29.04.2014 Views

View the spacewalk timeline - Nasa

View the spacewalk timeline - Nasa

View the spacewalk timeline - Nasa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

US EVA 23 MBSU MLI REMOVAL (00:45)<br />

IV/SSRMS<br />

EV2 – Luca Parmitano<br />

15. Secure zenith MLI Flaps at Corners along<br />

blind mate connectors (2 Short Wire<br />

Ties, 3 twists)<br />

16. Secure nadir MLI Flaps at corners of MBSU<br />

(2 short Wire Ties, 3 twists)<br />

17. WVS close-out imagery<br />

18. If time/lighting permit, take photos of skirt tiedown config & AMS<br />

Fwd edge MBSU (near primary bolt)<br />

Zenith edge MBSU (Near dog house)<br />

Nadir edge MBSU<br />

Photos of AMS forward/stbd sides<br />

Tie-down flap locations on MBSU<br />

MBSU MLI Medium ORU Bag<br />

RET (Lg-sm) (tape large hook)<br />

Adj Equip Te<strong>the</strong>r (Lg sm)<br />

Fish Stringer<br />

Wire Tie Caddy<br />

Small ISS Trash Bag<br />

Ratchet Wrench w/ 7/16 (rigid) 2”ext<br />

EVA Scissors<br />

CLPA Lens Cover MLI<br />

CLPA Lens Cover (old)<br />

Small Comp. Cutter (if located) (hook 6)<br />

RET (sm-sm) (to outside front fwd loops)<br />

MBSU MLI<br />

19. Stow Small ISS Trash Bag / Wire Tie Caddy in MBSU MLI Bag on Fish Stringer<br />

20. Inventory & stow MBSU MLI Bag on BRT<br />

21. Retrieve Camera from temp stow location (if stowed)<br />

22. Perform glove inspection<br />

23. Translate to <strong>the</strong> A/L<br />

Retrieve green hook S1 HR 3217 (near MM 5850)<br />

24. Open <strong>the</strong>rmal Cover<br />

25. Stow MBSU MLI MED ORU Bag<br />

26. If Time permits: Go To EVA GET AHEAD Procedure, else CLEAN UP<br />

2. Start A/L Thermal Cover Clock ______ (00:30)<br />

3. Stop A/L Thermal Cover Clock ______<br />

7/12/2013 EVA 23 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!