08.07.2014 Views

SloanStone EW-72000/73000 Installation Instructions - Sloan Valve ...

SloanStone EW-72000/73000 Installation Instructions - Sloan Valve ...

SloanStone EW-72000/73000 Installation Instructions - Sloan Valve ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3<br />

Mount<br />

A<br />

If desired, apply adhesive to back<br />

surfaces of Frame.<br />

B<br />

Mount Frame to wall using 3/8" fasteners with 1000 lb min<br />

pull out strength in the following locations:<br />

1. Each hole in the extreme outer corners of top support<br />

2. One of either of the two holes in the top position of each upright<br />

3. The lower hole location in each upright<br />

Fasteners may be optionally applied to any of the remaining mounting hole locations.<br />

Level Frame in both directions before tightening fasteners securely.<br />

Frame to Wall<br />

4<br />

Double Station<br />

Triple Station<br />

D<br />

(See VARIABLE<br />

MOUNTING<br />

HEIGHT CHART<br />

On Page 2)<br />

FINISHED FLOOR<br />

C<br />

For triple station sinks, reinstall the Front Panel<br />

Support.<br />

Front Panel Support<br />

4<br />

Mount<br />

Basin to Frame<br />

Note: If desired, Grid Strainers may be installed prior to mounting<br />

Basin to the Frame. Refer to Step 5.<br />

1/4”-20 x 1/2” Pan Head Screw (SEMS)<br />

(Actual Size)<br />

A Mount Basin to Frame using 1/4”-20 x 1/2” SEMS fasteners. B If desired, apply caulk between Basin and wall.<br />

Double Station<br />

Triple Station

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!