Block</strong> Lay<strong>in</strong>g <strong>and</strong> Concret<strong>in</strong>g (Draft)<br />

PROGRAMME: NATIONAL VOCATIONAL CERTIFICATE IN BLOCKLAYING AND CONCRETING<br />

MODULE: BLOCKLAYING -3 Module Code: VBC 311 Contact Hours: 1-9-10<br />

General Objective: 1.0: Underst<strong>and</strong> the Pr<strong>in</strong>ciples of Erect<strong>in</strong>g <strong>and</strong><br />

Dismantl<strong>in</strong>g of Scaffolds.<br />

General Objective: 1.0 Couple, Erect <strong>and</strong> Dismantle<br />

Scaffolds <strong>in</strong> Accordance with laid down Regulations<br />

Week Specific Objective: Teachers Activities Resources Specific Objective: Teachers Activities Resources<br />

1-7<br />

1.1 Describe with sketches<br />

the follow<strong>in</strong>g scaffolds.<br />

a. bracket scaffold<br />

b. putlog<br />

c. <strong>in</strong>dependent<br />

• The teacher lists the<br />

types of scaffolds,<br />

sketch <strong>and</strong> identify<br />

their parts.<br />

• Sketch a g<strong>in</strong> wheel as<br />

• Lesson plan<br />

• Real objects<br />

– g<strong>in</strong> wheel<br />

<strong>and</strong> cha<strong>in</strong><br />

• Pictures,<br />

Identify specific<br />

construction work<br />

requir<strong>in</strong>g the<br />

application of scaffold.<br />

Choose<br />

* Guide tra<strong>in</strong>ees<br />

through the process of<br />

selection, erection,<br />

construction,<br />

dismantl<strong>in</strong>g,<br />

* Timber,<br />

bamboo,<br />

steel pipes<br />

nails,<br />

hammer,<br />

d. trestle<br />

it is attached to posters of appropriate scaffold ma<strong>in</strong>tenance <strong>and</strong> p<strong>in</strong>cers,<br />

1.2 State situation where<br />

each is most suitably used.<br />

1.3 Identify the members.<br />

1.4 Expla<strong>in</strong> the relative<br />

advantage of timber <strong>and</strong><br />

tubular scaffold.<br />

1.5 Describe various hoist<strong>in</strong>g<br />

equipment for hoist<strong>in</strong>g<br />

material on site.<br />

a. g<strong>in</strong> wheel<br />

b. scaffold crane<br />

c. stationery crane<br />

d. mobile cranes<br />

1.6 Identify the components<br />

<strong>and</strong> uses.<br />

1.7 Erect a put log scaffold.<br />

1.8 Erect transom scaffold.<br />

1.9 Erect timber/bamboo<br />

scaffold.<br />

scaffold.<br />

• Sketch supports with<br />

bridle at w<strong>in</strong>dow<br />

open<strong>in</strong>g.<br />

• Identify safety<br />

precautions peculiar to<br />

scaffold<strong>in</strong>g <strong>and</strong> cranes.<br />

• Show each<br />

component <strong>and</strong> name.<br />

• Show tools necessary<br />

to erect i.e. spanner<br />

wrench etc. scaffold.<br />

• Demonstrate <strong>in</strong> steps<br />

the process of erection.<br />

• Plac<strong>in</strong>g the sole <strong>and</strong><br />

base plate at <strong>in</strong>terval<br />

with st<strong>and</strong>ards.<br />

cranes<br />

• Couplers<br />

• Other<br />

components.<br />

• Scaffold<br />

tubes<br />

• Couplers<br />

• Spanners<br />

• Wrench etc.<br />

suitable for the<br />

construction work.<br />

Couple/erect<br />

components of steel<br />

scaffold.<br />

Construct timber/<br />

bamboo scaffold.<br />

Dismantle <strong>and</strong><br />

store scaffold<br />

components correctly.<br />

Care <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong><br />

scaffold components.<br />

storage of scaffolds. saws, etc.,<br />

34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!