preliminary final report & june quarterly update - Leighton Holdings
preliminary final report & june quarterly update - Leighton Holdings
preliminary final report & june quarterly update - Leighton Holdings
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
• $541m for contract mining services at the Orebody<br />
23/25 iron ore mine, Newman, WA, for BHP Billiton.<br />
• $229m for mining operations at the Challenger gold<br />
mine, north west of Adelaide, SA, for Dominion Mining.<br />
• $190m for mining services at Woodie Woodie<br />
manganese mine, Pilbara region, WA for Pilbara<br />
Manganese Pty Ltd.<br />
• $190m for mining services at the Rotowaro coal mine,<br />
Huntley, North Island, NZ, for Solid Energy New<br />
Zealand.<br />
• $168m for mining operations at the Favona gold mine,<br />
Waihi, North Island, NZ, for Newmont.<br />
• $276m ($138m) for contract mining services at the<br />
Cockatoo Island iron ore mine, WA, for Portman<br />
Mining.<br />
• $103m for mining services at the Wattle Dam gold<br />
mine, WA, for Ramelius Resources.<br />
Broad<br />
• $95m to construct two 6 storey office buildings in<br />
Perth, WA, for CHOF 5 Pier Street Pty Ltd.<br />
• $41m to extend and refurbish an existing shopping<br />
centre in Mount Sheridan, Cairns, QLD, for Green<br />
Group Property Investments Pty Ltd.<br />
• $476m ($238m) for the design and construction of<br />
seven new state schools, South East QLD, for Aspire<br />
Schools.<br />
• $96m to construct housing and infrastructure for<br />
indigenous communities (SIHIP), Darwin, NT & Perth,<br />
WA, for the Australian, WA & NT Governments.<br />
Telecommunications<br />
• $718m contract to provide telecommunication field<br />
services, Auckland, NZ, for Chorus (Telecom New<br />
Zealand).<br />
• $250m to provide fibre construction, design and<br />
project management, to the Regional Backbone<br />
Blackspots Program (RBBP), for the Department of<br />
Broadband Communications & the Digital Economy.<br />
• $67m to operate and maintain an emergency alerting<br />
system, across various areas, Vic, for the Department<br />
of Justice.<br />
Thiess<br />
• $757m for approximately 13km of new expressway<br />
from the Newcastle link road at the F3 west to Kurri<br />
Kurri, including 24 bridges, NSW, for RTA.<br />
• $354m to design and construct mine infrastructure for<br />
the Pakri Barwadih coal Mine, India, for NTPC Ltd.<br />
• $214m ($107m) for a 5.5km extension of dual track<br />
heavy rail from Noarlunga to Seaford, SA, for the Dept<br />
of Transport Energy and Infrastructure.<br />
• $210m for bulk earthworks and selected infrastructure<br />
at the Jimblebar iron ore mine, WA, for BHP Billiton.<br />
• $202m alliance for project management and civil<br />
works for installation of a 132kV transmission cable,<br />
Sydney, NSW, for Energy Australia.<br />
• $147m for construction of upstream gas processing<br />
facilities, Chinchilla, QLD, for QGC.<br />
• $106m to demolish and rebuild infrastructure, Goodna,<br />
QLD, for Ipswich Water.<br />
• $83m for training and access management system<br />
project early works, Moranbah, QLD, for BMA Coal.<br />
• $4.14bn ($2.07bn) joint venture for the construction of<br />
the Airport Link tollroad, Northern Busway (Windsor to<br />
Kedron) and Airport Roundabout Upgrade, Brisbane,<br />
QLD, for BrisConnections.<br />
• $3.74bn for mining operations at the Burton coal mine,<br />
Glenden, QLD, for Peabody Energy Australia.<br />
• $3.35bn for mining operations at the Mt Owen coal<br />
mine, Singleton, NSW, for Xstrata.<br />
• $3.5bn ($2.32bn) joint venture to design and construct<br />
the Victorian Desalination Plant, Wonthaggi, VIC, for<br />
the Department of Sustainability and Environment.<br />
• $2.74bn for mining operations at the Collinsville coal<br />
mine, Collinsville, QLD, for the Collinsville Coal<br />
Company.<br />
• $945m for mining operations at the Prominent Hill<br />
copper-gold mine, SA, for Oz Minerals.<br />
• $800m for mining operations at the Curragh North coal<br />
project, Blackwater, QLD, for Wesfarmers Curragh Pty<br />
Ltd.<br />
• $797m for mining services at the Wilpinjong coal mine,<br />
Wollar, NSW, for Peabody Energy Australia.<br />
• $742m for mining services at the Lake Vermont coal<br />
mine, Dysart, QLD, for Lake Vermont Resources.<br />
• $736m for the construction of the Royal North Shore<br />
Hospital Redevelopment, Sydney, NSW, for<br />
Infrashore.<br />
• $729m ($243m) for engineering, procurement and<br />
construction of the Gorgon Village, Barrow Island, WA,<br />
for Chevron Australia.<br />
• $583m to upgrade the Tulla to Sydney Road section of<br />
the M80 Ring Road, Tullamarine, VIC, for VicRoads.<br />
• $581m for site preparation and temporary construction<br />
facilities at the Gorgon LNG Project, Barrow Island,<br />
WA, for Chevron Australia.<br />
• $527m for mining and coal processing at the Tarong<br />
coal project, Kingaroy, QLD, for Tarong Energy<br />
Corporation Limited.<br />
• $376m to design and construct the Lotus Glen<br />
Correctional Centre, Mareeba, QLD, for Queensland<br />
Corrective Services.<br />
• $265m for mining operations at South Walker Creek<br />
Mine, Bowen Basin, QLD, for BHP Mitsui Coal Pty Ltd<br />
(BMC).<br />
• $123m for the construction of the King George Central<br />
building, Brisbane, QLD, for <strong>Leighton</strong> Properties.<br />
• $112m ($56m) to design and construct the northern<br />
section of the Brighton Bypass, Tasmania, for the Dept<br />
of Infrastructure, Energy and Resources.<br />
• $97m for the construction of the Townsville Hospital<br />
upgrade, Townsville, QLD, for Queensland Health.<br />
• $62m to develop and construct wastewater<br />
infrastructure, Ipswich, QLD, for Queensland Urban<br />
Utilities.<br />
• $54m for construction of 19 rail sidings and associated<br />
earthworks infrastructure, Newport, VIC, for Metro<br />
Trains Melbourne.<br />
• $76m for site preparation at the QCLNG gas plant,<br />
Gladstone, for Bechtel Australia.<br />
PT Thiess Contractors Indonesia<br />
• US$4.08bn for contract mining at the Senakin and<br />
Satui coal mines, South Kalimantan, Indonesia, for PT<br />
Arutmin Indonesia.<br />
• US$2.74bn for mining services and related works at<br />
the KPC (Sangatta) coal mine, East Kalimantan,<br />
Indonesia, for Kaltim Prima Coal.<br />
• US$888m for mining services at the Bayan FKP coal<br />
mine, East Kalimantan, Indonesia, for Gunung Bayan<br />
Pratama Coal PT.<br />
Thiess Services<br />
• $373m ($279m) for passive fibre network construction<br />
for first stage of the NBN works in ACT, NSW and<br />
QLD, for NBN Co.<br />
<strong>Leighton</strong> <strong>Holdings</strong> Limited JUNE 2011 QUARTERLY UPDATE Page 44