810-HB-SRP<br />

2.4 Payload Fabrication and Pre-Integration Testing<br />

New mechanical and electrical hardware is fabricated in the shop facilities at WFF. Payload<br />

specific hardware is fabricated and assembled at WFF, with the exception of standard flight<br />

systems such as ignition/despin/separation systems, attitude control/boost guidance systems,<br />

recovery systems, and nose cones. Mechanical hardware is assembled and fit-checked prior<br />

to integration with scientific instrumentation provided by the customer. Electrical and<br />

telemetry instrumentation wiring and components are assembled and tested prior to<br />

integration with the customer's electrical/data systems to facilitate a smooth, trouble-free<br />

integration effort. Special pre-integration design qualification tests are often performed for<br />

new separation/ejection/deployment mechanisms, vacuum doors, and other devices. These<br />

special tests are in addition to the total payload post-integration testing that must be<br />

successfully completed before flight.<br />

Figure 2.4.1 The Very Complex Pfaff Payload Used<br />

Extended Booms to Investigate Sporadic E Events<br />

in the Ionosphere; Pfaff 21.126 Launched<br />

on 26 June 2001.<br />

Figure 2.4-2 Mentored by NSROC Staff,<br />

UVA Students begin Electrical Wiring of the<br />

Laufer 30.046 payload for the University’s<br />

“first ever” launch, 27 April 2001.<br />

2.5 Pre-Integration Review (PIR)<br />

A PIR by the project team (Mission Manager, subsystem disciplines and science) occurs prior<br />

to payload testing and integration. The purpose of this meeting is to assess the Mission<br />

Team’s readiness to support payload integration activities prior to authorizing travel by the<br />

customer or his staff. This serves to insure that the customer is not inconvenienced in having<br />