GROUP B<br />
Vendor Envirowaste Horizon<br />
Intercounty<br />
Vacvision<br />
MadsenBarr<br />
MANHOLE REPAIRS<br />
ITEM NO. DESCRIPTION QT UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL<br />
B1 Realign, grout and seal manhole casting (in street) 15 EA $ 375.00 $ 5,625.00 $300.00<br />
$4,500.00<br />
$<br />
1,412.00<br />
$<br />
21,180.00<br />
$<br />
875.00<br />
$ 13,125.00 $1,225.00 $18,375.00<br />
B2 Realign, grout and seal manhole casting (in rear-yard easement) 15 EA $ 425.00 $ 6,375.00 $400.00<br />
$6,000.00<br />
$<br />
899.00<br />
$<br />
13,485.00<br />
$<br />
675.00<br />
$ 10,125.00 $615.00 $9,225.00<br />
B3 Install manhole chimney seal 10 EA $ 375.00 $ 3,750.00 $1,000.00<br />
$10,000.00<br />
$<br />
898.00<br />
$<br />
8,980.00<br />
$<br />
600.00<br />
$ 6,000.00 $425.00 $4,250.00<br />
B4 Seal visible infiltration through manhole walls, bench, and invert (brick manhole) 10 EA $ 450.00 $ 4,500.00 $375.00<br />
$3,750.00<br />
$<br />
365.00<br />
$<br />
3,650.00<br />
$<br />
1,000.00<br />
$ 10,000.00 $585.00 $5,850.00<br />
B5 Seal visible infiltration through manhole walls, bench, and invert (concrete manhole) 10 EA $ 400.00 $ 4,000.00 $325.00<br />
$3,250.00<br />
$<br />
304.00<br />
$<br />
3,040.00<br />
$<br />
750.00<br />
$ 7,500.00 $475.00 $4,750.00<br />
B6 Repair manhole bench and invert 2 EA $ 350.00 $ 700.00 $350.00<br />
$700.00<br />
$<br />
304.00<br />
$<br />
608.00<br />
$<br />
400.00<br />
$ 800.00 $375.00 $750.00<br />
B7 Replace manhole bench and invert 2 EA $ 550.00 $ 1,100.00 $450.00<br />
$900.00<br />
$<br />
425.00<br />
$<br />
850.00<br />
$<br />
1,200.00<br />
$ 2,400.00 $595.00 $1,190.00<br />
B8 Replace standard manhole frame and cover and install seal 10 EA $ 585.00 $ 5,850.00 $800.00<br />
$8,000.00<br />
$<br />
1,171.00<br />
$<br />
11,710.00<br />
$<br />
1,200.00<br />
$ 12,000.00 $1,525.00 $15,250.00<br />
B9 Replace watertight manhole frame and cover and install seal 20 EA $ 700.00 $ 14,000.00 $900.00<br />
$18,000.00<br />
$<br />
1,628.00<br />
$<br />
32,560.00<br />
$<br />
1,500.00<br />
$ 30,000.00 $1,625.00 $32,500.00<br />
B10 Install cementitious manhole liner for precast manhole 120 V.F. $ 110.00 $ 13,200.00 $190.00<br />
$22,800.00<br />
$<br />
183.00<br />
$<br />
21,960.00<br />
$<br />
180.00<br />
$ 21,600.00 $145.00 $17,400.00<br />
B11 Install cementitious manhole liner for brick manhole 120 V.F. $ 115.00 $ 13,800.00 $215.00<br />
$25,800.00<br />
$<br />
213.00<br />
$<br />
25,560.00<br />
$<br />
180.00<br />
$ 21,600.00 $165.00 $19,800.00<br />
B12 Install cementitious manhole liner with polymeric overlay for precast manhole 60 V.F. $ 250.00 $ 15,000.00 $290.00<br />
$17,400.00<br />
$<br />
274.00<br />
$<br />
16,440.00<br />
$<br />
275.00<br />
$ 16,500.00 $195.00 $11,700.00<br />
B13 Install cementitious manhole liner with polymeric overlay for brick manhole 60 V.F. $ 250.00 $ 15,000.00 $315.00<br />
