Environmental Assessment - MdTA
Environmental Assessment - MdTA
Environmental Assessment - MdTA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
volumes and congestion increase throughout the area, resulting in increased travel time to<br />
and from each facility.<br />
Neither of the Build Alternatives would result in any direct impacts to schools or school<br />
facilities. Improvements to I-95 and associated roadways will not affect any of the ingress or<br />
egress points at any of the school facilities, however temporary detours or delays may occur<br />
to school bus routes as a result of construction activities.<br />
It is expected that upon completion, the improvements proposed under each of the Build<br />
Alternatives will have a positive affect on local schools by providing safer and more efficient<br />
travel to and from each school facility.<br />
b. Places of Worship<br />
Twenty churches or other places of worship are located within or immediately adjacent to the<br />
Section 200 study area. Places of worship include:<br />
• New Life Baptist Church<br />
• Beacon Baptist Church<br />
• Salem United Methodist Church (and cemetery)<br />
• St. Stephens Roman Catholic Church (and cemetery)<br />
• Franklinville United Presbyterian Church (and cemetery)<br />
• Community Baptist Church<br />
• Bridge of Hope Church<br />
• St. Mary’s Byzantine Catholic Church<br />
• Trinity Reformed Baptist Church<br />
• Trinity Evangelical Lutheran Church (and cemetery)<br />
• St. Francis de Sales Roman Catholic Church (and cemetery)<br />
• Cokesbury Memorial Methodist Church<br />
• Jon Wesley United Methodist Church (and cemetery)<br />
• Lighthouse Christian Academy<br />
Section 200 Draft <strong>Environmental</strong> <strong>Assessment</strong><br />
III-28