• $75m for construction of a product load-out jetty and<br />

operations jetty at the QCLNG site, QLD, for QGC.<br />

• $67m ($40m) for activation and enabling works at<br />

Southern Cross Station for the Regional Rail Link<br />

project, Melbourne, for Metro Trains Melbourne Pty<br />

Ltd.<br />

• $66m ($44m) for managing contractor role to deliver<br />

pressure reducing valves and other ancilliary works for<br />

the North South Interconnection System Project, SA,<br />

for SA Water Corporation.<br />

• $65m to construct marine offloading facilities at the<br />

QCLNG site, QLD, for QGC.<br />

• $60m for expansion and refurbishment of existing<br />

morgue facilties, Melbourne, VIC, for Department of<br />

Justice.<br />

• $55m for construction of a bulk liquids berth at Port<br />

Botany, NSW, for Sydney Ports Corporation.<br />

• $44m for expansion of Carousels 6 & 7 and Gates 18<br />

& 20 at Melbourne Airport for Australia Pacific Airports.<br />

• $41m to construct 4.5 km of sewer with cross<br />

connections, Eight Mile Plains, QLD, for Queensland<br />

Urban Utilities.<br />

• $7.03bn ($1.41bn) to operate and maintain the<br />

metropolitan rail network, Melbourne, VIC, for the<br />

Department of Transport.<br />

• $4.14bn ($2.07bn) for the construction of the Airport<br />

Link tollroad, Northern Busway (Windsor to Kedron)<br />

and Airport Roundabout Upgrade, Brisbane, QLD, for<br />

BrisConnections.<br />

• $488m ($244m) alliance to construct water<br />

infrastructure, Canberra, ACT, for ACTEW<br />

Corporation.<br />

• $348m alliance to strengthen the Westgate Bridge,<br />

Melbourne, VIC, for Vic Roads.<br />

• $342m for mining operations at the Isaac Plains coal<br />

mine, Moranbah, QLD, for Isaac Plains Coal<br />

Management.<br />

• $282m to construct Stage 1 of the Northern Sewerage<br />

project, Melbourne suburbs, VIC, for Melbourne Water.<br />

• $281m alliance to construct rail works between<br />

Maitland and Whittingham, NSW, for the Australian<br />

Rail Track Corporation.<br />

• $261m for the delivery of the South Morang Rail<br />

Extension Project, VIC, for the Victorian Government.<br />

• $230m to maintain rail infrastructures, WA, for<br />

WestNet Rail.<br />

• $229m to construct the Melbourne Airport terminal<br />

expansion, VIC, for Australia Pacific Airports.<br />

• $198m to deliver a 5 year program of works including<br />

major civil, rail, signalling and overhead traction works,<br />

NSW, for Rail Corporation.<br />

• $178m to construct onshore processing facilities and<br />

pipelines for the Devil Creek Development Project,<br />

WA, for Apache Energy.<br />

• $170m alliance to upgrade water infrastructure,<br />

Barwon Region, Vic, for Barwon Region Water<br />

Corporation.<br />

• $166m for the replacement of sewers, Melbourne<br />

suburbs, VIC, for Melbourne Water.<br />

• $160m ($60m) JV for the delivery of trackwork<br />

upgrade to the Adelaide metropolitan passenger rail<br />

network, Adelaide, SA, for the Department of<br />

Transport, Energy & Infrastructure.<br />

• $134m alliance to construct the Western Highway<br />

Realignment, Bacchus Marsh, VIC, for VicRoads.<br />

• $108m to construct the Middlemount coal rail loop,<br />

QLD, for Middlemount Coal.<br />

• $96m ($48m) to construct extra facilities and<br />

infrastructure as part of Stage 1 of the Kapooka<br />

project, Kapooka, NSW, for the Department of<br />

Defence.<br />

• $95m management contract to deliver track, station<br />

upgrade and signalling works at Liverpool station,<br />

NSW, for TIDC.<br />

• $83m to construct new facilities and the refurbishment<br />

of existing working accommodation, training, and<br />

storage accommodation, Sth East QLD, for the<br />

Department of Defence.<br />

• $78m to construct a new heavy maintenance facility,<br />

Melbourne, VIC, for Department of Transport.<br />

• $69m to construct additional facilities at the Cessnock<br />

Correctional Centre, Newcastle, NSW, for the<br />

Department of Corrective Services.<br />

• $48m to construct an emergency department, 70 bed<br />

public ward, & 12 new theatres, WA, for Joondalup<br />

Hospital Pty Ltd.<br />

• $47m to construct 21 buildings including stores and<br />

warehouse, QLD, for Department of Defence.<br />

• $40m to expand the wireless network throughout rural<br />

Australia for Optus.<br />

<strong>Leighton</strong> Asia<br />

• US$561m (US$135m) joint venture to design and<br />

construct sludge treatment facilities at Tuen Mun, for<br />

VW-VES (HK) Ltd.<br />

• US$322m to construct 1.8 km of elevated viaduct and<br />

two elevated stations with footbridge connections, for<br />

MTR Corporation Limited.<br />

• US$278m (US$139m) joint venture to construct a cut<br />

and cover approach tunnel for West Kowloon<br />

Terminus, for MTR Corporation Ltd.<br />

• US$237m (US$130m) joint venture to construct<br />

railway tunnels between the Aberdeen Channel Bridge<br />

and the proposed South Horizons Station, for MTR<br />

Corporation Limited.<br />

• US$168m for mining operations at Martabe gold mine,<br />

Indonesia, for PT Agincourt Resources.<br />

• US$163m to construct a cut and cover tunnel for the<br />

Highways Department of the Hong Kong Government.<br />

• US$122m (US$61m) to construct the Sungei Road<br />

Rail Station together with twin tunnels of approximately<br />

770m, for the Land Transport Authority of Singapore.<br />

• US$79m to prepare site and bulk earthworks in<br />

preparation for gold mining and processing plant at<br />

Martabe, North Sumatra, for PT Agincourt Resources.<br />

• US$45m for site preparation work for JGC<br />

Corporation.<br />

• US$42m to modifiy works to the Black Point Power<br />

Station in preparation for a new gas supply due in<br />

2013, for the China Light & Power Limited.<br />

• US$2.81bn for mining operations at the Wahana coal<br />

mine, Indonesia, for PT Wahana Baratama Mining.<br />

• US$1.24bn for mining operations at MSJ coal mine,<br />

Indonesia, for PT Mahakam Sumber Jaya.<br />

• US$1.17bn for mining services at the Ukhaakhudag<br />

(UHG) coal mine, Mongolia, for Energy Resources<br />

LLC.<br />

• US$439m (US$330m) for construction of Express Rail<br />

tunnels and associated ventilation and access<br />

structures between Tse Uk Tseun in Kam Tin and<br />

Shek Yam in Kwai Chung, Hong Kong, for MTR<br />

Corporation Limited.<br />

• US$322m for mining operations at the Masbate gold<br />

mine, Philippines, for the Philippines Gold Processing<br />

& Refining Corporation.<br />

• US$298m to design and build the Ukhaa Khudag to<br />

Gashuun Sukhait freight railway in the South Gobi<br />

region of Mongolia, for Energy Resources Rail LLC.<br />

• US$259m (US$130m) for installation, deep excavation<br />

and protection works for the Central Reclamation<br />

<strong>Leighton</strong> <strong>Holdings</strong> Limited JUNE 2011 QUARTERLY UPDATE Page 46