<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
91256 US 119 Homer City North<br />
Highway 119<br />
Homer City Borough<br />
PENNDOT<br />
This safety improvement and highway restoration project involves the<br />
placement of concrete median barrier to limit crossover access along certain<br />
stretches of US 119 in Homer City Borough and Center and White<br />
Townships, <strong>Indiana</strong> County. It also includes milling, concrete pavement<br />
patching, lengthening of existing left-turn lanes, widening, bituminous<br />
overlay, and drainage improvements. The initial project area runs from the<br />
PA 56/US 119 intersection in Homer City Borough north through Center<br />
Township and ends at US 422 in White Township. The project length and<br />
scope may be further revised as preliminary design identifies the areas of<br />
need. This project is also a companion to the US 119 Homer City Group<br />
Bridges project, which involves five existing bridges within the US 119<br />
Homer City North limits of work (one replacement, two rehabilitations, one<br />
preservation, and one removal). Preliminary engineering work performed to<br />
date has been an alternatives analysis to determine how to control access<br />
on Route 119. The resulting solution is to place a continuous barrier across<br />
all unsignalized intersections. In order to mitigate the access lost to the<br />
community, a new access connector road is needed. Additional preliminary<br />
design funds will be needed to design this new access road and obtain<br />
environmental clearance for it.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering State 581 220,000<br />
0 0 0 220,000<br />
220,000 0<br />
0<br />
0 220,000<br />
Final Design Federal NHS 329,600<br />
0 0 0 329,600<br />
State 581 82,400<br />
0 0 0 82,400<br />
412,000 0<br />
0<br />
0 412,000<br />
Utilities Federal NHPP 0<br />
0 218,560 0 218,560<br />
State 581 0<br />
0 54,640 0 54,640<br />
0 0 273,200<br />
0 273,200<br />
Right of Way Federal NHPP 0<br />
14,400 0 0 14,400<br />
State 581 0<br />
360,000 0 0 360,000<br />
0 374,400<br />
0<br />
0 374,400<br />
6/18/2015<br />
Construction Federal NHPP 0<br />
0 4,423,040 1,696,240 6,119,280<br />
State 581 0<br />
0 1,529,820 0 1,529,820<br />
0 0 5,952,860 1,696,240 7,649,100<br />
8,928,700<br />
Estimated Total Project Cost: 8,928,700<br />
Last Updated<br />
1/28/2014<br />
Page 17 of 22