26.09.2014 Views

Design limits and solutions for very large wind turbines

Design limits and solutions for very large wind turbines

Design limits and solutions for very large wind turbines

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contents<br />

1. UpWind: Summary - a 20 MW turbine is feasible ................................................................ 10<br />

The need <strong>for</strong> the UpWind project: exploring the design <strong>limits</strong> of upscaling ........................................... 11<br />

UpWind methodology: a lighthouse approach .................................................................................... 13<br />

UpWind: 20 MW innovative turbine ................................................................................................... 14<br />

UpWind: rooted in history ................................................................................................................ 16<br />

UpWind: continuous innovation ........................................................................................................ 18<br />

2. UpWind: Scientific integration ................................................................................................. 20<br />

2.1 Work Package 1A1: St<strong>and</strong>ards <strong>and</strong> integration .................................................................................. 22<br />

Challenges <strong>and</strong> main innovations ........................................................................................................ 22<br />

Results ............................................................................................................................................. 23<br />

Subtask A: Reference <strong>wind</strong> turbine <strong>and</strong> cost model ........................................................................... 23<br />

Subtask B: Integral design approach methodology ............................................................................. 23<br />

Subtask C: Development of (pre)st<strong>and</strong>ards <strong>for</strong> the application of the integral design approach ............. 25<br />

Subtask D: Integration, review <strong>and</strong> planning workshops ..................................................................... 26<br />

References ........................................................................................................................................ 26<br />

2.2. Work Package 1A2: Metrology ......................................................................................................... 27<br />

Challenges <strong>and</strong> main innovations ........................................................................................................ 27<br />

Results ............................................................................................................................................. 28<br />

The metrology database .................................................................................................................. 28<br />

Advances in metrology .................................................................................................................... 28<br />

Verifi cation of anemometer calibrations ............................................................................................ 29<br />

References ........................................................................................................................................ 31<br />

2.3. Work Package 1A3: Training <strong>and</strong> education ...................................................................................... 32<br />

Challenges <strong>and</strong> main innovations ........................................................................................................ 32<br />

Results <strong>and</strong> conclusions ..................................................................................................................... 33<br />

<strong>Design</strong> <strong>limits</strong> <strong>and</strong> <strong>solutions</strong> <strong>for</strong> <strong>very</strong> <strong>large</strong> <strong>wind</strong> <strong>turbines</strong><br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!