All the ingredients shall be measured volumetrically. The concrete mix shall have 28 days<br />

cube compressive strength of the mix on 150 mm cubes. 20 N/mm 2 .<br />

Cement used for the work shall be or ordinary Portland cement confirming <strong>to</strong> IS:269/ IS :<br />

1269, which permitted by Engineer in charge. If time gap between the date of<br />

manufacture and date of the use is more that 3 months, the cement shall be retested<br />

before use & shall be rejected if it fails <strong>to</strong> confirm <strong>to</strong> any of the requirements.<br />

Fine agg. shall consist of natural sand, It shall be of siliceous materials sharp hard,<br />

strong, and durable & shall be free from adherent/nonadherent coatings clay dust alkali<br />

organic material, deleterious matter lumps etc. If any objectionable foreign matter found<br />

in the natural sand it shall be used after washing <strong>to</strong> the satisfaction of Engineer in<br />

charge.<br />

Coarse agg. Shall be machine crushed s<strong>to</strong>ne of black trap or equivalent & should be hard<br />

strong, dense, durable clean, free from skin & coating likely <strong>to</strong> prevent proper adhesion<br />

of mortar and cubical in shape, If agg. is covered with dust it shall be washed with water<br />

<strong>to</strong> make it clean.<br />

W ater used for mixing in concrete & curing shall be potable water.<br />

Concrete shall be mixed in a mechanical mixer in good conditions and mixing shall be<br />

continued till materials are uniformly distributed and a uniform color of the entire mass is<br />

obtained. In no case shall be mixing be done for less than 2 minutes after all ingredients<br />

have been put in<strong>to</strong> the mixer. In hand mixing quantity of cement shall be increased by<br />

10%. Hand mixing is allowed only in exceptional cases and with the permission of<br />

engineer in charge.<br />

The contrac<strong>to</strong>r has <strong>to</strong> make arrangement for the steel moulds <strong>to</strong> prepare precast cement<br />

concrete blocks as per the design specified by the corporation and nothing extra shall be<br />

paid for it. The dimensions of the moulds shall be fixed so as <strong>to</strong> get the blocks of the<br />

required finish, dimensions and shape specified by the corporation and satisfaction <strong>to</strong> the<br />

engineer in charge of work.<br />

The surface of the moulds shall be cleaned and oiled before pouring concrete in<strong>to</strong> moulds<br />

<strong>to</strong> get smooth finished and all the corner of shaper edge as per design.<br />

Contrac<strong>to</strong>r shall have <strong>to</strong> make arrangements for particular type of vibra<strong>to</strong>r <strong>to</strong> get better<br />

consolidation and dense concrete. Nothing extra shall be paid for the same.<br />

Contrac<strong>to</strong>r shall have <strong>to</strong> make arrangement of curing of the precast Cement Concrete<br />

blocks and <strong>to</strong>p slabs by ponding for at least <strong>14</strong> days after one day of exposure <strong>to</strong> air. At<br />

the same time the contrac<strong>to</strong>r shall have <strong>to</strong> allow blocks and slabs dried in air for at least<br />

two days.<br />

The contrac<strong>to</strong>r has <strong>to</strong> make arrangement <strong>to</strong> cart the precast cement concrete traffic<br />

central verge blocks and <strong>to</strong>p slabs at the site of work. Any block found being damaged<br />

during transportation shall not be accepted and such rejected blocks should not be<br />

allowed <strong>to</strong> use in the work.<br />

The measurement shall be paid on running meter basis.<br />

Item No.4<br />

Removing of any kind of pavement loors or C.C. kerb laid on C:M incl. Stacking of servicable<br />

materials and disposal of nservicable materials with all lead and lift (take Horizontal surface area)<br />

Removing any kind of pavement floors or C.C. kerb laid on CM including stacking of serviceable materials &<br />

disposal of unserviceable materials with all lead & lift.<br />

(Take Horizontal surface area)