01.10.2014 Views

Leica - Runner 20

Leica - Runner 20

Leica - Runner 20

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Line levelling<br />

A<br />

R V<br />

R<br />

R V<br />

d 1<br />

d 2<br />

V<br />

I 1<br />

I I<br />

2<br />

3<br />

2<br />

B<br />

3<br />

∆H<br />

Wanted:<br />

Height difference (∆H) between<br />

point A and B.<br />

Select instrument station<br />

and staff location by<br />

pacing off in that way, that<br />

approximately the same target<br />

distances are resulting (d1 ≈ d2;<br />

approx. 40 to 50m).<br />

Procedure:<br />

1. Setup instrument at I 1<br />

.<br />

BL-28<br />

2. Setup level staff vertically at<br />

point A.<br />

3. Aim on staff and read off and<br />

take down height (backsight<br />

R).<br />

4. Setup level at the<br />

changepoint 2, aim on staff<br />

and read off and take down<br />

height (foresight V).<br />

5. Setup level at I 2<br />

, airm on staff<br />

at the hangepoint 2 and read<br />

backsight and take down.<br />

6. Carry out a foresight at<br />

changepoint 3.<br />

7. Continue in the same way<br />

until height at point B is<br />

measured.<br />

Result:<br />

∆H = sum backsight - sum<br />

foresight<br />

Example for the booking:<br />

Point<br />

No.<br />

Backsight<br />

R<br />

Foresight<br />

V Height<br />

A +2.502 650.100<br />

2 +0.911 -1.803<br />

3 +3.103 -1.930<br />

B -0.981 651.902<br />

Sum +6.516 -4.714<br />

∆H=<br />

+1.802<br />

RUNNER <strong>20</strong>/24-1.0.1en<br />

16 Measuring

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!