Indiana TIP Projects by MPMS Number - Southwestern ...
Indiana TIP Projects by MPMS Number - Southwestern ...
Indiana TIP Projects by MPMS Number - Southwestern ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
95904 Shelocta Three Lane Safety<br />
Shelocta Borough<br />
PENNDOT<br />
Highway 422<br />
This safety improvement project involves the addition of a center two-way<br />
left-turn lane (TWLTL) along US 422 from its intersection with PA 56 east to<br />
the intersection of Township Road #361 (Shelocta Road) and Township<br />
Road #362 (Ridge Road) in Shelocta Borough and Armstrong Township<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
6/6/2013<br />
Construction Federal HSIP 1,620,000<br />
0 0 0 1,620,000<br />
1,620,000 0<br />
0<br />
0 1,620,000<br />
1,620,000<br />
Estimated Total Project Cost: 1,620,000<br />
96353 East Pike Roundabout<br />
White Township<br />
PENNDOT<br />
Highway 286<br />
This intersection improvement project involves the conversion of a<br />
signalized intersection to a roundabout at the existing at-grade intersection<br />
of PA 286 and SR 1002 (East Pike Road) in <strong>Indiana</strong> Borough and White<br />
Township, <strong>Indiana</strong> County<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering State 581 350,000<br />
0 0 0 350,000<br />
350,000 0<br />
0<br />
0 350,000<br />
350,000<br />
Estimated Total Project Cost: 350,000<br />
96961 US 422 South Sixth Street EB/WB Bridges<br />
White Township<br />
PENNDOT<br />
Bridge 422<br />
This project involves the rehabilitation of the existing structurally deficient<br />
(SD) bridges carrying US 422 eastbound and westbound over SR 954<br />
(South Sixth Street) in White Township, <strong>Indiana</strong> County. The rehabilitation<br />
scope of work will include replacement of the decks and superstructures to<br />
achieve a minimum 14’-6” vertical clearance to remove the restriction.<br />
There will also be extensive substructure repairs to improve the condition<br />
ratings.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Pre-Engineering Federal BOO 188,000<br />
0 0 0 188,000<br />
Federal NHPP 0<br />
128,000 0 0 128,000<br />
State 185 47,000<br />
32,000 0 0 79,000<br />
235,000 160,000<br />
0<br />
0 395,000<br />
Final Design Federal NHPP 0<br />
260,000 0 0 260,000<br />
State 185 0<br />
65,000 0 0 65,000<br />
0 325,000<br />
0<br />
0 325,000<br />
Right of Way Federal NHPP 0<br />
20,000 0 0 20,000<br />
State 185 0<br />
5,000 0 0 5,000<br />
0 25,000<br />
0<br />
0<br />
25,000<br />
745,000<br />
Last Updated<br />
1/28/2014<br />
Estimated Total Project Cost: 745,000<br />
Page 21 of 22