08.09.2014 Views

INTEGRATED TECHNOLOGY CORPORATION

INTEGRATED TECHNOLOGY CORPORATION

INTEGRATED TECHNOLOGY CORPORATION

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

PROBE CARD METROLOGY<br />

HIGH TEMPERATURE TESTING<br />

OF PROBE CARDS<br />

Rod Schwartz<br />

VP & Technical Director<br />

Integrated Technology Corporation<br />

Dan Kosecki<br />

VP Software Development<br />

Integrated Technology Corporation<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Purpose<br />

• To show the effects of temperature<br />

on probe card parameters<br />

• To prove the usefulness of high<br />

temperature probe card metrology<br />

• To highlight some differences in<br />

probe card technology &<br />

construction<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Equipment & Samples<br />

• Probilt PB3500 Probe Card Analyzer with Hot<br />

Chuck Option<br />

• Epoxy Ring Cards<br />

– 3 Identical Cards<br />

– J971 Type<br />

– Designed for High Temperature<br />

• Form Factor Card<br />

– Logic Array<br />

• Membrane Card<br />

– Logic Array<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Hot Chuck Block Diagram<br />

HPCDA<br />

Supply<br />

Computer<br />

Interface<br />

Air Filter<br />

&<br />

Heater<br />

Hot Chuck<br />

System<br />

Controller<br />

Heated Air Control<br />

Heated Air Flow<br />

Probe Card<br />

Hot Chuck<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Hot Chuck System Controller<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Heated Measurement Chuck<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Heated Air “Top-Hat”<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Bottom of “Top-Hat”<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

“Top-Hat” & Adapter<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Hot Chuck Specifications<br />

Control<br />

Point<br />

Minimum<br />

Temp.<br />

Maximum<br />

Temp.<br />

Control<br />

Stability<br />

Heated<br />

Chuck<br />

Room<br />

125 C<br />

+/- 1.0 C<br />

Heated<br />

Air<br />

Stream<br />

Room<br />

125 C<br />

+/- 1.0 C<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Metrology Environment<br />

Heated Air Flow<br />

Pogo Pins<br />

Pogo Pins<br />

Retainer<br />

Planarity<br />

Adjustors<br />

Camera & Optics<br />

Heated Chuck<br />

Heater Strips<br />

&<br />

Thermal Barrier<br />

X,Y,Z Stage<br />

Subchuck<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Probe Card Construction<br />

PCB<br />

PCB Aperture<br />

Ring Aperture<br />

Ring<br />

Epoxy<br />

Probe<br />

Probe Tip Depth<br />

PC<br />

Botto<br />

Surfa<br />

Probe Details<br />

Ring<br />

Highest<br />

Probe<br />

Lowest<br />

Probe<br />

Probe Wire<br />

Diameter<br />

Epoxy<br />

Planarity<br />

Tip<br />

Length<br />

Epoxy<br />

Clearance<br />

Tip Diameter<br />

Tip Shape<br />

Flat<br />

E-tip (Radiused)<br />

Figure 3: PCB and Epoxy Ring Assembly<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Probe Ring<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Large Ceramic Probe Ring<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Large Array on Probe Card<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Cross Section View<br />

CHUCK<br />

TEMP.<br />

25 C<br />

25 C<br />

60 C<br />

120 C<br />

80 C<br />

10 mils<br />

1000 mils<br />

1004 mils<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Pitch Change with Temp<br />

CHUCK<br />

TEMP<br />

25 C<br />

120 C<br />

70 u<br />

80 u<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Alignment Shifts (3 Cards)<br />

• Averages of 6 groups of 5 probes<br />

• 3 groups each side, evenly spaced<br />

• Boxes represent +/- 5 microns movement<br />

• Lines represent direction and magnitude<br />

of movement (25 °C C to 125 °C)<br />

• The “+” is 25 °C C location<br />

• #11-Red, #12-Blue, #14-Green<br />

• Repeatability of multiple runs affected by<br />

stabilization time<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Epoxy Ring Probe Card<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Epoxy Card Array<br />

X,Y Pad Coordinates<br />

6000<br />

4000<br />

2000<br />

Y (microns)<br />

0<br />

-6000 -4000 -2000 0 2000 4000 6000<br />

-2000<br />

-4000<br />

-6000<br />

X (microns)<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Alignment Shift (Epoxy Card)<br />

*Box = +/- 10u<br />

*The + in center of box is 25<br />

°C location<br />

*Each line is 5 probe average<br />

*Card 11 – Red<br />

*Card 12 – Blue<br />

*Card 13 – Green<br />

*Length of line represents<br />

the shift in position from<br />

25 °C to 125 °C.<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Other Shifts (Epoxy Card)<br />

