Notice to Proceed Issued (Beg<strong>in</strong> build<strong>in</strong>g your <strong>project</strong>)<br />

7<br />

Fees and<br />

Securities<br />

Second<br />

Completion<br />

and<br />

Performance<br />

Security<br />

Def<strong>in</strong>ed as the<br />

<strong>in</strong>cremental Notice to<br />

Proceed security.<br />

Due with<strong>in</strong> 30<br />

days of the<br />

Notice to<br />

Proceed be<strong>in</strong>g<br />

issued<br />

OPA<br />

$25/kW for solar PV<br />

$10/kW for all other<br />

<strong>project</strong>s<br />

$5/kW for communitybased<br />

or Aborig<strong>in</strong>al<br />

<strong>project</strong>s with greater than<br />

50% participation levels.<br />

(Reimbursable once<br />

<strong>project</strong> reaches commercial<br />

operation, also<br />

reimbursable under FIT<br />

contract v3.1.2, 2.4 (a)<br />

and 2.1(g))<br />

FIT contract<br />

v1.3.2_<br />

Article 5<br />

FIT Rules<br />

v1.4_Section<br />

3 & 6<br />

8<br />

Contract<br />

Requirements<br />

Commercial<br />

operation<br />

prerequisites:<br />

These<br />

time<br />

frames<br />

beg<strong>in</strong> on<br />

the FIT<br />

contract<br />

date, and<br />

depend on<br />

the type<br />

of <strong>project</strong><br />

as follows:<br />

three<br />

years for<br />

solar PV,<br />

bio<strong>energy</strong><br />

and<br />

on-shore<br />

w<strong>in</strong>d<br />

four years<br />

for<br />

off-shore<br />

w<strong>in</strong>d<br />

five years<br />

for<br />

waterpower<br />

Electricity supply<br />

contract and approved<br />

meter<strong>in</strong>g plan.<br />

A s<strong>in</strong>gle-l<strong>in</strong>e electrical<br />

draw<strong>in</strong>g must be submitted<br />

to the OPA that identifies<br />

the connection po<strong>in</strong>t and<br />

the transmission and<br />

distribution facilities,<br />

<strong>in</strong>clud<strong>in</strong>g the transformer<br />

station(s) that are close to<br />

the <strong>project</strong>.<br />

At least 90% of the FIT<br />

contract capacity must<br />

be <strong>in</strong>stalled.<br />

Independent Eng<strong>in</strong>eer<br />

Certificate “IE Certificate”<br />

from an <strong>in</strong>dependent<br />

eng<strong>in</strong>eer.<br />

This is a list of<br />

documents <strong>in</strong> order to<br />

assess whether the COD<br />

has been achieved.<br />

Before<br />

milestone date<br />

for Commercial<br />

Operation Date<br />

"COD".<br />

Before<br />

milestone date<br />

for Commercial<br />

Operation Date<br />

(COD)<br />

Before<br />

Commercial<br />

Operation Date<br />

(COD)<br />

Before<br />

milestone date<br />

for Commercial<br />

Operation Date<br />

(COD)<br />

OPA<br />

OPA<br />

OPA<br />

OPA<br />

All costs <strong>in</strong>curred<br />

are the supplier's<br />

responsibility<br />

All costs <strong>in</strong>curred<br />

are the supplier's<br />

responsibility<br />

All costs <strong>in</strong>curred<br />

are the supplier's<br />

responsibility<br />

All costs <strong>in</strong>curred<br />

are the supplier's<br />

responsibility<br />

FIT contract<br />

v1.3.2_<br />

Article 2.5 &<br />

2.6<br />

FIT contract<br />

v1.3.2_<br />

Article 2.5 &<br />

2.6<br />

FIT contract<br />

v1.3.1_ Article<br />

2.5 & 2.6<br />

FIT contract<br />

v1.3.2_<br />

Article 2.5 &<br />

2.6<br />

OPA's update<br />

<strong>in</strong>-series connection<br />

systems<br />

http://fit.powerauth<br />

ority.on.ca/Page.as<br />

p?PageID=924&Con<br />

tentID=10261<br />

A declaration of<br />

commercial operation<br />

must be submitted <strong>in</strong><br />

the prescribed form to<br />

the OPA (see Exhibit F<br />

of the FIT contract<br />

agreement).<br />

Before<br />

milestone date<br />

for Commercial<br />

Operation Date<br />

(COD)<br />

OPA<br />

All costs <strong>in</strong>curred<br />

are the supplier's<br />

responsibility<br />

FIT contract<br />

v1.3.2_<br />

Article 2.5 &<br />

2.6<br />

9<br />

Contract<br />

Requirements<br />

Domestic<br />

Content<br />

Report<br />

A report outl<strong>in</strong><strong>in</strong>g how<br />

your <strong>project</strong> has met<br />

the domestic content<br />

requirements.<br />

With<strong>in</strong> 60 days<br />

after your<br />

<strong>project</strong> reaches<br />

commercial<br />

operation<br />

OPA<br />

All costs <strong>in</strong>curred<br />

are the supplier's<br />

responsibility<br />

FIT contract<br />

v1.3.2_Article<br />

2.11 & Item<br />

22_Exhibit D<br />

Commercial Operation Achieved<br />

10<br />

Contract<br />

Management<br />

Receive<br />

payments<br />

Once your <strong>project</strong> has<br />

reached commercial<br />

operation (FIT contract<br />

v1.3.2_Article 2.6(a)), you<br />

will beg<strong>in</strong> to receive<br />

payments for its<br />

electricity production<br />

accord<strong>in</strong>g to the<br />

meter<strong>in</strong>g and settlement<br />

payment requirements<br />

set out <strong>in</strong> the contract.<br />

N/A<br />

OPA<br />

N/A<br />

First and Second<br />

Completion, and<br />

Performance Securities<br />

returned (reimbursable<br />

once <strong>project</strong> reaches<br />

commercial operation,<br />

also reimbursable under<br />

FIT contract v3.1.2, 2.4<br />

(a) and 2.1(g))<br />

FIT contract<br />

v1.3.2_Article<br />

4<br />

FIT Rules<br />

v1.4_Section 7<br />

22