Example 12:<br />

No EU-procedure applied - <strong>the</strong> annual value of<br />

<strong>the</strong> supply was below <strong>the</strong> threshold, but <strong>the</strong> total<br />

value of <strong>the</strong> contract exceeded <strong>the</strong> threshold<br />

A Danish company approached its contact point<br />

because a Swedish municipality had entered into a<br />

2-years' supplies contract with an option of<br />

ano<strong>the</strong>r 2 years' supplies. The value of <strong>the</strong> annual<br />

supply was below <strong>the</strong> threshold for EU-procedure,<br />

but <strong>the</strong> value of <strong>the</strong> total contract - calculated as a 4<br />

years' contract - exceeded by far <strong>the</strong> threshold.<br />

Contact with <strong>the</strong> Swedish contact point had immediately<br />

<strong>the</strong> consequence that <strong>the</strong> municipality concerned<br />

acknowledged that a mistake had been<br />

made. However, as <strong>the</strong> contract already had been<br />

concluded, it was not possible for <strong>the</strong> Swedish contact<br />

point to alter anything at <strong>the</strong> actual moment<br />

but refer <strong>the</strong> complainant to <strong>the</strong> court with a claim<br />

for compensation.<br />

Still, <strong>the</strong> problem-solving method of <strong>the</strong> network<br />

co-operation has <strong>the</strong> advantage that it is based<br />

upon <strong>the</strong> persuasive power of <strong>the</strong> national competent<br />

procurement authority vis-à-vis <strong>the</strong> contracting<br />

authority concerned. The possibility in this<br />

case was that <strong>the</strong> Swedish contact point authority<br />

could influence <strong>the</strong> municipality concerned in<br />

order at least to prevent that <strong>the</strong> awarded contract<br />

was renewed under <strong>the</strong> option beyond <strong>the</strong> first 2-<br />

years' period. After some discussions between <strong>the</strong><br />

Swedish contact point and <strong>the</strong> municipality this<br />

result was obtained.<br />

This case is a very illustrative example of <strong>the</strong> practising<br />

of <strong>the</strong> problem-solving method described.<br />

Re: II.2. Problems are to be solved in a low-conflictual<br />

atmosphere<br />

Example 13:<br />

Short time limit for preparing <strong>the</strong> bid under <strong>the</strong><br />

Utilities Directive<br />

In a call for tenders carried out by a Norwegian<br />

contracting entity under <strong>the</strong> Utilities Directive -<br />

<strong>the</strong> restricted procedure - a company from ano<strong>the</strong>r<br />

country was selected as a candidate and received<br />

<strong>the</strong> tender <strong>document</strong>s 13 days before expiry of <strong>the</strong><br />

deadline for <strong>the</strong> entity's receipt of tenders. The<br />

contract <strong>document</strong>ation was voluminous (95<br />

pages) and in Norwegian language. Besides, a visit<br />

to <strong>the</strong> site was required.<br />

The company asked its contact point, whe<strong>the</strong>r it<br />

was acceptable to give such a short time limit without<br />

any reason.<br />

The time limit for receipt of tenders may be fixed<br />

by mutual agreement between <strong>the</strong> contracting<br />

entity and <strong>the</strong> selected candidates. In this case<br />

<strong>the</strong>re was no agreement in relation to <strong>the</strong> complaining<br />

company. The general rule is that, in <strong>the</strong><br />

absence of a mutual agreement, <strong>the</strong> time limit shall<br />

be at least 24 days from <strong>the</strong> date of <strong>the</strong> invitation to<br />

tender and in any case no less than 10 days. The<br />

time allowed shall be sufficiently long to take<br />

account in particular among o<strong>the</strong>rs voluminous<br />

<strong>document</strong>ation and <strong>the</strong> need for a visit to <strong>the</strong> site.<br />

27