Elster LCR-212 Single Phase Load Control ... - Essential Energy
Elster LCR-212 Single Phase Load Control ... - Essential Energy
Elster LCR-212 Single Phase Load Control ... - Essential Energy
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
UNCLASSIFIED<br />
OPERATIONAL PROCEDURE - <strong>Elster</strong> <strong>LCR</strong>-<strong>212</strong> <strong>Single</strong> <strong>Phase</strong><br />
<strong>Load</strong> <strong>Control</strong> Ripple Receiver Installation and<br />
Use<br />
CEOP8086<br />
10 KEY TERMS AND DEFINITIONS<br />
<strong>LCR</strong>-<strong>212</strong>:<br />
<strong>Elster</strong> <strong>Single</strong> <strong>Phase</strong> <strong>Load</strong> <strong>Control</strong> Ripple Receiver.<br />
<strong>LCR</strong>-<strong>212</strong>RTC:<br />
<strong>Elster</strong> <strong>Single</strong> <strong>Phase</strong> <strong>Load</strong> <strong>Control</strong> Ripple Receiver with Real Time Clock.<br />
11 REVISIONS<br />
Issue Number Section Details of Changes in this Revision<br />
2<br />
3.2 Receiver<br />
Connections and<br />
Installation Instructions<br />
Explanation of receiver use and installation for<br />
consumers with multiphase loads and<br />
multiphase supply’s.<br />
3 All sections Rebranding template<br />
22 March 2011 - Issue 3<br />
Approved By: General Manager Technical Services<br />
Page 17 of 17<br />
UNCLASSIFIED<br />
UNCONTROLLED COPY IF PRINTED