<strong>Indiana</strong> County PennDOT District 10<br />
Project# PROJECT NAME<br />
MUNICIPALITY<br />
SPONSOR<br />
TYPE<br />
SR<br />
AIR QUALITY<br />
DESCRIPTION<br />
25553 Hillsdale South 3R<br />
Line Item 286<br />
Montgomery Township<br />
PENNDOT<br />
This is a completed resurfacing, restoration, and rehabilitation project along<br />
PA 286 from approximately the intersection with SR 1024 (Hemlock Road) to<br />
approximately the intersection with Township Road #548 (Rowley Cemetery<br />
Road). The project has experienced a $9,800 accrued unbilled cost (AUC) in<br />
its right-of-way phase due to the settlement of a litigated claim.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Right of Way Federal STP 0<br />
7,840 0 0 7,840<br />
State 582 0<br />
1,960 0 0 1,960<br />
0 9,800<br />
0<br />
0<br />
9,800<br />
9,800<br />
Estimated Total Project Cost: 2,550,000<br />
25619 US 119 East Pike Northbound and Southbound Bridges<br />
White Township<br />
PENNDOT<br />
Bridge 119<br />
This project involves the rehabilitation (full superstructure replacements) of<br />
the existing structures carrying US 119 northbound and southbound over SR<br />
1002 (East Pike) in White Township, <strong>Indiana</strong> County.<br />
Let Date<br />
PROJECT FUNDING<br />
2013 2014 2015 2016<br />
TOTAL<br />
Final Design State 916 360,000<br />
0 0 0 360,000<br />
360,000 0<br />
0<br />
0 360,000<br />
1/16/2014<br />
Construction Federal NHPP 0 4,000,000 0 0 4,000,000<br />
0 4,000,000<br />
0<br />
0 4,000,000<br />
4,360,000<br />
Estimated Total Project Cost: 4,360,000<br />
Last Updated<br />
1/28/2014<br />
Page 3 of 22