Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

Page 1<br />

<strong>SPECIAL</strong> <strong>CONDITIONS</strong> <strong>OF</strong> <strong>TENDER</strong><br />

INTRODUCTION<br />

For the purposes of this Invitation to Tender, the Agency's "General Conditions of Tender for<br />

ESA Contracts", available on http://emits.esa.int/emits/owa/emits.main under “Reference<br />

Documents” → “Administrative Documents” and referred to hereafter as the "General<br />

Conditions of Tender", shall apply as specified, amended or supplemented by these Special<br />

Conditions of Tender. In the event of conflict between the General and the Special<br />

Conditions, the Special Conditions shall prevail.<br />

CONTENT <strong>OF</strong> THE OUTLINE PROPOSAL<br />

The overview of the intended proposal shall be submitted via an online form on the ESA<br />

Telecom Website (http://telecom.esa.int/startup) as detailed in Section 4 of the Statement of<br />

Work and shall comprise:<br />

- A description of the identified opportunity, including the potential target market and<br />

the competitive environment;<br />

- A description of the proposed solution in terms of the technology required, the<br />

product or service provided and, if appropriate, how it fits with other elements of the<br />

value chain;<br />

- A description of the approach taken to elaborate and develop the opportunity within<br />

this scheme, ensuring that the proposed activities remain in line with the Statement of<br />

Work;<br />

- Depending on the stage of maturity of the technology involved or the commercial risk<br />

perceived, an indication whether the proposed development is proposed under a fully<br />

funded (100%) or co-funded scheme (50%) and provide a justification for the funding<br />

scheme requested;<br />

- A statement of the cost of the initiative (i.e. the value of the work), which shall not<br />

exceed the value of 300,000 Euro. Depending on the above point, the ESA funding<br />

(price for ESA of the activity) will be either 100% or 50% of the cost.<br />

Bidders will be notified within 4 weeks from the date of submission whether they are invited<br />

to proceed with the submission of the complete proposal.<br />

CONTENTS <strong>OF</strong> THE SECOND STAGE COMPLETE PROPOSAL<br />

1. COVER LETTER<br />

The cover letter shall contain the following:<br />

- a general paragraph introducing the proposed project<br />

- a statement of total cost and price for the proposed activity<br />

- a statement that the proposal will be valid for 4 months from the date of submission


Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

Page 2<br />

- a statement that the conditions of the draft contract are read, understood and accepted<br />

and that any sales conditions of the Tenderer do not apply<br />

- a statement of compliance with the technical and management requirements of the<br />

statement of work (and if applicable any reservations to be clearly stated)<br />

- an indication of name(s) and contact details (address, telephone, fax and e-mail<br />

numbers) of the person(s) to whom all communications relating to the ITT should be<br />

addressed<br />

- The names of the persons who will be responsible for the technical and contractual<br />

management of any resulting Contract and who would be nominated as such in the<br />

Contract.<br />

- the provision of address and ESA Bidder Code of Prime and (if applicable) any<br />

subcontractor. Please note that if your company (or your subcontractor) have not yet<br />

been allocated a Bidder Code by the Agency, it should be requested by accessing the<br />

following URL:<br />

http://emits.esa.int/emits-doc/e_support/coveremits1.html<br />

- signature of cover letter by authorised representative<br />

2. CONTENTS <strong>OF</strong> THE TECHNICAL PROPOSAL<br />

The Technical Proposal provides the rationale for the proposed development activities<br />

and forms the contractual baseline description of the proposed scope of work.<br />

It shall consist of an Executive Summary and all Applicable Documents as referred to<br />

in Section 5.2 of the Statement of Work (Appendix 1 to this ITT).<br />

The Executive Summary shall present in a concise and self-contained manner the<br />

major elements of the proposed project in terms of:<br />

- presentation of the intended product and its associated operational<br />

environment<br />

- overview of the opportunity and commercial strategy<br />

- intended approach for the organisation and execution of the development<br />

activity<br />

- critical issues affecting the development


Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

Page 3<br />

3. CONTENTS <strong>OF</strong> THE FINANCIAL, MANAGEMENT AND ADMINISTRATIVE<br />

PROPOSAL (including costing, planning, WBS, etc. and contractual response)<br />

3.1 BACKGROUND EXPERIENCE <strong>OF</strong> THE COMPANY(IES)<br />

The tenderer shall describe the relevant experience that he, and his subcontractors, if<br />

any, have for the performance of the work which is subject of the present ITT.<br />

3.2 ORGANISATION AND MANAGEMENT<br />

3.2.1 The tenderer shall present the structure of his organisation, and where it is proposed to<br />

subcontract part of the work, the structure of the industrial group. The structure of the<br />

group and of the individual companies shall be shown by means of organigrammes,<br />

which clearly show the tasks, position, authority, and name of the persons proposed<br />

for the work, and in particular the study/project manager and the Contracts officer.<br />

