29.05.2014 Views

Spring 2009 Potomac Term - Potomac School

Spring 2009 Potomac Term - Potomac School

Spring 2009 Potomac Term - Potomac School

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

News On Campus<br />

New Lower <strong>School</strong><br />

Taking Shape<br />

Glimpses through windows, through cracks in<br />

construction fences and above the roofs offer<br />

a hint of what’s to come as construction crews<br />

labor steadily to build our new Lower <strong>School</strong>.<br />

What started with a groundbreaking ceremony<br />

last spring has evolved into a sprawling construction<br />

site filled with busy workers.<br />

You can see windows and roofs on all wings,<br />

and framing of all classrooms is complete. Each<br />

classroom will feature big windows and access to<br />

the outside. The new building is slated to be ready<br />

for classes to begin in the fall. “This is a dramatic<br />

time, because we go from essentially a hole in the<br />

ground to a functional structure,” says Facilities<br />

Administrator Perry Swope. “The weather has<br />

been cooperating, which helps keep everything<br />

on track.”<br />

Workers will begin the landscaping, playgrounds<br />

and parking lots this spring. Swope is<br />

pleased to report that the large trees he worked to<br />

save next to the site are still thriving. Another 18<br />

mature trees from the Lower <strong>School</strong> playground<br />

were moved to new locations campuswide.<br />

Though there will still be some inconveniences<br />

for the community through the end of the school<br />

year, it is exciting to see the buildings and grounds<br />

take shape over the course of the spring. Swope<br />

reports that the bus square will be reconfigured<br />

this summer to relieve the current traffic bottleneck<br />

in the middle of campus.<br />

The new Lower <strong>School</strong>, under construction for most of<br />

this school year, will be completed in time for classes<br />

to begin in September.<br />

The old Lower <strong>School</strong> will be torn down after<br />

the school year ends (see article on our farewell<br />

event on the inside back cover).<br />

24 The <strong>Potomac</strong> <strong>Term</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!