Elster LCR-212 Single Phase Load Control ... - Essential Energy
Elster LCR-212 Single Phase Load Control ... - Essential Energy
Elster LCR-212 Single Phase Load Control ... - Essential Energy
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
UNCLASSIFIED<br />
OPERATIONAL PROCEDURE - <strong>Elster</strong> <strong>LCR</strong>-<strong>212</strong> <strong>Single</strong> <strong>Phase</strong><br />
<strong>Load</strong> <strong>Control</strong> Ripple Receiver Installation and<br />
Use<br />
CEOP8086<br />
9.1 Attachment A - Technical Data of the <strong>LCR</strong>-<strong>212</strong><br />
Connection data: mains voltage: 230/240V + 11% / -22% or<br />
110V + 11% / -22%<br />
mains frequency: 50Hz - 2% / + 1%<br />
power consumption:<br />
< 1.0W / 10 VA cap<br />
surge voltage resistance:<br />
10kV 1.2/50 in accordance with<br />
IEC 255-4<br />
Filter data: control frequency range: 158Hz – 1350Hz<br />
control frequency selection: Freely selectable by pre-built files<br />
operation voltage:<br />
Uf >= 0.5% Un<br />
non-operating voltage: Unf