- Page 1 and 2: 2010-064 SUP 10-01 AT&T CLEGG Telec
- Page 3 and 4: 2010-064 SUP 10-01 AT&T CLEGG Telec
- Page 5 and 6: 2010-064 SUP 10-01 AT&T CLEGG Telec
- Page 7 and 8: visitors 6. Regional partnerships t
- Page 9 and 10: 2010-064 SUP 10-01 AT&T CLEGG Telec
- Page 11 and 12: TOWN OF MORRISVILLE * PO BOX 166 *
- Page 13 and 14: PREPARED BY: TOWN OF MORRISVILLE PL
- Page 15 and 16: SUPPORTING EVIDENCE FOR SPECIAL USE
- Page 17 and 18: EXHIBIT A harmony with the area in
- Page 19 and 20: EXHIBIT B 8) Towers located on top
- Page 21 and 22: EXHIBIT B notification letters to t
- Page 23 and 24: Antenna Reg Lat: 35° 51' 33.3'' N
- Page 25 and 26: EXHIBIT 2 2399 Weaver Forest Way, M
- Page 27 and 28: EXHIBIT 4 Proposed Telecommunicatio
- Page 29 and 30: Figure 3: Map of AT&T Mobility’ C
- Page 31 and 32: Based upon the ANSI/FCC standard an
- Page 33 and 34: PHOTO RENDERING PROVIDED BY TOWER E
- Page 35 and 36: PHOTO RENDERING PROVIDED BY TOWER E
- Page 37 and 38: PHOTO RENDERING PROVIDED BY TOWER E
- Page 39 and 40: PHOTO RENDERING PROVIDED BY TOWER E
- Page 41: PHOTO RENDERING PROVIDED BY TOWER E
- Page 45 and 46: PHOTO RENDERING PROVIDED BY TOWER E
- Page 47 and 48: PHOTO RENDERING PROVIDED BY TOWER E
- Page 49 and 50: PHOTO RENDERING PROVIDED BY TOWER E
- Page 51 and 52: PHOTO RENDERING PROVIDED BY TOWER E
- Page 53 and 54: PHOTO RENDERING PROVIDED BY TOWER E
- Page 55 and 56: PHOTO RENDERING PROVIDED BY TOWER E
- Page 57 and 58: PHOTO RENDERING PROVIDED BY TOWER E
- Page 59: PHOTO RENDERING PROVIDED BY TOWER E
- Page 62 and 63: RICARDO M III & MICHELLETA P RAZON
- Page 64 and 65: A copy of this determination will b
- Page 67 and 68: EXHIBIT 10
- Page 69 and 70: EXHIBIT 10
- Page 71 and 72: EXHIBIT 10
- Page 73 and 74: EXHIBIT 10
- Page 75 and 76: EXHIBIT 10
- Page 77 and 78: June 3, 2010 Ms. Jill House Project
- Page 79 and 80: CERTIFICATION The undersigned does
- Page 81 and 82: SCOPE OF THE ASSIGNMENT This consul
- Page 83 and 84: Street Atlas USA® 2008 Data use su
- Page 85 and 86: DATE OF THE ANALYSIS The effective
- Page 87 and 88: HISTORY OF THE PROPERTY The subject
- Page 89 and 90: ASSUMPTIONS AND LIMITING CONDITIONS
- Page 91 and 92: NEIGHBORHOOD DESCRIPTION The genera
- Page 93 and 94:
Conclusion This is one of the more
- Page 95 and 96:
The telecommunications tower will b
- Page 97 and 98:
of 1 http://imaps.co.wake.nc.us/ima
- Page 99:
Craig D. Smith, MAI 19
- Page 102 and 103:
Sales Data Presentation The analyst
- Page 104 and 105:
The four sale properties have been
- Page 106 and 107:
Interior view within Heritage Pines
- Page 108 and 109:
The next step in the analysis is to
- Page 110 and 111:
The six home sales within the Cobbl
- Page 112 and 113:
Interior view within Cobble Ridge I
- Page 114 and 115:
Special Considerations/Assumptions
- Page 116 and 117:
APPRAISER QUALIFICATIONS CRAIG D. S
- Page 118 and 119:
Western portion of subject tract in
- Page 120 and 121:
EXHIBIT 14 Stormwater Impact Analys
- Page 122 and 123:
Revised 06/03/10 Site Description:
- Page 127 and 128:
FIGURE 3
- Page 129 and 130:
North Carolina 35.8592 N 78.8497 W
- Page 131:
FIGURE 7
- Page 134 and 135:
Table 1B Flow Summary Table for Dra
- Page 136 and 137:
Revised 06/03/10 Appendix B
- Page 138 and 139:
T shallow = 1.36 Paved Section(s):
- Page 140 and 141:
T shallow = 0.63 Paved Section(s):
- Page 142 and 143:
Culvert Design Calculations - Culve
- Page 144 and 145:
Culvert Design Calculations - Culve
- Page 146 and 147:
Clegg_Design Routing_Post_DA1 Type
- Page 148 and 149:
Clegg_Design Routing_Post_DA1 Type
- Page 150 and 151:
Clegg_Design Routing_Post_DA1 Type
- Page 152 and 153:
Clegg_Design Routing_Post_DA1 Type
- Page 154 and 155:
Clegg_Design Routing_Post_DA1 Type
- Page 156 and 157:
Revised 06/03/10 Appendix E
- Page 158 and 159:
Clegg_Design Routing_Post_DA2 Type
- Page 160 and 161:
Clegg_Design Routing_Post_DA2 Type
- Page 162 and 163:
Clegg_Design Routing_Post_DA2 Type
- Page 164 and 165:
Clegg_Design Routing_Post_DA2 Type
- Page 166 and 167:
Clegg_Design Routing_Post_DA2 Type
- Page 168 and 169:
XVIII. Flexible Design Option: ....
- Page 170 and 171:
F. Additional requirements for cert
- Page 172 and 173:
VIII. GRADING AND DRAINAGE PLAN: A.
- Page 174 and 175:
10. Extend sewer to all upstream ar
- Page 177 and 178:
4. Supporting calculation Z. The fo
- Page 179 and 180:
EXHIBIT 16
- Page 181 and 182:
EXHIBIT 16 6. Was the proposed site
- Page 183 and 184:
EXHIBIT 17
- Page 185 and 186:
EXHIBIT 17
- Page 199 and 200:
EXHIBIT 19
- Page 201:
R-6 CU R-6 CU ^ Proposed RMF CU NC