Governor Phillip Park Plan of Management - Pittwater Council ...
Governor Phillip Park Plan of Management - Pittwater Council ...
Governor Phillip Park Plan of Management - Pittwater Council ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Draft <strong>Governor</strong> <strong>Phillip</strong> <strong>Park</strong> <strong>Plan</strong> <strong>of</strong> <strong>Management</strong><br />
Section Item $ Total $<br />
4.9 Palm Beach Golf Course (cont..)<br />
Strengthen tree stands within fairway boundaries with native species 20,000<br />
<strong>Plan</strong>t native trees along outside <strong>of</strong> new fence 40,000<br />
Divert Stormwater into underground tank for irrigation 10,000 420,000<br />
4.10 Lower Western Picnic and <strong>Park</strong>ing Area<br />
Upgrade children’s playground to regional playground 200,000<br />
Upgrade picnic shelters 50,000<br />
Replace existing barbecues 60,000<br />
Divert stormwater to Ocean Road 5,000<br />
Investigate feasibility <strong>of</strong> water feature 15,000<br />
Design and construct water feature 100,000<br />
Carry out bore tests to locate groundwater 10,000<br />
Install irrigation system 30,000<br />
Continue corall fencing <strong>of</strong> carparks 60,000<br />
Replace turf as required 10,000 540,000<br />
4.11 Former Ranger’s Cottage and Environs<br />
Design and implement a landscape scheme for the grassed area 100,000<br />
<strong>Plan</strong>t Hibiscus gardens 25,000 125,000<br />
5.2 <strong>Park</strong> Boundaries<br />
Beach Road Reserve Boundary<br />
Prepare concept plan for pathway between Beach Road and Palm Beach 5,000<br />
Construction <strong>of</strong> pathway and dish drain 100,000<br />
Seek risk management advice regarding golf course fences 5,000<br />
Random planting <strong>of</strong> trees and shrubs along golf course boundary fences 40,000<br />
Prepare “main entry” design 5,000<br />
Construct main park entry 100,000<br />
Design <strong>of</strong> signage for park entry points 5,000<br />
Rationalise signage at park entry points 15,000<br />
<strong>Pittwater</strong> / Station Beach shoreline<br />
Prepare hydraulic engineering report on erosion <strong>of</strong> Station Beach 5,000<br />
Address beach erosion 150,000<br />
Implement recommended erosion mitigation measures 100,000<br />
Erect removable bollards at Station Beach vehicle access point 2,000<br />
Erect sign at Station Beach carpark 2,500<br />
Boatshed / Kiosk Lease boundary<br />
Prepare lease agreement and landscape masterplan 5,000 539,500<br />
5.3 Vehicle and pedestrian access<br />
Prepare layout for internal roads and parking areas 5,000<br />
Install traffic speed devices 10,000<br />
Install speed warning signs 2,000<br />
Repair sealed surface <strong>of</strong> internal road 100,000<br />
Designate bus parking / lay-by zone 500<br />
Trial <strong>of</strong> bus spaces 500 118,000<br />
5.4 Landscape Development and Building Standards<br />
Replace lighting poles with Federation lamps on Beach Road 80,000<br />
Develop standard design details for park furniture and structures 10,000<br />
Increase shade provided in carparks 50,000 140,000<br />
5.5 Recreational Facilities, Amenities and Interpretation<br />
Prepare detailed designs for improvement <strong>of</strong> recreational opportunities in<br />
each park zone. 10,000<br />
Prepare a Heritage Conservation <strong>Plan</strong> 10,000<br />
Prepare Interpretation Strategy 5,000<br />
Low-key interpretive signage throughout the park 60,000<br />
Install litter recycling bins 60,000 145,000<br />
TOTAL 3,758,000<br />
<strong>Pittwater</strong> <strong>Council</strong> October 2002 75