26.09.2014 Views

Facilities Master Plan - Barstow Community College

Facilities Master Plan - Barstow Community College

Facilities Master Plan - Barstow Community College

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Barstow</strong> <strong>Community</strong> <strong>College</strong> <strong>Facilities</strong> <strong>Master</strong> <strong>Plan</strong><br />

// Attendant Topics<br />

Attendant Issues<br />

Total Cost of Ownership<br />

The 2011 Educational <strong>Master</strong> <strong>Plan</strong> provides a template for the development of<br />

an institutionally agreed upon, systematic procedure by which each existing<br />

facility in the District is evaluated. This template will establish a quantitative<br />

database that will assist the District and the <strong>College</strong> in determining the viability<br />

of existing facilities as well as the feasibility of remodeling existing facilities and/<br />

or constructing new facilities.<br />

Staffing Requirements<br />

Staffing requirements with respect to institutional support services, custodial<br />

service, maintenance and technological services can be characterized as follows:<br />

•§<br />

Short Term (0-3 years):<br />

The first phase of the addition of the Relocatable Modular Structures<br />

(7,680 GSF) is intended to provide substitute space for those areas being<br />

renovated. Therefore there should be no additional staffing requirements<br />

•§<br />

Mid-Term (4- 10 years):<br />

»»<br />

The addition of a new building to house the relocation<br />

of Career Technology Education from the State Street<br />

location should be a reassignment of duties and<br />

responsibilities and require no additional staffing.<br />

»»<br />

The second phase of the addition of Relocatable Modular<br />

Structures (3,840 GSF) will bring the total area for the Modular<br />

Relocatable Structures to 11,520 GSF. This space will be<br />

considered new space and provide additional Classrooms<br />

and Laboratories. These new spaces can be reasonably<br />

expected to require the addition of one (1) custodial staff.<br />

•§<br />

Long Term (10 – 12 years):<br />

A new Classroom Building (± 15,000 ASF) will replace the Modular<br />

Reloatable Structures and provide additional Classroom and Laboratory space.<br />

There should be no additional staffing requirements for this new structure.<br />

Funding Sources<br />

Aside from funds that may be available through the traditional State <strong>Community</strong><br />

<strong>College</strong> System, the following opportunities should be considered to fund<br />

future improvements:<br />

•§<br />

Local Bonds<br />

•§<br />

Federal Grants<br />

•§<br />

Private Grants<br />

•§<br />

Public / Private Partnerships<br />

// 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!