Approval (REA)<br />

The REA <strong>in</strong>tegrates<br />

prov<strong>in</strong>cial review of the<br />

environmental issues<br />

and concerns that were<br />

previously addressed<br />

through the local land<br />

use plann<strong>in</strong>g process<br />

(e.g., zon<strong>in</strong>g or site<br />

plann<strong>in</strong>g), the environmental<br />

assessment<br />

process and the<br />

environmental approvals<br />

process (e.g.,<br />

Certificates of<br />

Approval, Permits to<br />

Take Water).<br />

Proceed request<br />

try of<br />

the<br />

Environment<br />

TBD<br />

v1.3.2_<br />

Article 2.4<br />

(b)<br />

requir<strong>in</strong>g a great<br />

deal of front-end<br />

preparation. A<br />

tremendous<br />

amount of work and<br />

consultation must<br />

take place before a<br />

FIT application can<br />

be completed. For<br />

more <strong>in</strong>formation<br />

on this process,<br />

please refer to the<br />

report (page 25):<br />

"Work<strong>in</strong>g with the<br />

M<strong>in</strong>istry of Environment"<br />

4<br />

Milestones<br />

Domestic<br />

Content<br />

Plan<br />

The FIT contract<br />

requires w<strong>in</strong>d <strong>project</strong>s<br />

greater than 10 kW and<br />

all solar <strong>project</strong>s to<br />

<strong>in</strong>clude a m<strong>in</strong>imum<br />

amount of goods and<br />

services that come from<br />

Ontario. The Domestic<br />

Content Plan outl<strong>in</strong>es<br />

how to meet the<br />

domestic content<br />

requirements.<br />

Before Notice<br />

to Proceed<br />

request<br />

OPA<br />

All costs <strong>in</strong>curred<br />

are the supplier's<br />

responsibility<br />

FIT contract<br />

v1.3.1_ Article<br />

2.4 (b)<br />

OPA's proposal to<br />

Proposal to Amend<br />

FIT Contract, Exhibit<br />

D, Domestic<br />

Content.<br />

http://fit.powerauth<br />

ority.on.ca/Page.as<br />

p?PageID=122&Cont<br />

entID=10598&SiteN<br />

odeID=1054&BL_Ex<br />

pandID=262<br />

5<br />

Milestones<br />

F<strong>in</strong>ancial<br />

Plan<br />

List all sources of<br />

equity or debt f<strong>in</strong>anc<strong>in</strong>g<br />

for the <strong>development</strong> of<br />

your <strong>project</strong>.<br />

Before Notice<br />

to Proceed<br />

request<br />

OPA<br />

All costs <strong>in</strong>curred<br />

are the supplier's<br />

responsibility<br />

FIT contract<br />

v1.3.2_<br />

Article 2.4<br />

(b)<br />

You must also<br />

<strong>in</strong>clude signed<br />

commitment letters<br />

from sources of<br />

f<strong>in</strong>anc<strong>in</strong>g collectively<br />

represent<strong>in</strong>g<br />

at least 50 % of<br />

your expected<br />

<strong>development</strong> costs.<br />

(FIT contract v1.3.2_<br />

Article 2.4 (b))<br />

6<br />

Contract<br />

Requirements<br />

Notice to<br />

Proceed<br />

(Prerequisites)<br />

Request a notice to<br />

proceed from the OPA<br />

once you have<br />

completed and obta<strong>in</strong>ed<br />

the required approvals<br />

and permits. Your<br />

Notice to Proceed<br />

request must <strong>in</strong>clude:<br />

1) a copy of your Impact<br />

Assessment(s) as<br />

applicable<br />

connection impact<br />

assessment<br />

system impact<br />

assessment<br />

customer impact<br />

assessment<br />

2) a copy of your<br />

<strong>renewable</strong> <strong>energy</strong><br />

approval (REA)<br />

No later than<br />

six months<br />

before the<br />

milestone date<br />

for commercial<br />

operation.<br />

Note: For<br />

capacityallocation<br />

exempt<br />

<strong>project</strong>s, a<br />

completed<br />

Notice to<br />

Proceed<br />

request must<br />

be provided no<br />

later than the<br />

milestone date<br />

for commercial<br />

operation.<br />

OPA<br />

All costs <strong>in</strong>curred are<br />

the supplier's responsibility<br />

FIT contract<br />

v1.3.2_<br />

Article 2.4<br />

(b)<br />

3) domestic content<br />

plan<br />

4) f<strong>in</strong>anc<strong>in</strong>g plan<br />

Notice to Proceed Issued (Beg<strong>in</strong> build<strong>in</strong>g your <strong>project</strong>)<br />

7<br />

Fees and<br />

Securities<br />

Second<br />

Completion<br />

and<br />

Performance<br />

Def<strong>in</strong>ed as the<br />

<strong>in</strong>cremental Notice to<br />

Proceed security.<br />

Due with<strong>in</strong> 30<br />

days of the<br />

Notice to<br />

Proceed be<strong>in</strong>g<br />

OPA<br />

$25/kW for solar PV<br />

$10/kW for all other<br />

<strong>project</strong>s<br />

$5/kW for community-<br />

FIT contract<br />

v1.3.2_<br />

Article 5<br />

FIT Rules