Nuclear
Nuclear
Nuclear
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Key<br />
Operational<br />
Decommissioning<br />
Atkins Office<br />
Dounreay<br />
<strong>Nuclear</strong> Generation<br />
Glasgow Office<br />
• Established in late 1990s<br />
• <strong>Nuclear</strong> safety specialism<br />
• Power plant life extension<br />
• Civil & structural support to British<br />
Energy specialist group at East Kilbride<br />
Hunterston<br />
B<br />
A<br />
Chapelcross<br />
Torness<br />
Whitehaven Office<br />
• Established in mid 1980s<br />
to support Sellafield<br />
• Traditional civil engineering<br />
consultancy until establishment of<br />
ACKtiv Joint Venture in 2002<br />
• Now a multi-million pound/annum<br />
clean up business<br />
Warrington Office<br />
• Established in 1990s<br />
• Regulatory interface<br />
and nuclear safety<br />
compliance<br />
• Advisors to site<br />
licence companies<br />
and regulators<br />
including NII and EA<br />
• Safety support to<br />
major projects such as<br />
Dounreay Fast Reactor<br />
decommissioning<br />
Calder Hall<br />
Trawsfynydd<br />
Sellafield<br />
Heysham 1 2<br />
Springfields<br />
Wylfa<br />
Capenhurst<br />
Berkeley<br />
Oldbury<br />
Harwell<br />
Hartlepool<br />
Bradwell<br />
Sizewell<br />
B<br />
A<br />
Rotherham Office<br />
• Atkins acquired MG<br />
Bennett & Associates<br />
Ltd in 2008 to build<br />
upon our existing,<br />
extensive, mechanical<br />
assessment capability<br />
• Bennett Associates<br />
has been involved in<br />
the nuclear sector for<br />
over 20 years<br />
• Expertise in the<br />
assessment of cranes,<br />
lifting and mechanical<br />
handling<br />
A B<br />
Hinkley Point<br />
Winfrith<br />
AWE<br />
B A<br />
Dungeness<br />
Bristol Office<br />
• Established through extent of British Energy work in 1991<br />
• Growth on ‘Long Term Safety Reviews’ during 1990s<br />
• Built on a ‘smart‘ structural engineering capability, now has<br />
a multidiscipline capability<br />
• <strong>Nuclear</strong> power station base operational<br />
Epsom Office<br />
• Dominated by our work in support of AWE<br />
• Steady growth in workload up until 2001<br />
• Huge growth from 2001 onwards on new facility design<br />
• Currently £18 million / annum fees<br />
<strong>Nuclear</strong> Generation • 280+ designers currently engaged