GROUP A<br />

Vendor<br />

Envirowaste<br />

Horizon<br />

MadsenBarr<br />

EXCAVATED POINT REPAIRS<br />

ITEM NO. DESCRIPTION QT UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL<br />

A41 Asphalt driveway replacement 120 S.Y. $10.00 $1,200.00 $45.00 $5,400.00 $0.01 $1.20<br />

A42 Concrete driveway replacement 120 S.Y. $50.00 $6,000.00 $75.00 $9,000.00 $0.01 $1.20<br />

A43 Replace concrete slabs and/or aprons 120 S.Y. $50.00 $6,000.00 $75.00 $9,000.00 $0.01 $1.20<br />

A44 Sod replacement 3,600 S.F. $1.20 $4,320.00 $1.00 $3,600.00 $0.01 $36.00<br />

A45 Residential street without lane closure 10 DAY $0.01 $0.10 $500.00 $5,000.00 $0.01 $0.10<br />

A46 Residential street with lane closure 10 DAY $20.00 $200.00 $65.00 $650.00 $0.01 $0.10<br />

A47 FDOT or City arterial roadway 5 DAY $500.00 $2,500.00 $250.00 $1,250.00 $0.01 $0.05<br />

A48 Work in rear-yard easement (items A1 through A12) 10 EA $0.01 $0.10 $5,000.00 $50,000.00 $0.01 $0.10<br />

A49 Work in rear-yard easement (items A25 to A26 and A32 to A34) 6 EA $0.01 $0.06 $1,500.00 $9,000.00 $0.01 $0.06<br />

A50 Expedited mobilization 3 EA $500.00 $1,500.00 $5,000.00 $15,000.00 $0.01 $0.03<br />

A51 Time-and-materials items for work not covered by other pay items $0.00 $0.00 $0.00<br />

A51-1 Foreman 40 HOUR $55.00 $2,200.00 $77.00 $3,080.00 $110.00 $4,400.00<br />

A51-2 Pipe layer 80 HOUR $50.00 $4,000.00 $43.00 $3,440.00 $0.01 $0.80<br />

A51-3 Laborer 80 HOUR $50.00 $4,000.00 $31.00 $2,480.00 $55.00 $4,400.00<br />

A51-4 Backhoe - 3/4-yard combination backhoe front end loader, with operator 40 HOUR $85.00 $3,400.00 $125.00 $5,000.00 $72.00 $2,880.00<br />

A51-5 Backhoe - 3/8-yard combination backhoe, front end loader, with operator 40 HOUR $75.00 $3,000.00 $125.00 $5,000.00 $74.00 $2,960.00<br />

A51-6 Backhoe - Caterpillar Model 225 or equal, with operator 8 HOUR $85.00 $680.00 $225.00 $1,800.00 $173.00 $1,384.00<br />

A51-7 Bulldozer - Caterpillar Model D4 or equal, with operator 8 HOUR $95.00 $760.00 $140.00 $1,120.00 $0.01 $0.08<br />

A51-8 Front End Loader, Caterpillar Model 930 or equal, with operator 16 HOUR $90.00 $1,440.00 $130.00 $2,080.00 $98.00 $1,568.00<br />

A51-9 Gradeall, Caterpillar, Model 215 or equal, with operator 8 HOUR $95.00 $760.00 $225.00 $1,800.00 $0.01 $0.08<br />

A51-10 Compactor - 10-ton asphalt roller with operator 40 HOUR $80.00 $3,200.00 $130.00 $5,200.00 $0.01 $0.40<br />

A51-11 Compactor - 4-ton drum, with operator 8 HOUR $70.00 $560.00 $120.00 $960.00 $0.01 $0.08<br />

A51-12 Compactor - vibratory plate, with operator 8 HOUR $50.00 $400.00 $70.00 $560.00 $55.00 $440.00<br />

A51-13 Generator, mass lighting 8 HOUR $10.00 $80.00 $35.00 $280.00 $0.01 $0.08<br />

A51-14 100 CFM air compressor, hose, and hammer with operator 40 HOUR $30.00 $1,200.00 $75.00 $3,000.00 $0.01 $0.40<br />

A51-15 Truck - crew truck 40 HOUR $10.00 $400.00 $50.00 $2,000.00 $31.00 $1,240.00<br />

A51-16 Truck - dump, double axle, with operator 8 HOUR $60.00 $480.00 $60.00 $480.00 $0.01 $0.08<br />

A51-17 Truck - dump, single axle, with operator 8 HOUR $50.00 $400.00 $55.00 $440.00 $39.00 $312.00<br />

A51-18 Truck - flatbed, under 25,000 pounds (GVW) with operator 40 HOUR $40.00 $1,600.00 $55.00 $2,200.00 $0.01 $0.40<br />

A51-19 Truck - vacuum tank 16 HOUR $250.00 $4,000.00 $200.00 $3,200.00 $0.01 $0.16<br />

A51-20 4-inch pump with discharge hose 5 DAY $200.00 $1,000.00 $40.00 $200.00 $0.01 $0.05<br />

A51-21 6-inch pump with discharge hose 5 DAY $750.00 $3,750.00 $60.00 $300.00 $0.01 $0.05<br />

A51-22 8-inch pump with discharge hose 5 DAY $1,500.00 $7,500.00 $80.00 $400.00 $0.01 $0.05<br />

A51-23 Wellpoint equipment, 50 points, complete 3 DAY $2,000.00 $6,000.00 $900.00 $2,700.00 $985.00 $2,955.00<br />

A51-24 3/4-inch washed rock 60 CY $25.00 $1,500.00 $30.00 $1,800.00 $24.00 $1,440.00<br />

A51-25 Mason sand 60 CY $18.00 $1,080.00 $40.00 $2,400.00 $12.00 $720.00<br />

A51-26 Flowable Fill 60 CY $200.00 $12,000.00 $250.00 $15,000.00 $95.00 $5,700.00<br />

TOTAL BID FOR GROUP "A" - ITEMS A1 THROUGH A51 INCLUSIVE:<br />

$323,665.26 $771,320.00<br />

$455,905.42