Towards a common European methodology for <strong>Life</strong> Cycle Costing (<strong>LCC</strong>) – Guidance Document<br />

29<br />

5.4.3 Scope of the analysis (Step 2)<br />

Confirmation of the precise scope and extent of the <strong>LCC</strong> exercise with the client is a key<br />

early stage in the process and should include:<br />

The purpose for carrying out the <strong>LCC</strong> exercise<br />

The stage(s) in the project or in the <strong>as</strong>set life at which the exercise is <strong>to</strong> be carried out<br />

The timing of the exercise and any key deadlines<br />

Any specific reporting requirements<br />

Where the detailed <strong>LCC</strong> analysis is <strong>to</strong> be carried out <strong>as</strong> part of the design stages of a project<br />

its timing will require careful planning. The exercise is best undertaken once sufficiently<br />

detailed designs, specifications and cost plans are available, but before they have been<br />

‘frozen’, in order that the preferred options identified <strong>as</strong> part of the <strong>LCC</strong> exercise can be fed<br />

back in<strong>to</strong> the design process in a timely manner.<br />

Since this particular use of <strong>LCC</strong> is most commonly concerned with <strong>as</strong>sessment of alternative<br />

design or specification options, it is often carried out within a workshop setting, either <strong>as</strong> a<br />

specific <strong>LCC</strong> workshop or <strong>as</strong> part of a broader Value Management or Value Engineering<br />

workshop. Project stakeholders including the design team and often the client and building<br />

users and managers are <strong>as</strong>sembled in a workshop setting <strong>to</strong> identify which systems/<br />

components are <strong>to</strong> be <strong>as</strong>sessed, and <strong>to</strong> identify a number of design/specification options for<br />

each. The detailed <strong>LCC</strong> analysis is then usually carried out outside of the workshop setting<br />

and results are fed back <strong>to</strong> participants. Clearly, <strong>LCC</strong> is likely <strong>to</strong> form one of a number of<br />

criteria in the option <strong>as</strong>sessment process, with others potentially including aesthetics,<br />

functional performance, environmental sustainability, e<strong>as</strong>e of <strong>construction</strong>, etc.<br />

5.4.4 Identifying the key parameters for the analysis (Steps 3-6, 9)<br />

The key parameters for the analysis will be determined <strong>to</strong> a large extent by its purpose and<br />

objectives, and by the nature of the client organisation. For example, a public sec<strong>to</strong>r client<br />

may be bound by national tre<strong>as</strong>ury requirements regarding one or more of the period of<br />

analysis, method of economic evaluation or discount rates <strong>to</strong> be used. A commercial<br />

developer on the other hand, will be constrained more by its internal requirements on<br />

investment returns or on issues relating <strong>to</strong> financing costs or market needs.<br />

Key parameters are discussed below:<br />

Costs <strong>to</strong> include<br />

The costs <strong>to</strong> be included in the exercise will depend on the stage in the <strong>as</strong>set life <strong>cycle</strong> at<br />

which the exercise is carried out, the objectives of the exercise, and the client’s economic<br />

and legal interest in the <strong>as</strong>set. For example, a public body that is <strong>to</strong> own and occupy an <strong>as</strong>set<br />

is likely <strong>to</strong> require all acquisition, use, maintenance and, depending on the time-frame,<br />

disposal costs <strong>to</strong> be included. However, a private sec<strong>to</strong>r client with a different economic or<br />

legal interest in the <strong>as</strong>set may decide <strong>to</strong> omit certain costs that will be borne by others (e.g.<br />

energy and certain maintenance costs <strong>to</strong> be borne by tenants). Similarly, a PPP provider<br />

might omit some facilities management costs if these activities are <strong>to</strong> be carried out by the<br />

public sec<strong>to</strong>r occupier.<br />

A decision will also be required on whether <strong>to</strong> include any incomes <strong>as</strong>sociated with the<br />

system/component (such <strong>as</strong> income from the sale of locally generated energy, or re<strong>cycle</strong><br />

Davis Langdon Management Consulting May 2007