Parameter<br />

Card 11<br />

Card 12<br />

Card 14<br />

Z Shift<br />

-221 u<br />

-147 u<br />

-148 u<br />

Planar<br />

55u (25)<br />

58u (25)<br />

30u (25)<br />

Window<br />

50u (125)<br />

54u (125)<br />

33u (125)<br />

Leakage<br />

6-10<br />

uA<br />

6-9 uA<br />

6-10<br />

uA<br />

Increase<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Memory Card<br />

Probes at 25, 36, 70 & 90 °C<br />

Probes Movement with Temperature<br />

15<br />

Yoffset (microns)<br />

10<br />

5<br />

0<br />

-10<br />

-5<br />

0 10 20 30<br />

Series1<br />

Series2<br />

Series3<br />

-10<br />

Xoffset (microns)<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Form Factor Micro Spring<br />

MLC Connections<br />

Space Transformer<br />

Micro-Spring<br />

Contact Paddle<br />

Truncated Pyramid<br />

Probe Tip<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Form Factor Probe Card<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Form Factor Array<br />

X,Y Pad Coordinates<br />

6000<br />

4000<br />

2000<br />

Y (microns)<br />

0<br />

-8000 -6000 -4000 -2000 0 2000 4000 6000 8000<br />

-2000<br />

-4000<br />

-6000<br />

X (microns)<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Alignment Shifts (FFI)<br />

*Box = +/- 10u<br />

*The + in center of box is 25<br />

°C location<br />

*Each line is a single probe<br />

*Length of line represents<br />

the shift in position from 25<br />

°C to 125 °C.<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Other Shifts (FFI)<br />

Parameter<br />

FFI Card Value<br />

Z Shift<br />

-160 microns<br />

Planar Window<br />

Leakage Increase<br />

36 microns (25°C)<br />

48 microns (125 °C)<br />

0.4 to 0.6 uA<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Form Factor Results<br />

• Fairly predictable results<br />

• Larger shift than epoxy ring<br />

• Not as consistent as expected<br />

• Data on only one card should not be<br />

taken as representative of type<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Membrane Probe Head<br />

Window (opt)<br />

Springs<br />

Probe<br />

Frame<br />

PCB<br />

Membrane<br />

Plunger<br />

Bumps<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Membrane Array<br />

X,Y Pad Coordinates<br />

15000<br />

10000<br />

5000<br />

Y (microns)<br />

0<br />

-15000 -10000 -5000 0 5000 10000 15000<br />

-5000<br />

-10000<br />

-15000<br />

X (microns)<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Alignment Shifts (Membrane)<br />

*Box = +/- 10u<br />

*The + in center of box is 25<br />

°C location<br />

*Each line is a single probe<br />

*Length of line represents the<br />

shift in position from 25 °C to<br />

100 °C.<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Other Shifts (Membrane)<br />

Parameter<br />

FFI Card Value<br />

Z Shift<br />

-145 microns<br />

Planar Window<br />

Leakage Increase<br />

72 microns (25°C)<br />

71 microns (100 °C)<br />

Not Run<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Membrane Results<br />

• Mylar expands and probes move a<br />

lot<br />

• Very well behaved – predictable<br />

results<br />

• More temperature sensitive than<br />

other technologies<br />

• Requires card to be designed for<br />

temperature of use<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Cobra Probe Card<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Cobra Head Cross Section<br />

Metalization<br />

Space<br />

Transformer<br />

Upper<br />

Die<br />

Mylar<br />

Lower<br />

Die<br />

"Cobra"<br />

Probe Needle<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Cobra Considerations<br />

• Lower die is close to wafer<br />

– Heats up considerably<br />

– Test time vs. Index Time changes<br />

heating<br />

• Mylar insulator may move<br />

• Probe stresses<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Conclusions<br />

• Probe movement for most technologies<br />

with temperature is NOT predictable, but<br />

it IS repeatable<br />

• Epoxy card construction techniques can<br />

make a significant difference in<br />

temperature performance<br />

• FFI cards are more predictable than<br />

epoxy, but there are still variations<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Conclusions (2)<br />

• Membrane card is the most<br />

predictable<br />

• Membrane card has largest shifts<br />

with temperature<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Future Studies<br />

• Other Probe Card Technologies<br />

• Scrub Mark vs. Analyzer Data<br />

• Probe Material Variations<br />

• Card Construction Techniques<br />

• Path of Probe Movement vs. Temperature<br />

Change<br />

• Stabilization Times vs. Repeatability<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>


Providing Leading Edge Technology to Meet Your Future Requirements Today<br />

Acknowledgements<br />

• Bill Williams – Motorola<br />

– Thanks for supplying cards for this<br />

study.<br />

• Russ Allred - ITC<br />

– Data Collection<br />

• Hoa Do Thai - ITC<br />

– Data Collection<br />

4/9/2002 Copyright April 2002 - ITC<br />

www.inttechcorp.com<br />

<strong>INTEGRATED</strong> <strong>TECHNOLOGY</strong> <strong>CORPORATION</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!