Indiana TIP Projects by MPMS Number - Southwestern ...
Indiana TIP Projects by MPMS Number - Southwestern ...
Indiana TIP Projects by MPMS Number - Southwestern ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
88374 US 219 Cambria to Clearfield<br />
Highway 219<br />
Cherry Tree Borough<br />
PENNDOT<br />
This project involves resurfacing along US 219 from the Cambria County line<br />
to the Clearfield County line in Cherry Tree Borough, <strong>Indiana</strong> County. The<br />
work will include milling of existing bituminous wearing courses, bituminous<br />
patching, paving, leveling, binder and wearing courses, and minor drainage<br />
and guide rail upgrades.<br />
Let Date<br />
10/22/2015<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction State 581 0 2,000,000 0 0 2,000,000<br />
0 2,000,000<br />
0<br />
0 2,000,000<br />
2,000,000<br />
Estimated Total Project Cost: 2,000,000<br />
88832 2013 <strong>Indiana</strong> Bridge Preserv<br />
Bridge<br />
PENNDOT<br />
Bridge preservation activities at various locations in <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design State 185 4,062<br />
0 0 0 4,062<br />
4,062 0<br />
0<br />
0<br />
4,062<br />
4/11/2013<br />
Construction Federal BOO 798,400<br />
0 0 0 798,400<br />
State 185 606,785<br />
0 0 0 606,785<br />
1,405,185 0<br />
0<br />
0 1,405,185<br />
1,409,247<br />
Estimated Total Project Cost: 1,409,247<br />
88837 2015 <strong>Indiana</strong> DFB Line<br />
Bridge<br />
PENNDOT<br />
2015 Department Force Bridge replacement reserve for <strong>Indiana</strong> County.<br />
Let Date<br />
6/15/2015<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Construction State 916 0<br />
0 284,200 0 284,200<br />
0 0 284,200<br />
0 284,200<br />
284,200<br />
Estimated Total Project Cost: 284,200<br />
Last Updated<br />
1/28/2014<br />
Page 12 of 22