Nuclear
Nuclear
Nuclear
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Our <strong>Nuclear</strong> Business - Clean Up<br />
Clean Up<br />
Atkins has been involved in the nuclear clean up<br />
since the late 1980s working with Sellafield Ltd<br />
(formally BNFL), Magnox and UKAEA.<br />
Atkins was quick to recognise that the engineering skills acquired<br />
in the offshore sector were transferable to the nuclear clean up<br />
market where there was a demand for remote operations. Early<br />
projects included the Windscale Pile Chimneys project management<br />
and engineering, Windscale Piles Managing Agent, Dounreay BFR<br />
Decommissioning safety case and Berkeley Active Waste Vaults<br />
Recovery engineering and safety case.<br />
Case Study<br />
Sellafield Legacy Pond<br />
The clean up of the First Generation Magnox Storage Pond at<br />
Sellafield is widely acknowledged as one of the most challenging<br />
projects in the NDA estate. Atkins have been providing engineering<br />
services to the project for over a decade.<br />
The portfolio of projects includes:<br />
• Ponds Alliance<br />
• Export Re-equipping<br />
• Pond Retrievals<br />
• Sludge and Process Packaging Plant<br />
Atkins is delivering the work through the ACKtiv <strong>Nuclear</strong> Joint<br />
Venture, alongside Aker Solutions and Carillion. Atkins is providing<br />
multidiscipline engineering services to the project, including civil,<br />
structural, seismic and mechanical handling.<br />
Our <strong>Nuclear</strong> Business - Clean Up