24.04.2014 Views

Governor Phillip Park Plan of Management - Pittwater Council ...

Governor Phillip Park Plan of Management - Pittwater Council ...

Governor Phillip Park Plan of Management - Pittwater Council ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Draft <strong>Governor</strong> <strong>Phillip</strong> <strong>Park</strong> <strong>Plan</strong> <strong>of</strong> <strong>Management</strong><br />

4.10 Lower Western Picnic / <strong>Park</strong>ing Area<br />

Issue Strategy Action Responsibility Priority Capital<br />

cost $<br />

The children’s playground and period picnic<br />

shelters are used year-round due to their<br />

location at the entrance to the park. The<br />

picnic shelters give a heritage feel to the<br />

park, and provide good shelter and seating.<br />

The location <strong>of</strong> the existing playground is<br />

suitable for a regional children’s playground,<br />

given its prominent location and protection<br />

from the elements.<br />

The playground equipment needs upgrading,<br />

which can occur in the confines <strong>of</strong> the fenced<br />

area. The sand base and fencing provide a<br />

measure <strong>of</strong> safety but can be improved.<br />

The picnic area requires refurbishment, and<br />

re-landscaping.<br />

The southern part <strong>of</strong> the Lower Western<br />

Picnic/<strong>Park</strong>ing Area is the lowest point <strong>of</strong> the<br />

park. Drainage is a problem in<br />

this area as a stormwater drain flows into the<br />

playground area on the western side which<br />

needs diverting.<br />

The grass in this area suffers from a lack <strong>of</strong><br />

water in dry periods.<br />

Unrestricted parking throughout the area and<br />

the presence <strong>of</strong> large shade trees had<br />

resulted in much <strong>of</strong> the turf being lost or<br />

badly worn.<br />

Upgrade the children's<br />

playground and period<br />

picnic shelter area to<br />

facilitate an improved<br />

recreational setting.<br />

Provide a pleasant<br />

setting for picnics in<br />

the lower western area<br />

<strong>of</strong> the park.<br />

Improve drainage <strong>of</strong><br />

the lower western area<br />

in the park.<br />

Ensure adequate<br />

watering <strong>of</strong> this area.<br />

Establish a series <strong>of</strong><br />

small defined parking<br />

areas to cater for users<br />

<strong>of</strong> the adjoining picnic<br />

areas, and to protect<br />

existing trees and<br />

turfed areas from<br />

unrestricted parking.<br />

Upgrade the children’s<br />

playground to regional<br />

status, with additional<br />

equipment and improved<br />

s<strong>of</strong>tfall.<br />

Upgrade the picnic<br />

shelters.<br />

Replace the existing<br />

barbecues.<br />

Divert stormwater<br />

drainage to Ocean Road.<br />

Investigate the feasibility<br />

<strong>of</strong> a water detention pond<br />

or water feature<br />

associated with the<br />

children’s playground.<br />

Design and construct a<br />

water feature, if feasible.<br />

Carry out bore tests to<br />

locate groundwater.<br />

Install an irrigation<br />

system.<br />

Continue corall fencing <strong>of</strong><br />

the car parking areas.<br />

Replace turf as required.<br />

Reserves and<br />

Recreation<br />

Reserves and<br />

Recreation<br />

Maintenance Performance measure<br />

cost $<br />

High 200,000 - Regional children’s<br />

playground is established.<br />

High 50,000 - Picnic shelters are in good<br />

condition.<br />

Reserves and<br />

Recreation<br />

Medium 60,000 - Barbecues are replaced.<br />

Urban Infrastructure Medium 5,000 - Stormwater is diverted to<br />

Ocean Road.<br />

Urban Infrastructure Medium 15,000 - Feasibility <strong>of</strong> a pond or water<br />

feature is determined.<br />

Urban Infrastructure Low 100,000 - Water feature is constructed if<br />

feasible.<br />

Urban Infrastructure Medium 10,000 - Bore tests completed.<br />

Urban Infrastructure Medium 30,000 - Irrigation system is installed.<br />

Reserves and<br />

Recreation<br />

Reserves and<br />

Recreation<br />

High 60,000 - Corall fencing <strong>of</strong> parking areas<br />

is completed.<br />

Medium 10,000 - Complete grass cover <strong>of</strong> the<br />

area.<br />

<strong>Pittwater</strong> <strong>Council</strong> October 2002 53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!