24.10.2014 Views

Vogtle - AppendixR.com

Vogtle - AppendixR.com

Vogtle - AppendixR.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUPPLEMENTAL INFORMATION<br />

KEY POINTS OF CONTACT<br />

Licensee personnel:<br />

J. Dillon, Performance Analysis Engineer<br />

S. Douglas, Manager Operations<br />

K. Holmes, Performance Analysis Supervisor<br />

W. Kitchens, Nuclear Plant General Manager<br />

J. Lattner, Fire Protection Engineer<br />

B. Lewis, Plant Instructor<br />

K. Lowery, Senior Licensing Engineer<br />

L. Rains, Fire Protection System Engineer<br />

R. Reddy, Senior Engineer<br />

J. Robinson, Unit Superintendent Operations<br />

J. Seay, Senior Engineer<br />

G. Senicz, Senior Engineer<br />

T. Tidwell, Engineering Supervisor<br />

Other licensee employees contacted included office support, operations, engineering,<br />

maintenance, radiation, and corporate personnel.<br />

NRC personnel:<br />

G. McCoy, Senior Resident Inspector<br />

T. Morrissey, Resident Inspector<br />

W. Rodgers, Senior Risk Analyst, Region II<br />

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED<br />

Opened and Closed<br />

05000425/2004007-001 NCV Inadequate Fire Protection Pre-fire Plan to Ensure<br />

Adequate Environmental Conditions for Operators to<br />

Access Required Equipment (Section 1R05.02).<br />

Discussed<br />

None<br />

Attachment

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!