27.09.2014 Views

Elster LCR-212 Single Phase Load Control ... - Essential Energy

Elster LCR-212 Single Phase Load Control ... - Essential Energy

Elster LCR-212 Single Phase Load Control ... - Essential Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIED<br />

OPERATIONAL PROCEDURE - <strong>Elster</strong> <strong>LCR</strong>-<strong>212</strong> <strong>Single</strong> <strong>Phase</strong><br />

<strong>Load</strong> <strong>Control</strong> Ripple Receiver Installation and<br />

Use<br />

CEOP8086<br />

9.1 Attachment A - Technical Data of the <strong>LCR</strong>-<strong>212</strong><br />

Connection data: mains voltage: 230/240V + 11% / -22% or<br />

110V + 11% / -22%<br />

mains frequency: 50Hz - 2% / + 1%<br />

power consumption:<br />

< 1.0W / 10 VA cap<br />

surge voltage resistance:<br />

10kV 1.2/50 in accordance with<br />

IEC 255-4<br />

Filter data: control frequency range: 158Hz – 1350Hz<br />

control frequency selection: Freely selectable by pre-built files<br />

operation voltage:<br />

Uf >= 0.5% Un<br />

non-operating voltage: Unf

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!