15.09.2014 Views

Nickel in demand

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Header folio<br />

Punta Cana International Airport<br />

current Control Tower<br />

“To date we have already had two airl<strong>in</strong>es request<strong>in</strong>g<br />

permission to fly A-380’s <strong>in</strong>to Punta Cana <strong>in</strong> the near<br />

future and we look forward to welcom<strong>in</strong>g them<br />

to our airport <strong>in</strong> due course”<br />

be<strong>in</strong>g sent between South America and<br />

Europe,” Ra<strong>in</strong>ieri highlights. “More and<br />

more bus<strong>in</strong>esses are see<strong>in</strong>g Punta Cana<br />

as the perfect middle ground between<br />

the two cont<strong>in</strong>ents and are us<strong>in</strong>g us as a<br />

transfer po<strong>in</strong>t. The expansion of our cargo<br />

capabilities, through the build<strong>in</strong>g of a 5,000<br />

square metre facility, is designed to meet<br />

what we expect to be further <strong>demand</strong> for<br />

this type of service. This facility will be<br />

operational as of 1 October, 2014.”<br />

This virtually unrivalled degree of<br />

flexibility when it comes to be<strong>in</strong>g able<br />

to <strong>in</strong>vest <strong>in</strong> and renovate the airport is<br />

undoubtedly one of the greatest strengths of<br />

Punta Cana International, if not the greatest.<br />

BE Monthly [ Issue 83 ]<br />

115

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!