Lines of communication and reporting, and means for settling disagreements shall be<br />

described.<br />

3.2.2 The tenderer shall present his management plans, policies and procedures for this<br />

activity including a discussion of the management control organisation, the<br />

procedures that will be used to exercise control over the project and the proposed<br />

subcontracting control (if any).<br />

3.3 FACILITIES<br />

The tenderer shall submit a brief description of all facilities which are proposed to be<br />

used for the work offered, including those facilities which are still to be<br />

developed/built and/or purchased, (with a statement whether the costs of<br />

developing/building/ purchasing the facility are to be directly or indirectly charged to<br />

the Contract). Modifications to existing facilities are also to be described. For the<br />

purposes of this provision facilities include hardware/computer<br />

software/manufacturing and test equipment/ computers/word processors, etc.<br />

The tenderer shall also describe what means of access to information resources, such<br />

as libraries, databases etc. he has, if these are required for the work proposed.<br />

3.4 KEY PERSONNEL<br />

Key personnel are defined as persons who, because of their individual qualifications<br />

and positions are proposed for the work, and indicated as such in the tenderer's<br />

organigramme. Key personnel should be proposed to one level below the<br />

study/project manager, both for the main Contractor and any sub-contractors. The<br />

provisions of Article 5 of the Contract shall apply to all key personnel.<br />

For each key person identified, the tenderer shall:


Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

Page 4<br />

- provide a curriculum vitae, giving in particular the work experience of the<br />

person concerned, and a brief description of the person's present job and<br />

responsibilities;<br />

- indicate his position in the tenderer's organisation;<br />

- define the proportion of the person's working time that is devoted to the work<br />

offered.<br />

3.5 LIST <strong>OF</strong> ITEMS TO BE PRODUCED, TO BE DELIVERED<br />

The bid shall contain a complete list of all items that are to be produced under a<br />

resulting contract. Also to be shown in this list is each item to be procured under the<br />

contract if its cost exceed 100 KEuro. All those items are deliverable to the Agency,<br />

unless otherwise agreed in the contract.<br />

3.6 WORK BREAKDOWN STRUCTURE (WBS)<br />

- Objectives:<br />

The tenderer shall submit a Work Breakdown Structure. The purpose is to obtain a<br />

systematic description of the tasks to be performed to meet the requirements of the<br />

contract which enables a proper evaluation of the work content, its costing and of the<br />

proposed planning. The WBS will also constitute a framework for the management of<br />

the subsequent contract. It is therefore important that the descriptive terminology for<br />

tasks and products be consistent with that used in the ITT and in the other parts of the<br />

tender.<br />

With his offer, the tenderer shall submit:<br />

! A WBS properly drawn, and coherent in organisation and contents<br />

with the rest of his proposal;<br />

! A narrative explanation of his WBS if this is useful to its<br />

understanding;<br />

! As many Work Package (WP) descriptions (PSS-A20) as there are<br />

WP’s at the level required, in accordance with the instructions given in<br />

Annex 3.<br />

3.7 PLANNING<br />

The expected total duration of a contract is 12 months.<br />

The tenderer shall include in his offer planning documents that accurately present the<br />

main objectives of the envisaged work, identify the tasks required to achieve these<br />

objectives, and clearly and realistically present the sequence in which these tasks are<br />

proposed to be performed. The planning documents will be coherent and consistent<br />

both mutually and with all other aspects of the proposal. They will be complemented<br />

by a narrative describing the particular features of the proposed planning and the<br />

reasoning that gave rise to the proposed solution.<br />

The tenderer shall submit a logic bar chart.


Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

Page 5<br />

Major interdependencies between bars shall be shown with a connecting line and<br />

should include a suitable description of the interface. The following requirements<br />

shall be observed:<br />

• the activities presented by the bars shall be presented on a linear timescale<br />

shown either in weeks or months;<br />

• the estimated durations shall be based upon normal working conditions;<br />

• the proper sequence of tasks, together with the appropriate interfaces with<br />

other project participants and outside restraints (including inputs and outputs<br />

of the Agency) shall be given.<br />

The tenderer shall identify in the planning documents all of the events to which he<br />

proposes to link payments. The event numbering of the network will be used to<br />

identify the milestone in the payments plan.<br />

If the schedule or the delivery of items are modified during subsequent negotiations<br />

between the Agency and the successful tenderer, the planning and scheduling<br />

documents affected shall be resubmitted for approval. Such documents shall be in<br />

conformity with the provisions set forth above.<br />

In establishing his planning, the tenderer shall take account of the need of the Agency<br />

to review and/or approve intermediate deliverables and shall include sufficient time<br />

for the Agency to do this.<br />

3.8 COST PRICE DATA<br />

The following PSS-A documents [latest version available on EMITS under<br />

“Reference Documents”] included in the General Conditions of Tender as Annex 5(3)<br />

shall be completed for the Prime Contractor and for each Sub-Contractor proposed, if<br />

applicable:<br />

PSS-A1, issue no. 2<br />

Company Cost Element Data Sheet (unless already supplied - see Annex 5/3 of<br />