$18,900.00<br />
$<br />
304.00<br />
$<br />
18,240.00<br />
$<br />
275.00<br />
$ 16,500.00 $245.00 $14,700.00<br />
B14 Install polyethylene manhole liner 60 V.F. $ 650.00 $ 39,000.00 $400.00<br />
B15<br />
Install new standard precast concrete 48-inch-diameter sewer manhole (up to 4 feet in<br />
depth)<br />
1 EA $ 5,500.00 $ 5,500.00 $3,000.00<br />
$24,000.00<br />
$3,000.00<br />
$<br />
$<br />
731.00<br />
4,460.00<br />
$<br />
$<br />
43,860.00<br />
4,460.00<br />
$<br />
$<br />
815.00<br />
4,500.00<br />
$ 48,900.00 $615.00 $36,900.00<br />
$ 4,500.00 $10,385.00 $10,385.00<br />
B16 Install new standard precast concrete 48-inch-diameter sewer manhole (4 to 6 feet in depth) 1 EA $ 6,500.00 $ 6,500.00 $5,000.00<br />
$5,000.00<br />
$<br />
5,173.00<br />
$<br />
5,173.00<br />
$<br />
5,800.00<br />
$ 5,800.00 $12,945.00 $12,945.00<br />
B17 Install new standard precast concrete 48-inch-diameter sewer manhole (6 to 8 feet in depth) 1 EA $ 8,000.00 $ 8,000.00 $9,000.00<br />
B18<br />
B19<br />
B20<br />
B21<br />
B22<br />
B23<br />
Install new standard precast concrete 48-inch-diameter sewer manhole (8 to 10 feet in<br />
depth)<br />
Install new standard precast concrete 48-inch-diameter sewer manhole (10 to 12 feet in<br />
depth)<br />
Install new standard precast concrete 48-inch-diameter sewer manhole (12 to 14 feet in<br />
depth)<br />
Install new standard precast concrete 48-inch-diameter sewer manhole (14 to 16 feet in<br />
depth)<br />
Install new drop connection precast concrete 48-inch-diameter sewer manhole (additional<br />
cost)<br />
Install new drop connection precast concrete 48-inch-diameter sewer manhole (additional<br />
cost)<br />
1 EA $ 8,900.00 $ 8,900.00 $13,000.00<br />
1 EA $ 10,000.00 $ 10,000.00 $17,000.00<br />
1 EA $ 12,000.00 $ 12,000.00 $20,000.00<br />
1 EA $ 14,000.00 $ 14,000.00 $25,000.00<br />
3 EA $ 3,000.00 $ 9,000.00 $8,000.00<br />
30 V.F. $ 260.00 $ 7,800.00 $1,500.00<br />
$9,000.00<br />
$13,000.00<br />
$17,000.00<br />
$20,000.00<br />
$25,000.00<br />
$24,000.00<br />
$45,000.00<br />
$<br />
$<br />
$<br />
$<br />
$<br />
$<br />
$<br />
6,347.00<br />
8,035.00<br />
10,783.00<br />
11,808.00<br />
14,882.00<br />
448.00<br />
232.00<br />
$<br />
$<br />
$<br />
$<br />
$<br />
$<br />
$<br />
6,347.00<br />
8,035.00<br />
10,783.00<br />
11,808.00<br />
14,882.00<br />
1,344.00<br />
6,960.00<br />
$<br />
$<br />
$<br />
$<br />
$<br />
$<br />
$<br />
7,500.00<br />
10,000.00<br />
11,500.00<br />
13,500.00<br />
18,900.00<br />
1,000.00<br />
600.00<br />
$ 7,500.00 $17,050.00 $17,050.00<br />
$ 10,000.00 $21,350.00 $21,350.00<br />
$ 11,500.00 $26,475.00 $26,475.00<br />
$ 13,500.00 $31,950.00 $31,950.00<br />
$ 18,900.00 $39,875.00 $39,875.00<br />
$ 3,000.00 $2,200.00 $6,600.00<br />
$ 18,000.00 $0.01 $0.30<br />
