GROUP D<br />
Vendor Name<br />
BLD Services<br />
LMK<br />
Performance Pipeline<br />
LATERAL LINING AND MAINLINE SECTIONAL LINING<br />
ITEM NO. DESCRIPTION QT UNIT UNIT PRICE BID TOTAL UNIT PRICE BID TOTAL UNIT PRICE BID TOTAL<br />
D1<br />
D2<br />
D3<br />
D4<br />
D5<br />
D6<br />
Install CIP sectional pipe liners, 8-inch to 12-inch<br />
diameter (up to 6 feet in length, all depths)<br />
Install CIP sectional pipe liners, 8-inch to 12-inch<br />
diameter (per linear foot beyond 6 feet in length, all<br />
Install<br />
depths)<br />
T-liner in 8-inch to 12-inch mains with 4-inch<br />
to 6-inch laterals, all depths (includes 25 feet of<br />
lateral)<br />
Install T-liner in 15-inch to 18-inch mains with 4-<br />
inch to 6-inch laterals, all depths (includes 25 feet<br />
of lateral)<br />
Install T-liner in 24-inch mains with 4-inch to 6-inch<br />
laterals, all depths (includes 25 feet of lateral)<br />
Install T-liner in 4-inch to 6-inch laterals, all depths<br />
(per linear foot beyond 25 feet of lateral)<br />
8 EA $ 1,100.00 $ 8,800.00<br />
1,000.00 $8,000.00 $2,731.00<br />
10 L.F. $ 125.00 $ 1,250.00<br />
200.00 $2,000.00 119.00<br />
60 EA $ 2,675.00 $ 160,500.00<br />
3,500.00 $210,000.00 3,950.00<br />
2 EA $ 3,450.00 $ 6,900.00<br />
3,750.00 $7,500.00 7,100.00<br />
2 EA $ 3,850.00 $ 7,700.00<br />
5,000.00 $10,000.00 8,400.00<br />
400 L.F. $ 5.00 $ 2,000.00<br />
35.00 $14,000.00 55.00<br />
$21,848.00<br />
$1,190.00<br />
$237,000.00<br />
$14,200.00<br />
$16,800.00<br />
$22,000.00<br />
D7 Transitional liner 6-inch to 4-inch 2 EA $ 550.00 $ 1,100.00<br />
225.00 $450.00 500.00<br />
D8 Coating removal 2 EA $ 250.00 $ 500.00<br />
500.00 $1,000.00 750.00<br />
D9<br />
D10<br />
D11<br />
D12<br />
D13<br />
D14<br />
D15<br />
D16<br />
D17<br />
D18<br />
D19<br />
D20<br />
D21<br />
D22<br />
D23<br />
Lateral grouting (if required in preparation for T-<br />
liner, lateral liner, or mainline/lateral connection<br />
interface seal installation)<br />
Install CIP liner in 4-inch to 6-inch laterals, all<br />
depths (includes 25 feet of lateral)<br />
Install CIP liner in 4-inch to 6-inch laterals, all<br />
depths (per linear foot beyond 25 feet of lateral)<br />
Install CIP mainline/lateral connection interface seal<br />
in any size main with 4-inch to 6-inch laterals, all<br />
depths<br />
Sewer main cleaning and TV inspection (6-inch<br />
through 12-inch)<br />
Sewer main cleaning and TV inspection (15-inch<br />
through 21-inch)<br />
Sewer lateral cleaning and TV inspection from main<br />
(up to 30 feet)<br />
Sewer lateral cleaning and TV inspection from main<br />
(beyond 30 feet)<br />
Sewer lateral cleaning and TV inspection from<br />
cleanout (up to 30 feet)<br />
Sewer lateral cleaning and TV inspection from<br />
cleanout (beyond 30 feet)<br />
Mechanical root or grease removal (12-inch and<br />
smaller)<br />
Mechanical root or grease removal (15-inch through<br />
21-inch)<br />
Mechanical tuberculation/concrete removal (12-inch<br />
and smaller)<br />
Mechanical tuberculation/concrete removal (15-inch<br />
through 21-inch)<br />
Protruding service connection removal by internal<br />
means<br />
10 EA $ 250.00 $ 2,500.00<br />
225.00 $2,250.00 425.00<br />
15 EA $ 1,800.00 $ 27,000.00<br />
1,900.00 $28,500.00 2,800.00<br />
100 L.F. $ 5.00 $ 500.00<br />
35.00 $3,500.00 55.00<br />
6 EA $ 2,675.00 $ 16,050.00<br />
1,725.00 $10,350.00 150.00<br />
1,800 L.F. $ 1.75 $ 3,150.00<br />
1.25 $2,250.00 2.85<br />
600 L.F. $ 3.50 $ 2,100.00<br />
1.50 $900.00 3.95<br />
40 EA $ 125.00 $ 5,000.00<br />
145.00 $5,800.00 325.00<br />
400 L.F. $ 3.50 $ 1,400.00<br />
1.00 $400.00 1.85<br />
8 EA $ 100.00 $ 800.00<br />
50.00 $400.00 325.00<br />
80 L.F. $ 3.50 $ 280.00<br />
1.00 $80.00 1.85<br />
500 L.F. $ 5.00 $ 2,500.00<br />
5.00 $2,500.00 5.25<br />
250 L.F. $ 7.00 $ 1,750.00<br />
5.00 $1,250.00 7.25<br />
500 L.F. $ 10.00 $ 5,000.00<br />
5.00 $2,500.00 7.25<br />
250 L.F. $ 14.00 $ 3,500.00<br />
5.00 $1,250.00 18.00<br />
4 EA $ 350.00 $ 1,400.00<br />
100.00 $400.00 450.00<br />
D24 Bypass pumping (6-inch through 10-inch sewer) 4 DAY $ 50.00 $ 200.00<br />
150.00 $600.00 1,800.00<br />
D25 Bypass pumping (12-inch and 15-inch sewer) 1 DAY $ 450.00 $ 450.00<br />
700.00 $700.00 1,800.00<br />
$1,000.00<br />
$1,500.00<br />
$4,250.00<br />
$42,000.00<br />
$5,500.00<br />
$900.00<br />
$5,130.00<br />
$2,370.00<br />
$13,000.00<br />
$740.00<br />
$2,600.00<br />
$148.00<br />
$2,625.00<br />
$1,812.50<br />
$3,625.00<br />
$4,500.00<br />
$1,800.00<br />
$7,200.00<br />
$1,800.00