29.04.2014 Views

View the spacewalk timeline - Nasa

View the spacewalk timeline - Nasa

View the spacewalk timeline - Nasa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

US EVA 23 GETAHEADS – S1 P-CLAMP RELEASE<br />

IV/SSRMS<br />

1. Verify STBD TRRJ locked at 0<br />

P-Clamp<br />

#<br />

Bolt 1<br />

Nadir<br />

Bolt 2<br />

Nadir<br />

Bolt 3<br />

Nadir<br />

Bolt 1<br />

Zenith<br />

Bolt 2<br />

Zenith<br />

Bolt 3<br />

Zenith<br />

S1 Hose Box P-Clamps<br />

Tools Needed Released<br />

PGT with 6" wobble<br />

Needs Ratchet w/ 6”<br />

(Prox to RJMC)<br />

Needs Ratchet w/ 6”<br />

(Prox to RJMC)<br />

PGT with 6" wobble<br />

PGT with 6" wobble<br />

Needs Ratchet w/ 6”<br />

(Prox to RJMC)<br />

x<br />

x<br />

EV<br />

S1 FHRC HOSE BOX P-CLAMP RELEASE – BAY 13 (00:35)<br />

MCC-H Coord only, Verify STBD TRRJ Locked at 0<br />

1. Translate to <strong>the</strong> A/L; open <strong>the</strong>rmal cover<br />

2. Stow bag/hardware on A/L RET<br />

3. Retrieve Crewlock Bag on BRT<br />

4. Egress A/L<br />

5. Close A/L <strong>the</strong>rmal cover<br />

6. √SAFER handles down (NOTE: Periodically check SAFER handles while in Truss)<br />

7. Translate to S1 FHRC Bay 13<br />

8. Attach Safety Te<strong>the</strong>r green hook to S1 HR 3239<br />

CAUTION<br />

Do not impart loads greater than 15 lb into FHRC Hose Box fluid lines<br />

9. If needed, temp stow Crewlock Bag<br />

10. Retrieve EVA Ratchet Wrench w/<br />

7/16 (wobble) Socket-6 ext<br />

11. Translate to Nadir P-Clamps<br />

12. Release Hose Box P-clamps<br />

6-12.5 turns with Ratchet Wrench<br />

Bolt 2 Nadir<br />

Bolt 3 Nadir<br />

13. Stow EVA Ratchet Wrench on MWS<br />

14. Configure PGT:<br />

[A7 (9.2), CCW2, 30.5]<br />

7/16 (wobble) Socket-6 ext<br />

15. Release Hose Box P-clamps<br />

~6-12.5 turns<br />

Bolt 1 Nadir<br />

16. Stow PGT<br />

17. Translate to Zenith P-Clamps<br />

18. Configure PGT:<br />

[A7 (9.2), CCW2, 30.5]<br />

7/16 (wobble) Socket-6 ext<br />

19. Release Hose Box P-clamps ~6-12.5 turns<br />

Bolt 1 Zenith<br />

20. Egress Bay 13<br />

21. √SAFER handles down<br />

22. Stow Ratchet Wrench in Crewlock Bag; Stow Crewlock Bag on BRT<br />

7/12/2013 EVA 23 44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!