B24 Work in rear-yard easement (items B3 through B9) 20 EA $ 0.01 $ 0.20 $1,000.00<br />
$20,000.00<br />
$<br />
244.00<br />
$<br />
4,880.00<br />
$<br />
300.00<br />
$ 6,000.00 $0.01 $0.20<br />
B25 Work in rear-yard easement (items B10 through B14) 15 EA $ 0.01 $ 0.15 $1,000.00<br />
$15,000.00<br />
$<br />
365.00<br />
$<br />
5,475.00<br />
$<br />
750.00<br />
$ 11,250.00 $0.01 $0.15<br />
B26 Work in rear-yard easement (items B15 through B21) 5 EA $ 0.01 $ 0.05 $15,000.00<br />
$75,000.00<br />
$<br />
3,653.00<br />
$<br />
18,265.00<br />
$<br />
750.00<br />
$ 3,750.00 $0.01 $0.05<br />
B27 Bypass pumping (6-inch through 10-inch sewer) 10 DAY $500.00 $ 5,000.00 $850.00<br />
$8,500.00<br />
$<br />
1,021.00<br />
$<br />
10,210.00<br />
$<br />
300.00<br />
$ 3,000.00 $1,000.00 $10,000.00<br />
B28 Bypass pumping (12-inch and 15-inch sewer) 2 DAY $1,000.00 $ 2,000.00 $1,100.00<br />
$2,200.00<br />
$<br />
1,249.00<br />
$<br />
2,498.00<br />
$<br />
350.00<br />
$ 700.00 $2,000.00 $4,000.00<br />
B29 Bypass pumping (18-inch and 21-inch sewer) 2 DAY $4,000.00 $ 8,000.00 $1,600.00<br />
$3,200.00<br />
$<br />
1,329.00<br />
$<br />
2,658.00<br />
$<br />
500.00<br />
$ 1,000.00 $3,000.00 $6,000.00<br />
B30 Bypass pumping (24-inch sewer) 2 DAY $4,500.00 $ 9,000.00 $2,500.00<br />
$5,000.00<br />
$<br />
1,329.00<br />
$<br />
2,658.00<br />
$<br />
600.00<br />
$ 1,200.00 $4,500.00 $9,000.00<br />
B31 Asphalt roadway replacement 100 S.Y. $ 10.00 $ 1,000.00 $35.00<br />
$3,500.00<br />
$<br />
97.00<br />
$<br />
9,700.00<br />
$<br />
100.00<br />
$ 10,000.00 $60.00 $6,000.00<br />
B32 Asphalt pavement overlay (1-inch thick) 300 S.Y. $ 10.00 $ 3,000.00 $10.00<br />
$3,000.00<br />
$<br />
18.00<br />
$<br />
5,400.00<br />
$<br />
25.00<br />
$ 7,500.00 $12.00 $3,600.00<br />
B33 Concrete sidewalk replacement 10 S.Y. $ 44.00 $ 440.00 $65.00<br />
$650.00<br />
$<br />
85.00<br />
$<br />
850.00<br />
$<br />
100.00<br />
$ 1,000.00 $120.00 $1,200.00<br />
B34 Concrete curb and gutter replacement 20 L.F. $ 26.00 $ 520.00 $35.00<br />
$700.00<br />
$<br />
55.00<br />
$<br />
1,100.00<br />
$<br />
200.00<br />
$ 4,000.00 $150.00 $3,000.00<br />
B35 Asphalt driveway replacement 20 S.Y. $ 10.00 $ 200.00 $45.00<br />
$900.00<br />
$<br />
158.00<br />
$<br />
3,160.00<br />
$<br />
100.00<br />
$ 2,000.00 $55.00 $1,100.00<br />
B36 Concrete driveway replacement 20 S.Y. $ 50.00 $ 1,000.00 $75.00<br />
$1,500.00<br />
$<br />
146.00<br />
$<br />
2,920.00<br />
$<br />
100.00<br />
$ 2,000.00 $120.00 $2,400.00<br />
B37 Replace concrete slabs and/or aprons 20 S.Y. $ 50.00 $ 1,000.00 $75.00<br />
$1,500.00<br />
$<br />
213.00<br />
$<br />
4,260.00<br />
$<br />
100.00<br />
$ 2,000.00 $0.01 $0.20<br />
B38 Sod replacement 700 S.F. $ 1.20 $ 840.00<br />
$1.00<br />
$700.00<br />
$<br />
1.00<br />
$<br />
700.00<br />
$<br />
2.00<br />
$ 1,400.00 $3.00 $2,100.00