12.06.2014 Views

Tracking Development - Rio Tinto - Qit Madagascar Minerals

Tracking Development - Rio Tinto - Qit Madagascar Minerals

Tracking Development - Rio Tinto - Qit Madagascar Minerals

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The Future future<br />

Progress so far<br />

Sainte Luce<br />

--<br />

A conservation zone totalling approximately 1000ha has<br />

been established, as well as a research centre.<br />

--<br />

Thirteen women from the villages bordering the<br />

conservation zone are being employed to work in the<br />

camp canteen. The women prepare breakfast, lunch and<br />

dinner for those working at the research centre and in<br />

the conservation zone.<br />

--<br />

Guards have been trained and hired from surrounding<br />

villages to protect the conservation zone and maintain<br />

the grounds.<br />

--<br />

A CSB, the only health centre for the population of<br />

3,800 residing in the three villages of Sainte Luce, was<br />

constructed in 2004 through QMM funding. Before this<br />

health clinic was established, the population travelled ten<br />

kilometres to the nearest CSB in Mahatalaky.<br />

The canteen women at work in the Sainte Luce conservation<br />

zone.<br />

Petriky<br />

--<br />

A conservation zone totalling 120ha has been established,<br />

as well as a research centre.<br />

--<br />

QMM funded the construction of a secondary school in<br />

the village of Loharano, closest to the ilmenite deposit.<br />

In 1999 a semi-permanent structure made of wood was<br />

constructed and in 2005 the present concrete structure<br />

was built.<br />

--<br />

Public consultations have been carried out since 1998.<br />

Students from Loharano’s (Petriky) secondary school.<br />

67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!