General Conditions)<br />

PSS-A2, issue no. 3<br />

Company Price Breakdown Form including Exhibit A to PSS-A2<br />

PSS-A8, issue no. 3<br />

Manpower and Price Summary at Work Package Level<br />

NOTES<br />

(a) The total allowable cost of the offer must not exceed 300 000 €.<br />

For fully funded activities, the Agency has earmarked a maximum budget of<br />

300 000 €.


Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

Page 6<br />

For co-funded activities, the Agency has earmarked a maximum budget of<br />

150 000 €.<br />

(b)<br />

(c)<br />

(d)<br />

(e)<br />

(f)<br />

Above forms shall be made for the total development programme. For cofunded<br />

activities, i.e. including the share to be paid for by the tenderer. The<br />

tenderer shall submit a summary table showing the cost in National Currencies<br />

and the prices in EURO or (Canadian companies only) Canadian $, per<br />

company and for the total.<br />

For co-funded activities, in addition, the following points have to be taken<br />

into account:<br />

The source of the company contribution shall be explicitly stated in the<br />

tenderer’s proposal. In this context, the “company contribution” shall be<br />

deemed to include Third Party sources, if any.<br />

All costs incurred under this contract shall be collected against a specific<br />

project number. All direct hours and other direct costs incurred in the<br />

performance of the contract are to be treated as direct hours and costs in the<br />

tenderer’s account and indirect costs shall be charged to the contract in<br />

accordance with the company’s standard accounting system.<br />

The company contribution can be treated as a loss against the contract or may<br />

be contributed by a Third Party private source. The contribution shall be not<br />

be allowed from a public body. The tenderer is not allowed to include his<br />

contribution in overheads included in rates charged to the Agency for the<br />

contract or any other contract with the Agency, or sub-contract award under an<br />

Agency contract.<br />

Any manpower made available by the pilot end user community as well as<br />

advertising/exhibition costs in relation to the proposed project will not be<br />

considered as part of the contractual cost.<br />

3.9 PR<strong>OF</strong>IT<br />

(a)<br />

(b)<br />

For fully funded activities, the fee (profit) shall not exceed eight (8) per cent of<br />

the base cost, defined in item ten (10) of the Company Price Breakdown Form<br />

PSS A2, issue no. 2.<br />

For co-funded activities, in view of the particular nature of the Programme the<br />

Agency’s share of the Contract price will not include profit.<br />

3.10 CONVERSION RATES<br />

For the purpose of currency conversions involving national currencies NOT belonging<br />

to the EURO-area, bidders are required to clearly specify the exchange rate used and<br />

to indicate any other factors (e.g. hedging costs, forwarding buying rates, etc.) used<br />

for the purpose of their calculations.


Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

Page 7<br />

3.11 TYPE <strong>OF</strong> PRICE<br />

The type of price is defined in the Draft Contract (Appendix 2 to this ITT) and will be<br />

a firm fixed price.<br />

3.12 MILESTONE PAYMENTS PLAN<br />

The payments plan to be proposed in accordance with Paragraph C.7 of the General<br />

Conditions of Tender shall take into account Clauses 20, 21 and 22 of the Draft<br />

Contract.<br />

All claims for payment (with the exception of the Advance payment) shall be linked<br />

to the achievement of milestones defined in section 5.3 of Appendix 1 to this ITT.<br />

3.13 TRAVEL AND SUBSISTENCE PLAN<br />

The tenderer shall submit a brief description of the travels he envisages for the<br />

execution of the Contract together with the related cost details. This shall preferably<br />

be given in the form of the following matrix:<br />

Participants<br />

Meeting Place Time<br />

(To+.....)<br />

Company A<br />

Company<br />

B<br />

Company C, etc.<br />

3.14 CONTRACT <strong>CONDITIONS</strong><br />

The tenderer shall confirm his acceptance of the Contract Conditions with any<br />

exceptions to be clearly stated.


