SHIP INFORMATION FLOW<br />

OWNER'S INITIAL<br />

PARAMETERS<br />

SHIP DESIGN SUPPORTED BY<br />

NAPA<br />

LINKED<br />

TECHNICAL<br />

TASKS<br />

RESISTANCE,<br />

SPEED, POWER<br />

CAPACITIES<br />

COMPARTMENTS<br />

WEIGHT<br />

FEASIBILITY<br />

SPACES<br />

GEOMETRY<br />

GENERAL<br />

ARRANGEMENT<br />

INITIAL DESIGN<br />

HULL<br />

CONSTRUCTION<br />

PRINCIPLES<br />

HULL MATERIALS<br />

CONTRACT<br />

SYSTEMS<br />

INITIAL SYSTEM<br />

SCHEMES<br />

MAIN COMPONENTS<br />

LINKED ADMINISTRATIVE<br />

TASKS<br />

PLAN-<br />

NING<br />

BUILDING<br />

STRATEGY<br />

WORKLOAD<br />

SCHEDULE<br />

PROCU-<br />

REMENT<br />

INDICATIVE<br />

ENQUIRIES<br />

COST<br />

INITIAL<br />

BUDGETING<br />

OFFER<br />

CALCU-<br />

LATION<br />

BASIC DESIGN<br />

MODEL TESTS<br />

STRENGTH<br />

ANALYSES<br />

CLASSIFICATION<br />

SIMULATIONS,<br />

PROTOTYPING<br />

SPACES<br />

COMPLETE SHIP<br />

GEOMETRY<br />

COMPLETE<br />

ARRANGEMENTS<br />

HULL<br />

MAIN CONSTRUCTIONS<br />

CLASSIFICATION<br />

COORDINATION<br />

SYSTEMS<br />

COMPLETE SCHEMES<br />

MAIN ROUTINGS<br />

PLACEMENT OF MAIN<br />

COMPONENTS<br />

FINAL HIGH VALUE<br />

BUILDING MATERIAL<br />

STRATEGY ORDERS<br />

COARSE LONG<br />

PLANNING DELIVERIES<br />

TURN-KEY TURN-KEY<br />

CONTRACTS ORDERS<br />

FOLLOW-UP FOLLOW-UP<br />

TARGET<br />

BUDGETS<br />

FOLLOW-UP<br />

PRODUCTION<br />

DESIGN OF<br />

OUTF. AREAS<br />

PRODUCTION<br />

DESIGN OF<br />

HULL BLOCKS<br />

PRODUCTION<br />

DESIGN OF SHIP<br />

SYSTEMS<br />

DETAILED<br />

OUTFITTING<br />

DRAWINGS<br />

PRODUCTION OF<br />

OUTFITTING<br />

AREAS<br />

BUILDING AND<br />

OUTFITTING OF<br />

SPACES AND AREAS<br />

DETAILED HULL<br />

DRAWINGS<br />

PRODUCTION<br />

OF THE HULL<br />

BUILDING OF<br />

BLOCKS & BLOCK<br />

OUTFITTING<br />

HULL ERECTION<br />

DETAILED<br />

FABRICATION AND<br />

INSTALLATION<br />

DRAWINGS<br />

PRODUCTION OF<br />

THE SYSTEMS<br />

PREFABRICATION,<br />

UNIT ASSEMBLYING<br />

AND INSTALLATION<br />

OF SYSTEMS<br />

FINE<br />

PLANNING<br />

LOW VALUE<br />

MATERIAL<br />

ORDERS<br />

QUICK<br />

DELIVERIES<br />

FOLLOW-UP FOLLOW-UP FOLLOW-UP<br />

COMMISSIONING<br />

SPACES<br />

HULL<br />

SYSTEMS<br />

FOLLOW-UP FOLLOW-UP FOLLOW-UP<br />

FEED BACK<br />

DELIVERY<br />

FEED BACK<br />

OPERATION<br />

SHIP OPERATION SUPPORTED<br />

BY ONBOARD-NAPA<br />

,*(<br />

<br />

, # &" -./+/ 0" 1- . / ."<br />

+ (2 / ! "<br />

""#"<br />

$#3 "!<br />

<br />

<br />

)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!