Facilities Master Plan - Barstow Community College

Facilities Master Plan - Barstow Community College

Facilities Master Plan - Barstow Community College

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Barstow</strong> <strong>Community</strong> <strong>College</strong> <strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong><br />

// <strong>Master</strong> <strong>Plan</strong> Reccomendations<br />

»»<br />

Deferred Maintenance<br />

»»<br />

Sustainability<br />

»»<br />

Energy Conservation<br />

»»<br />

Alternative Sources of Energy<br />

<strong>Plan</strong>ning / Design / Construction Process<br />

From inception, and depending on the funding source(s), it can be reasonably<br />

expected to take 5 to 7 years to bring a new building on-line and ready for<br />

occupancy. Once the “need” has been identified, the process proceeds as follows:<br />

•§<br />

Project scope development.<br />

•§<br />

Submittal of Initial Project Proposal (IPP) to State Chancellor’s Office.<br />

•§<br />

Upon acceptance, the project design process begins, including Project<br />

Program, Concept Design, Concept Scheduling and Cost Estimating.<br />

•§<br />

Submittal of Final Project Proposal (FPP) to State Chancellor’s Office.<br />

•§<br />

Upon approval, Construction Contract Documents are completed.<br />

•§<br />

Completed Construction Contract Documents are submitted to the Division<br />

of the State Architect (DSA) for document review and approval.<br />

•§<br />

Bids are solicited for project construction.<br />

•§<br />

At completion of construction, project is closed out and turned over for occupancy.<br />

Prioritized <strong>Master</strong> <strong>Plan</strong> Recommendations<br />

The following represents a prioritized list of facility-related projects that both<br />

respond to space needs as well as addressing issues of code compliance and<br />

routine maintenance:<br />

Deferred Maintenance<br />

The following repairs have been identified for as part of the 5 year plan:<br />

•§<br />

Mechanical Repairs<br />

•§<br />

Building Exteriors Repairs<br />

•§<br />

Roof Repairs<br />

•§<br />

Utility Repairs<br />

These projects will be scheduled for implementation over a 4 year period.<br />

Relocatable Modular Buildings<br />

Phase 1 (Provide swing space for Initial Buildings Modernization Project)<br />

This phase will provide a total of 7,680 GSF of space. This is sufficient space to<br />

accommodate temporary relocation of the space displaced by the remediation<br />

of the Administration Building, as well as a major portion of the remediation of<br />

Building No. 03, Building No. 08 and Building No. 11. Phase 1 should be erected<br />

prior to the commencement of the Initial Buildings Modernization project.<br />

Phase 2 (Provide new classroom and laboratory space anticipated in the 2020<br />

Educational <strong>Master</strong> <strong>Plan</strong>)<br />

This phase will require the reconfiguration of the portion of the swing space<br />

used to house the temporary relocation of the Administration Building, as well<br />

as provide an additional 3,840 GSF of Classroom and Laboratory Space.<br />

Phase 2 should be erected in 2018.<br />

At the completion of Phase 2, there will be a total of 11,520 GSF of space<br />

available for Classroom, Laboratory and office space.<br />