• $75m for construction of a product load-out jetty and<br />
operations jetty at the QCLNG site, QLD, for QGC.<br />
• $67m ($40m) for activation and enabling works at<br />
Southern Cross Station for the Regional Rail Link<br />
project, Melbourne, for Metro Trains Melbourne Pty<br />
Ltd.<br />
• $66m ($44m) for managing contractor role to deliver<br />
pressure reducing valves and other ancilliary works for<br />
the North South Interconnection System Project, SA,<br />
for SA Water Corporation.<br />
• $65m to construct marine offloading facilities at the<br />
QCLNG site, QLD, for QGC.<br />
• $60m for expansion and refurbishment of existing<br />
morgue facilties, Melbourne, VIC, for Department of<br />
Justice.<br />
• $55m for construction of a bulk liquids berth at Port<br />
Botany, NSW, for Sydney Ports Corporation.<br />
• $44m for expansion of Carousels 6 & 7 and Gates 18<br />
& 20 at Melbourne Airport for Australia Pacific Airports.<br />
• $41m to construct 4.5 km of sewer with cross<br />
connections, Eight Mile Plains, QLD, for Queensland<br />
Urban Utilities.<br />
• $7.03bn ($1.41bn) to operate and maintain the<br />
metropolitan rail network, Melbourne, VIC, for the<br />
Department of Transport.<br />
• $4.14bn ($2.07bn) for the construction of the Airport<br />
Link tollroad, Northern Busway (Windsor to Kedron)<br />
and Airport Roundabout Upgrade, Brisbane, QLD, for<br />
BrisConnections.<br />
• $488m ($244m) alliance to construct water<br />
infrastructure, Canberra, ACT, for ACTEW<br />
Corporation.<br />
• $348m alliance to strengthen the Westgate Bridge,<br />
Melbourne, VIC, for Vic Roads.<br />
• $342m for mining operations at the Isaac Plains coal<br />
mine, Moranbah, QLD, for Isaac Plains Coal<br />
Management.<br />
• $282m to construct Stage 1 of the Northern Sewerage<br />
project, Melbourne suburbs, VIC, for Melbourne Water.<br />
• $281m alliance to construct rail works between<br />
Maitland and Whittingham, NSW, for the Australian<br />
Rail Track Corporation.<br />
• $261m for the delivery of the South Morang Rail<br />
Extension Project, VIC, for the Victorian Government.<br />
• $230m to maintain rail infrastructures, WA, for<br />
WestNet Rail.<br />
• $229m to construct the Melbourne Airport terminal<br />
expansion, VIC, for Australia Pacific Airports.<br />
• $198m to deliver a 5 year program of works including<br />
major civil, rail, signalling and overhead traction works,<br />
NSW, for Rail Corporation.<br />
• $178m to construct onshore processing facilities and<br />
pipelines for the Devil Creek Development Project,<br />
WA, for Apache Energy.<br />
• $170m alliance to upgrade water infrastructure,<br />
Barwon Region, Vic, for Barwon Region Water<br />
Corporation.<br />
• $166m for the replacement of sewers, Melbourne<br />
suburbs, VIC, for Melbourne Water.<br />
• $160m ($60m) JV for the delivery of trackwork<br />
upgrade to the Adelaide metropolitan passenger rail<br />
network, Adelaide, SA, for the Department of<br />
Transport, Energy & Infrastructure.<br />
• $134m alliance to construct the Western Highway<br />
Realignment, Bacchus Marsh, VIC, for VicRoads.<br />
• $108m to construct the Middlemount coal rail loop,<br />
QLD, for Middlemount Coal.<br />
• $96m ($48m) to construct extra facilities and<br />
infrastructure as part of Stage 1 of the Kapooka<br />
project, Kapooka, NSW, for the Department of<br />
Defence.<br />
• $95m management contract to deliver track, station<br />
upgrade and signalling works at Liverpool station,<br />
NSW, for TIDC.<br />
• $83m to construct new facilities and the refurbishment<br />
of existing working accommodation, training, and<br />
storage accommodation, Sth East QLD, for the<br />
Department of Defence.<br />
• $78m to construct a new heavy maintenance facility,<br />
Melbourne, VIC, for Department of Transport.<br />
• $69m to construct additional facilities at the Cessnock<br />
Correctional Centre, Newcastle, NSW, for the<br />
Department of Corrective Services.<br />
• $48m to construct an emergency department, 70 bed<br />
public ward, & 12 new theatres, WA, for Joondalup<br />
Hospital Pty Ltd.<br />
• $47m to construct 21 buildings including stores and<br />
warehouse, QLD, for Department of Defence.<br />
• $40m to expand the wireless network throughout rural<br />
Australia for Optus.<br />
<strong>Leighton</strong> Asia<br />
• US$561m (US$135m) joint venture to design and<br />
construct sludge treatment facilities at Tuen Mun, for<br />
VW-VES (HK) Ltd.<br />
• US$322m to construct 1.8 km of elevated viaduct and<br />
two elevated stations with footbridge connections, for<br />
MTR Corporation Limited.<br />
• US$278m (US$139m) joint venture to construct a cut<br />
and cover approach tunnel for West Kowloon<br />
Terminus, for MTR Corporation Ltd.<br />
• US$237m (US$130m) joint venture to construct<br />
railway tunnels between the Aberdeen Channel Bridge<br />
and the proposed South Horizons Station, for MTR<br />
Corporation Limited.<br />
• US$168m for mining operations at Martabe gold mine,<br />
Indonesia, for PT Agincourt Resources.<br />
• US$163m to construct a cut and cover tunnel for the<br />
Highways Department of the Hong Kong Government.<br />
• US$122m (US$61m) to construct the Sungei Road<br />
Rail Station together with twin tunnels of approximately<br />
770m, for the Land Transport Authority of Singapore.<br />
• US$79m to prepare site and bulk earthworks in<br />
preparation for gold mining and processing plant at<br />
Martabe, North Sumatra, for PT Agincourt Resources.<br />
• US$45m for site preparation work for JGC<br />
Corporation.<br />
• US$42m to modifiy works to the Black Point Power<br />
Station in preparation for a new gas supply due in<br />
2013, for the China Light & Power Limited.<br />
• US$2.81bn for mining operations at the Wahana coal<br />
mine, Indonesia, for PT Wahana Baratama Mining.<br />
• US$1.24bn for mining operations at MSJ coal mine,<br />
Indonesia, for PT Mahakam Sumber Jaya.<br />
• US$1.17bn for mining services at the Ukhaakhudag<br />
(UHG) coal mine, Mongolia, for Energy Resources<br />
LLC.<br />
• US$439m (US$330m) for construction of Express Rail<br />
tunnels and associated ventilation and access<br />
structures between Tse Uk Tseun in Kam Tin and<br />
Shek Yam in Kwai Chung, Hong Kong, for MTR<br />
Corporation Limited.<br />
• US$322m for mining operations at the Masbate gold<br />
mine, Philippines, for the Philippines Gold Processing<br />
& Refining Corporation.<br />
• US$298m to design and build the Ukhaa Khudag to<br />
Gashuun Sukhait freight railway in the South Gobi<br />
region of Mongolia, for Energy Resources Rail LLC.<br />
• US$259m (US$130m) for installation, deep excavation<br />
and protection works for the Central Reclamation<br />