OPERATIONAL PROCEDURE - <strong>Elster</strong> <strong>LCR</strong>-<strong>212</strong> <strong>Single</strong> <strong>Phase</strong><br />

<strong>Load</strong> <strong>Control</strong> Ripple Receiver Installation and<br />

Use<br />

CEOP8086<br />

• OFF Switching Command + Work Schedule Disabling<br />

This command serves to switch all addressed objects to the OFF position and to disable the<br />

associated schedules.<br />

• Receiver Deactivation (OUT of Service)<br />

Receivers can be deactivated with this command, i.e. they no longer react to arriving<br />

remote switching and remote programming commands. Equally, all running work schedules<br />

are disabled and all relays are deactivated.<br />

• Receiver Activation (IN Service)<br />

Deactivated receivers can be activated again with this command.<br />

• Test Command<br />

This command is purely for test purposes.<br />

5.2.2 Timer Function with VERSACOM<br />

Up to 32 work schedules containing several ON and OFF switching times can be defined for<br />

each receiver within the range from 00:00:01 – 24.00.00. The work schedules are<br />

optionally assigned to relays 1 – 4. It is also possible to activate work schedules in the<br />

receiver depending on specific days of the week or public holidays.<br />

5.2.3 Special Features<br />

• Correction to the nominal state after a time synchronisation command.<br />

After a time synchronisation command has been received, the current nominal status<br />

of the relays belonging to all currently active work schedules is corrected in the<br />

receiver.<br />

• Correction to the nominal state after a work schedule selection.<br />

After a work schedule selection command has been received, enabling or disabling of<br />

specific temperature-dependent work schedules, all currently active work schedules<br />

are corrected to the current nominal status.<br />

• Emergency running function.<br />

If all work schedules in the receiver are disabled during load control, it is possible to<br />

assign a work schedule to each relay which is then enabled under the following two<br />

conditions: enabling only if all work schedules are disabled and a transmitter failure<br />

(SAS) is also detected.<br />

• Dynamic work schedule processing.<br />

It is possible to specify the number of work schedules and the number of switching<br />

time pairs when defining parameters.<br />

6 RIPPLE CONTROL SYSTEMS<br />

The <strong>LCR</strong><strong>212</strong> receiver is capable of processing the following ripple control protocols:<br />

• conventional protocols<br />

Identifier<br />

System<br />

0 Zellweger 180 second<br />

1 L & G S 50<br />

2 RWE<br />

3 L & G B telegram<br />

4 Zellweger 60 seconds<br />

5 Pulsadis (CDC or EDF)<br />

6 Ricontic S<br />

7 Ricontic B<br />

22 March 2011 - Issue 3<br />

Approved By: General Manager Technical Services<br />

Page 12 of 17<br />