Annex 1 to<br />

Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

ANNEX 1A - EVALUATION CRITERIA FOR THE<br />

FIRST STAGE OUTLINE PROPOSAL<br />

In evaluating the proposal(s) ESA will use the following criteria:<br />

1. CREDIBILITY <strong>OF</strong> THE IDENTIFIED OPPORTUNITY<br />

2. QUALITY <strong>OF</strong> PROPOSED PROGRAMME <strong>OF</strong> WORK


Annex 1 to<br />

Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

ANNEX 1B - EVALUATION CRITERIA FOR THE<br />

SECOND STEP COMPLETE PROPOSAL<br />

In evaluating the Complete Proposal(s) ESA will use the following criteria:<br />

1. Credibility of the identified opportunity and the commercial strategy<br />

2. Quality of the technical proposal and suitability of the proposed programme of<br />

work<br />

3. Company experience, calibre of key personnel, management and planning<br />

4. Adequacy of costing and pricing for the execution of the work<br />

5. Compliance with administrative tender conditions and acceptance of contract<br />

conditions.


Annex 2 to<br />

Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

ANNEX 2 - ACKNOWLEDGEMENT <strong>OF</strong> RECEIPT<br />

AO/1-4444/03/NL/JSC – Satellite communication system elements, technologies and<br />

applications – Opportunities for Start-Uo projects – third round<br />

TO:<br />

Mr J Schaper (IMT-CS)<br />

Fax: +31.71.565.5872<br />

ESTEC, PO Box 299, 2200 AG Noordwijk, The Netherlands<br />

We confirm that we have received the above mentioned ITT with all attachments and we<br />

state the following (*):<br />

0 We intend to submit an offer<br />

0 We have not yet decided whether to submit an offer but will advise you within 14<br />

days of date of publication of ITT<br />

0 We do not intend to submit an offer:<br />

- time / resources not available YES/NO<br />

- subject matter outside our scope of activities YES/NO<br />

COMPANY NAME:________________________________________________________<br />

ADDRESS:<br />

_____________________________________________________________<br />

_________________________________________________________________________<br />

PHONE NO. ________________________TELEFAX NO:_________________________<br />

NAME AND FUNCTION <strong>OF</strong> PERSON TO CONTACT :__________________________<br />

_________________________________________________________________________<br />

DATE:_____________________________SIGNATURE:__________________________<br />

-------------------------------------------------------------------------------------------------------------<br />

(*) Please delete or complete, as appropriate<br />

N.B.<br />

Tenderers are requested to complete and return this form by fax as well as to express their interest in<br />

this tender action on the EMITS website. Failure to comply with this may result in necessary<br />

subsequent information not being received by invitees to tender.


Annex 3 to<br />

Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

ANNEX 3: INSTRUCTIONS FOR COMPLETING FORM PSS-A20<br />

The purpose of this form is to obtain a detailed description of the work to be performed under<br />

this Work Package (WP).<br />

Unless specified otherwise in the Special Conditions of Tender, WP descriptions are to be<br />

supplied at the task/equipment level. Each form shall contain the following information:<br />

• Name of project<br />

• Designation of project phase (if applicable)<br />

• Work package reference defined in Work Breakdown Structure<br />

• Title of Work Package<br />

• Firm responsible for execution of the Work Package (contractor)<br />

• Major constituent to which the work package belongs. This shall not be limited to<br />

hardware subsystems but shall cover, as appropriate, functional task areas, such as<br />

management, product assurance, etc.<br />

• Identifier of the start event which denotes commencement of the work package<br />

activities on the respective network<br />

• Plan date of the work package start event. The date shall be based on planning<br />

calculations<br />

• Identifier of the end event, which denotes completion of the work package activities<br />

on the respective network<br />

• Plan date of the work package end event. The date shall be based on planning<br />

calculations<br />

• The name of the contractor's employee responsible for the work package (WP<br />

manager)<br />

• Number of the sheet and total number of sheets pertaining to a given Work Package<br />

Description (use continuation sheets as appropriate)<br />

• Issue number of the Work Package Description<br />

• Date of latest issue of the Work Package Description<br />

• Objective of the work performed within this work package (objective)<br />

• List of items (documentation and/or hardware) which must be completed, or be<br />

available to start the work package (inputs)<br />

• Description of the tasks that shall be executed within this work package (tasks)


Annex 3 to<br />

Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

• List of tasks specifically excluded, if appropriate, in order to increase clarity of the<br />

scope of the work package (tasks excluded)<br />

• List of items (documentation and/or hardware) which must be completed, or be<br />

available to end the work package (outputs/deliverables).


Annex 3 to<br />

Appendix 3 to<br />

AO/1-4444/03/NL/JSC<br />

WORK PACKAGE DESCRIPTION<br />

PSS-A-20<br />

PROJECT: PHASE: WP REF:<br />

WP Title<br />

Sheet<br />

of<br />

Contractor<br />

Major Constituent<br />

(e.g. Subsystem)<br />

Start event:<br />

End Event:<br />

WP Manager:<br />

Planned Date:<br />

Planned Date:<br />

Issue Ref<br />

Issue Date<br />

Objective:<br />

Inputs:<br />

Tasks:<br />

Tasks excluded:<br />

Outputs/Deliverables: