02.05.2014 Views

1976-05-11 BCC Meeting Minutes - Orange County Comptroller

1976-05-11 BCC Meeting Minutes - Orange County Comptroller

1976-05-11 BCC Meeting Minutes - Orange County Comptroller

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Meeting</strong> May <strong>11</strong>, <strong>1976</strong> Page 357<br />

Florida<br />

Power Corp<br />

Upon motion by Commissioner Benham, seconded by Commissioner Thomas,<br />

and carried, Florida Power Corporation was granted permission to install<br />

a 3(/,, 7200V overhead crossing on Plymouth-Sorrento Road, 670 feet South<br />

of Lent Road.<br />

Amick<br />

Construction<br />

Upon motion by Commissioner Benham, seconded by Commissioner Thomas,<br />

and carried, Amick Construction Company was granted permission to install<br />

6'' PVC SDR21 Water Main for Woodstock Subdivision by open cut method on<br />

Powers Drive between North Lane and Clarcona Road subject to the following<br />

stipulations:<br />

(a)<br />

(b)<br />

That traffic be maintained;<br />

Underground Utility Permit.<br />

Fill<br />

Permit<br />

Howard E.<br />

Gross<br />

Upon motion by Commissioner Benham, seconded by Commissioner Poe,<br />

and carried, fill permit application by Howard E. Gross to fill canal behind<br />

Spring Wood Court with clean fill material to prevent swimming pool from<br />

falling in and clean up a stagnated canal was approved upon recommendation<br />

of the Public Works Director subject to the following stipulations:<br />

l. Fill in accordance to Ordinances 71-<strong>11</strong> and 74-12;<br />

2. Post $500.00 Bond and pay permit fee of $25. 00;<br />

3. Use Type I fill material only;<br />

4. Maintain slight swale for drainage purposes;<br />

5. Protect lake from turbulence.<br />

Hiawassee<br />

Road<br />

Change<br />

Order<br />

Upon motion by Commissioner Benham, seconded by Commissioner Arthur,<br />

and carried, Change Order No. One in contract with Bumby and Stimpson,<br />

Inc., {construction of Hiawassee Road from Silver Star to Clarcona-Ocoee)<br />

providing for a net deduction of $5, 150.00 was approved, and further, the<br />

Chairman was authorized to execute same. Change consists of clearing and<br />

grubbing and removing and relocating four security lights for a total of<br />

$1350.00 applied against lump sum credit of $6,500.00 for use of material<br />

on portion of road to be vacated by <strong>Orange</strong> <strong>County</strong>.<br />

<strong>Meeting</strong> May <strong>11</strong>, <strong>1976</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!