- Page 1 and 2: Detailed Project Report Kumbhariya
- Page 3 and 4: DWDU, Rajkot 3.1.2 Soil and topogra
- Page 5 and 6: DWDU, Rajkot 4.3. Physical activiti
- Page 7: DWDU, Rajkot Table 42.i .Primary Mo
- Page 11 and 12: DWDU, Rajkot 1.1 Project Background
- Page 13 and 14: DWDU, Rajkot iii Actual wages 5 Act
- Page 15 and 16: DWDU, Rajkot (3) Total Sanitation C
- Page 17 and 18: DWDU, Rajkot CHAPTER - 2 PROJECT IM
- Page 19 and 20: DWDU, Rajkot c) Develop action plan
- Page 21 and 22: DWDU, Rajkot Threats: (1) Shallow s
- Page 23 and 24: DWDU, Rajkot 3.1. Geography and Geo
- Page 25 and 26: DWDU, Rajkot SI. No. Year Rainfall
- Page 27 and 28: DWDU, Rajkot 3.2.1 Irrigation The i
- Page 29 and 30: DWDU, Rajkot rainfall. In villages
- Page 31 and 32: DWDU, Rajkot Orchards 1 - - - 45 4
- Page 33 and 34: DWDU, Rajkot Detailed Project Repor
- Page 35 and 36: DWDU, Rajkot 1 Kumbhariya NA 2 Khak
- Page 37 and 38: DWDU, Rajkot Watershed Activities W
- Page 39 and 40: DWDU, Rajkot survey team. The purpo
- Page 41 and 42: DWDU, Rajkot production of the hous
- Page 43 and 44: DWDU, Rajkot b) Planning A action p
- Page 45 and 46: DWDU, Rajkot 3. Vermicompost Yes 4.
- Page 47 and 48: DWDU, Rajkot Table no. 31.1: Waters
- Page 49 and 50: DWDU, Rajkot These are homogeneous
- Page 51 and 52: DWDU, Rajkot 4.3. Physical activiti
- Page 53 and 54: DWDU, Rajkot 2 Khakhrechi 4.66 23.0
- Page 55 and 56: DWDU, Rajkot 1. Check dams Check da
- Page 57 and 58: DWDU, Rajkot of storing water duri
- Page 59 and 60:
DWDU, Rajkot Table no.36: Activitie
- Page 61 and 62:
DWDU, Rajkot Table no. 38: Activiti
- Page 63 and 64:
DWDU, Rajkot 1 (i) Ridge area (R) (
- Page 65 and 66:
DWDU, Rajkot Particulars Unit Value
- Page 67 and 68:
DWDU, Rajkot Table No 40.ii: Techni
- Page 69 and 70:
DWDU, Rajkot Table No 40.iv: Techni
- Page 71 and 72:
DWDU, Rajkot Structure Length 50 Mt
- Page 73 and 74:
DWDU, Rajkot 5.2 L - Bank 1 16.0 2.
- Page 75 and 76:
DWDU, Rajkot Total Nursery raising
- Page 77 and 78:
DWDU, Rajkot 3 Transportation of pl
- Page 79 and 80:
DWDU, Rajkot Table No, 41.iii: Deta
- Page 81 and 82:
DWDU, Rajkot These are the major co
- Page 83 and 84:
DWDU, Rajkot around two more months
- Page 85 and 86:
DWDU, Rajkot Table no.42: Details o
- Page 87 and 88:
DWDU, Rajkot Floriculture (4 ha) Pr
- Page 89 and 90:
DWDU, Rajkot 2. Formation of Self H
- Page 91 and 92:
DWDU, Rajkot Process flow chart of
- Page 93 and 94:
DWDU, Rajkot 5 Repair, Storage etc.
- Page 95 and 96:
DWDU, Rajkot 1. Cost of one dairy b
- Page 97 and 98:
DWDU, Rajkot season and bajra and b
- Page 99 and 100:
DWDU, Rajkot Fodder expected from c
- Page 101 and 102:
DWDU, Rajkot To ensure proper techn
- Page 103 and 104:
DWDU, Rajkot Both Kumbhariya and Kh
- Page 105 and 106:
DWDU, Rajkot Farm machinery and imp
- Page 107 and 108:
DWDU, Rajkot • Raw Materials •
- Page 109 and 110:
DWDU, Rajkot -One member one vote M
- Page 111 and 112:
DWDU, Rajkot 10 Production (Kg/Ha)
- Page 113 and 114:
DWDU, Rajkot Sunflower harvesting,
- Page 115 and 116:
DWDU, Rajkot Total cost of 1 Hactar
- Page 117 and 118:
DWDU, Rajkot 5 Application of Ferti
- Page 119 and 120:
DWDU, Rajkot Table no.43: Details o
- Page 121 and 122:
DWDU, Rajkot Table no. 44: Institut
- Page 123 and 124:
DWDU, Rajkot CHAPTER - 5 BUDGETING
- Page 125 and 126:
DWDU, Rajkot Table no. 48: Village
- Page 127 and 128:
DWDU, Rajkot CHAPTER - 6 EXPECTED O
- Page 129 and 130:
DWDU, Rajkot Table no. 53: Details
- Page 131 and 132:
DWDU, Rajkot Khariff Area (ha) Aver
- Page 133 and 134:
DWDU, Rajkot and Khakhrechi Seed su
- Page 135 and 136:
DWDU, Rajkot Objective 2 Increase i
- Page 137 and 138:
DWDU, Rajkot households having more
- Page 139 and 140:
DWDU, Rajkot activities. 5.5 Awaren
- Page 141 and 142:
DWDU, Rajkot Quality and Sustainabi
- Page 143 and 144:
DWDU, Rajkot Farmers‟ organizatio
- Page 145 and 146:
DWDU, Rajkot CHAPTER - 8 MAPS Detai
- Page 147 and 148:
DWDU, Rajkot Detailed Project Repor
- Page 149 and 150:
DWDU, Rajkot Detailed Project Repor
- Page 151 and 152:
DWDU, Rajkot Detailed Project Repor
- Page 153 and 154:
DWDU, Rajkot Detailed Project Repor