28.05.2014 Views

Minutes of Statutory Planning Committee - 19 ... - City of Port Phillip

Minutes of Statutory Planning Committee - 19 ... - City of Port Phillip

Minutes of Statutory Planning Committee - 19 ... - City of Port Phillip

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MINUTES - STATUTORY PLANNING COMMITTEE MEETING - <strong>19</strong> JUNE 2012<br />

accurately depicted on all relevant plans and elevations<br />

d) All levels to AHD<br />

all to the satisfaction <strong>of</strong> the Responsible Authority.<br />

2. No alterations<br />

The development and/or use as shown on the endorsed plans must not<br />

be altered without the written consent <strong>of</strong> the Responsible Authority.<br />

3. No change to external finishes<br />

All external materials, finishes and colours as shown on the endorsed<br />

plans must not be altered without the written consent <strong>of</strong> the Responsible<br />

Authority.<br />

4. Satisfactory continuation<br />

Once the development has started it must be continued and completed to<br />

the satisfaction <strong>of</strong> the Responsible Authority.<br />

5. ESD matters to be included<br />

The project must incorporate the sustainable design initiatives listed.<br />

Further, before the development starts, a copy <strong>of</strong> the STEPS report is to<br />

be submitted for endorsement incorporating the STORM report and all<br />

south facing glazing is to be specified as high performance (double<br />

glazed or low-e).<br />

6. Piping and ducting<br />

All piping and ducting (excluding down pipes, guttering and rainwater<br />

heads) must be concealed to the satisfaction <strong>of</strong> the Responsible<br />

Authority.<br />

7. No equipment or services<br />

Any plant, equipment or domestic services visible from a street (other<br />

than a lane) or public park must be located and visually screened to the<br />

satisfaction <strong>of</strong> the Responsible Authority.<br />

8. Time for starting and completion<br />

This permit will expire if one <strong>of</strong> the following circumstances applies:<br />

a) The development is not started within two years <strong>of</strong> the date <strong>of</strong> this<br />

permit.<br />

b) The development is not completed within two years <strong>of</strong> the date <strong>of</strong><br />

commencement <strong>of</strong> works.<br />

The Responsible Authority may extend the periods referred to if a<br />

request is made in writing before the permit expires or within three<br />

months afterwards.<br />

A vote was taken and the MOTION was CARRIED.<br />

Page 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!