Annual Report 2010.pdf - Mississippi Department of Transportation
Annual Report 2010.pdf - Mississippi Department of Transportation
Annual Report 2010.pdf - Mississippi Department of Transportation
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Requester: MHAYDEN<br />
MS DEPARTMENT OF TRANSPORTATION<br />
Page 24 <strong>of</strong> 56<br />
<strong>Report</strong> ID: DR000151 Construction Proj Expenditures by County<br />
09/17/2010 09:50:02 am<br />
For Fiscal Year: 2010<br />
Project<br />
Fiscal Year Total<br />
Project # Program Type<br />
Project Description Expenditures Expenditures<br />
*************** Kemper ***************<br />
100573 / 1000 State Projects ENG SR 397 BT SR 16 & WINSTON CL 518,740.15 2,642,788.13<br />
100596 / 1000 State Projects ENG SR 16 FROM SCOOBA TO ALABAMA STATE LINE 151,973.78 1,095,713.26<br />
100596 / 201000 Surface <strong>Transportation</strong> Program(STP) ROW SR 16 BT SCOOBA AND ALA SL (REALIGN) 111,124.42 1,174,410.45<br />
102175 / 101000 State Projects ENG SR 16 FM SR 397 TO 3 LN, E OF DEKALB (ADD 1 LANE) 10,875.00 10,875.00<br />
105426 / 101000 Vision 21 ENG SR 493 FROM LAUDERDALE CL TO SR 16 397,806.18 681,398.82<br />
105426 / 301000 Vision 21 CON SR 493 FROM LAUDERDALE CL TO SR 16 5,455,401.52 6,168,474.79<br />
County Total 6,645,921.05<br />
*************** Lafayette ***************<br />
100297 / 2000 Bridge ENG SR 331 REPLACE BRIDGE BT SR 9 & 334 -24,058.10 248,321.76<br />
100297 / 202000 Bridge ROW SR 331 REPLACE BRIDGE BT SR 9 & SR 334 53,815.65 297,734.07<br />
100297 / 302000 Regular-ARRA CON **SR 331 REPLACE BRIDGE BT CALHOUN C.L. & SR 334 3,431,373.17 3,431,373.17<br />
100297 / 303000 Bridge CON SR 331 REPLACE BRIDGE BT ST 9 & SR 334 [Bridge Number 6.90] 21,473.57 1,251,233.70<br />
102168 / 101000 Vision 21 ENG SR7 BTW SR9 & 2 MI NORTH OF SR6 W/ INTCH 4,623.28 723,015.53<br />
102221 / 101000 Surface <strong>Transportation</strong> Program(STP) ENG SR6 @ JACKSON AVENUE OXFORD STP-FY00(001) 12,549.30 419,185.86<br />
102221 / 102000 State Projects ENG SR6 @ JACKSON AVENUE [DPS Project] 266,468.09 440,510.61<br />
102454 / 101000 Bridge ENG SR7 @ TALLAHATCHIE RIVER PE 120,860.34 409,263.10<br />
103326 / 101000 Bridge ENG SR 328 FR SR 7 TO SR 315 BR NOS 2.4,4.1, 5.3, 7.8, 9.2,11.7,10.0,10.3 10,502.67 356,748.07<br />
104501 / 301000 Pavement Rehabilitation CON SR6(US278) BELK FORD TO PUNKIN ROAD -4,327.75 2,994,967.70<br />
104874 / 811000 Special Projects(Demo) ENG Toby Tubby Parkway, Oxford MS 153,720.94 415,745.51<br />
104880 / 701000 Surface <strong>Transportation</strong> Program(STP) CON Univ <strong>of</strong> MS-Retaining wall @ Gertrude Blvd. Construct a 500' long dual level retaining wall at Gertrude 27,951.69 Ford Blvd. to stabilize the 377,807.69 existing embankment<br />
105187 / 402000 Safety CON City <strong>of</strong> Oxford - Develop and Implement Education, Encouragement and Evaluation Programs.23,394.00 41,196.00<br />
105635 / 701000 Regular-LPA ARRA CON City <strong>of</strong> Oxford- Mill & Overlay four FA routes: Jackson Avenue, Old Taylor Road (8601), Old Taylor 167,294.06 Road (9426) and Belk Drive. 167,294.06<br />
105635 / 705000 Regular-LPA ARRA CON City <strong>of</strong> Oxford- Mill & Overlay FA Routes 1,069.95 1,069.95<br />
County Total 4,266,710.86<br />
*************** Lamar ***************<br />
102519 / 1000 Bridge ENG US 11 REPLACE 5 BRIDGES BETWEEN LUMBERTON & PURVIS 40,448.35 927,606.91<br />
102519 / 201000 Bridge ROW US 11 REPLACE 5 BRIDGES BETWEEN LUMBERTON & PURVIS 563,153.07 563,153.07<br />
104654 / 201000 Safety ROW MS 589 @ OLD HIGHWAY 24 50,704.66 302,650.50<br />
104654 / 301000 Safety CON MS 589 @ OLD HIGHWAY 24 957,393.08 1,722,942.20<br />
104833 / 701000 Urban CON Lamar Co. BOS - West 4th Str, (B) from Sam Rayburn Dr. to City Limits. 49,356.60 3,149,150.95<br />
dw_const_project_exps_by_county