<strong>Indiana</strong> County PennDOT District 10<br />

Project# PROJECT NAME<br />

MUNICIPALITY<br />

SPONSOR<br />

TYPE<br />

SR<br />

AIR QUALITY<br />

DESCRIPTION<br />

91256 US 119 Homer City North<br />

Highway 119<br />

Homer City Borough<br />

PENNDOT<br />

This safety improvement and highway restoration project involves the<br />

placement of concrete median barrier to limit crossover access along certain<br />

stretches of US 119 in Homer City Borough and Center and White<br />

Townships, <strong>Indiana</strong> County. It also includes milling, concrete pavement<br />

patching, lengthening of existing left-turn lanes, widening, bituminous<br />

overlay, and drainage improvements. The initial project area runs from the<br />

PA 56/US 119 intersection in Homer City Borough north through Center<br />

Township and ends at US 422 in White Township. The project length and<br />

scope may be further revised as preliminary design identifies the areas of<br />

need. This project is also a companion to the US 119 Homer City Group<br />

Bridges project, which involves five existing bridges within the US 119<br />

Homer City North limits of work (one replacement, two rehabilitations, one<br />

preservation, and one removal). Preliminary engineering work performed to<br />

date has been an alternatives analysis to determine how to control access<br />

on Route 119. The resulting solution is to place a continuous barrier across<br />

all unsignalized intersections. In order to mitigate the access lost to the<br />

community, a new access connector road is needed. Additional preliminary<br />

design funds will be needed to design this new access road and obtain<br />

environmental clearance for it.<br />

Let Date<br />

PROJECT FUNDING<br />

2013 2014 2015 2016<br />

TOTAL<br />

Pre-Engineering State 581 220,000<br />

0 0 0 220,000<br />

220,000 0<br />

0<br />

0 220,000<br />

Final Design Federal NHS 329,600<br />

0 0 0 329,600<br />

State 581 82,400<br />

0 0 0 82,400<br />

412,000 0<br />

0<br />

0 412,000<br />

Utilities Federal NHPP 0<br />

0 218,560 0 218,560<br />

State 581 0<br />

0 54,640 0 54,640<br />

0 0 273,200<br />

0 273,200<br />

Right of Way Federal NHPP 0<br />

14,400 0 0 14,400<br />

State 581 0<br />

360,000 0 0 360,000<br />

0 374,400<br />

0<br />

0 374,400<br />

6/18/2015<br />

Construction Federal NHPP 0<br />

0 4,423,040 1,696,240 6,119,280<br />

State 581 0<br />

0 1,529,820 0 1,529,820<br />

0 0 5,952,860 1,696,240 7,649,100<br />

8,928,700<br />

Estimated Total Project Cost: 8,928,700<br />