New England Electric Railway Historical Society<br />

Carhouse Repairs<br />

Tom Santarelli<br />

With <strong>the</strong> museum having marked its<br />

72 nd anniversary in <strong>2011</strong>, much of <strong>the</strong><br />

museum’s infrastructure has been in<br />

service for decades. Many of <strong>Seashore</strong>’s<br />

carhouses have been housing streetcars,<br />

interurban cars, rapid transit cars, and<br />

buses far longer than <strong>the</strong> buildings on<br />

<strong>the</strong>ir original systems. Not surprisingly,<br />

maintenance needs have been growing.<br />

In recent years we have made significant<br />

improvements to Shop 1, <strong>the</strong> Burton B.<br />

Shaw South Boston Barn, Highwood<br />

Barn, Riverside Barn, and <strong>the</strong> Town<br />

House Shop. This year we finished a<br />

program of foundation work we began<br />

last year at Fairview Barn. Some of <strong>the</strong><br />

footings supporting <strong>the</strong> steel columns<br />

and poured by our volunteers decades<br />

ago had cracked and shifted. Unstable<br />

soil conditions led to <strong>the</strong> east side of <strong>the</strong><br />

building and track four shifting outwards,<br />

<strong>the</strong>reby damaging several of <strong>the</strong> columns.<br />

Our partnership with engineers from<br />

Portland engineering firm SMRT resulted<br />

in a much more stable foundation design,<br />

including <strong>the</strong> provision for adding a frost<br />

wall on <strong>the</strong> east side to hold <strong>the</strong> columns<br />

firmly in place and stabilize <strong>the</strong> adjacent<br />

track bed<br />

Back in 2010 our selected contractor was<br />

able to pour four of <strong>the</strong> new footings and<br />

piers on <strong>the</strong> west side of <strong>the</strong> building<br />

just before <strong>the</strong> full onset of winter. In <strong>the</strong><br />

spring after <strong>the</strong> concrete had fully cured,<br />

final height adjustments and finish grouting<br />

were carried out allowing <strong>the</strong> temporary<br />

cribbing to be removed. A volunteer<br />

crew <strong>the</strong>n began repairs to <strong>the</strong> adjacent<br />

track by replacing approximately ten<br />

cross ties, extending one of <strong>the</strong> rails, and<br />

adding stone ballast for leveling and support.<br />

The work extended outward upgrading<br />

<strong>the</strong> appearance and access to this<br />

area and to better control water runoff<br />

and drainage.<br />

Above: Soil conditions around Fairview were a challenge to <strong>the</strong> contractor doing repair work. Considerable<br />

grading was required for equipment to reach <strong>the</strong> deteriorated footings. Here temporary blocking<br />

piles and beams support columns while new footings are excavated <strong>the</strong>n have concrete poured. TS<br />

Since o<strong>the</strong>r carhouses were built with<br />

similar foundations to Fairview, this work<br />

will provide us with valuable design and<br />

financial information for those structures<br />

if and when such work is required.<br />

Fairview is a pilot project deliberately<br />

intended to be a future tool.<br />

Meanwhile, capping last year’s Highwood<br />

improvements, a new asphalt apron was<br />

paved across <strong>the</strong> front of <strong>the</strong> building<br />

by a local contractor. New bollards were<br />

installed to provide solid fixtures for securing<br />

<strong>the</strong> doors when open, <strong>the</strong> outside<br />

track was brought to level and ballast<br />

rock added to smooth out and improve<br />

<strong>the</strong> appearance of <strong>the</strong> passenger loading<br />

area of <strong>the</strong> yard. A section of steel framing<br />

was installed by our volunteers to accept<br />

new rear exit and access doors. Next<br />

to and at <strong>the</strong> back of <strong>the</strong> building, new<br />

culverts improve drainage and widen <strong>the</strong><br />

usable roadway at <strong>the</strong> throat of <strong>the</strong> future<br />

trolley bus loop.<br />

At <strong>the</strong> Visitors Center several improvements<br />

were made to <strong>the</strong> rear of <strong>the</strong> building<br />

to improve access for deliveries and<br />

visitor pathways. This included relocating<br />

a storage unit, installing granite curbing,<br />

<strong>the</strong>n paving a new walkway, and landscaping.<br />

Below: New footings have been poured and <strong>the</strong> first sections of a frost wall between <strong>the</strong> footings at<br />

each column have been constructed. Future plans call for frost wall around <strong>the</strong> entire perimeter. TS<br />

To access <strong>the</strong> work areas on <strong>the</strong> adjacent<br />

East side meant overcoming very soft<br />

ground conditions along <strong>the</strong> drainage<br />

ditch next to <strong>the</strong> building. Fill had to be<br />

brought in to allow access to construction<br />

areas. Ano<strong>the</strong>r four footings were replaced<br />

over <strong>the</strong> summer and two sections<br />

of frost wall were installed. Upon completion,<br />

our track crew moved track four<br />

back into position. The Fairview building<br />

is now stable and future foundation work<br />

will be undertaken as needed. Developments<br />

will be monitored closely.<br />